Coincidence group report Analysis meeting, 13/04/20151.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Information Technology IBM DB2 Content Manager “Lunch N Learn” 03/14/2007.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
PROGRESS ON WATER PROPERTIES ON TRACKS RECONSTRUCTION Harold Yepes-Ramirez 09/11/2011.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
EEE RUN Database – last updates New tables to store information regarding hardware, software and data acquisition configurations of each telescope Telescope.
SQA Work Procedures.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Update on Corsika Simulation 29 June 2015 Fabrizio Coccetti 1.
Slide#: 1© GPS Financial Services Revised 05/03/2009 cms 2 RW Rep-AP-QuickVendorList ™ Cougar Mountain Software Professional Version.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Walk-and-Talk TM Remote Control Touch pad Pen Style Palette Erases All Marks at Once Left and Right Mouse Buttons Calibration Sends Screen Image to Printer.
A.meneguzzo, 03 april 2002 LNL- MB3 chamber test with cosmic triggers Some results on the tests performed on the MB3 chambers produced in Legnaro are presented.
G.Sirri – INFN Bologna videconf /14 Fiducial Mark Finding with ESS  Lateral Mark Finding [FlexMapX]: Recommended release 42b ( )
3 May 2011 VESF DA schoolD. Verkindt 1 Didier Verkindt Virgo-LAPP CNRS - Université de Savoie VESF Data Analysis School Data Quality and vetos.
Status of 2015 pledges 2016 requests RRB Report Concezio Bozzi INFN Ferrara LHCb NCB, November 3 rd 2014.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 14/09/20151.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Event Data History David Adams BNL Atlas Software Week December 2001.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 15/06/20151.
Major Information Flows in the Production Process
First look at November 2008 data for EMEC module Maslennikov Alexei, Khoroshilov Andrey Budker Institute of Nuclear Physics, Novosibirsk Liquid Argon week,
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
First Look at Data and MC Comparisons for Cedar and Birch ● Comparisons of physics quantities for CC events with permutations of Cedar, Birch, Data and.
Simulation Commissioning, Validation, Data Quality A brain dump to prompt discussion Many points applicable to any of LHCb software but some simulation.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
1 Offline Week, October 28 th 2009 PWG3-Muon: Analysis Status From ESD to AOD:  inclusion of MC branch in the AOD  standard AOD creation for PDC09 files.
1. Last measurement of the distances between schools gave following results: G.Ferraris – A.Volta 1.41 km A.Volta – M.D’Azeglio 1.15 km G.Ferraris – M.D’Azeglio.
Pavel Nevski DDM Workshop BNL, September 27, 2006 JOB DEFINITION as a part of Production.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
Towards new Graphical User Interfaces for nTOF experiment Collaboration meeting, Bologna 28 th Nov 2013 Towards new Graphical User Interfaces for nTOF.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Giuseppe Ruggiero CERN Straw Chamber WG meeting 07/02/2011 Spectrometer Reconstruction: Pattern recognition and Efficiency 07/02/ G.Ruggiero - Spectrometer.
EEE telescope time resolution D. De Gruttola, M.P. Panetta, C. Cicalò.
EEE: PILOT RUN Status of CAGLIARI telescopes November 6, 2014 Corrado Cicalo, Stefano Boi, Luisella Stori, Giulia Murtas, Federico Cinus.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
Pattern recognition with the triplet method Fabrizio Cei INFN & University of Pisa MEG Meeting, Hakata October /10/20131 Fabrizio Cei.
Atmospheric Shower Studies from last data taking Conferenza Nazionale del Progetto EEE Extreme Energy Events La Scienza nelle Scuole Dicembre 2014.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 28/09/20151.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Here are a few photos of Version 3 of my solar tracker. At the moment it is only single axis but another axis can easily be added if need be. Operation.
Extreme Energy Events M. Abbrescia Extreme Energy Events Meetings  Our technical meeting in Grosseto postponed: Morning 15 April  same day.
Extreme Energy Events M. Abbrescia Extreme Energy Events Two contributions at recent conferences:  Paola La Rocca: “Operation and performance of the EEE.
Time-zero evaluation using TOF, T0 and vertex detectors
Preliminary search for long distance correlations in EEE
Update on the new analyzer and more
Extreme Energy Events collaboration
FROM UNIVERSE TO SCHOOLS, THE LONG WAY OF COSMIC RAYS.
Meeting at Erice Great success!
Outline Benchmarking in ATLAS Performance scaling
Plots for the performance paper
Analysis and paper on chamber and telescope performance
Plots for the performance paper
Update on coincidences
Talk general structure
Search for coincidences and study of cosmic rays spectrum
Status Report on LDC analysis and MultI-track events
Welcome back from holidays! …for a new year of exciting data taking
Analysis working groups
Studies of the Time over Threshold
Update on PolarquEEEst analysis
Update on POLA-01 measurements in Catania
Presentation transcript:

Coincidence group report Analysis meeting, 13/04/20151

Organization of the coincidence group List of people: 1.Edoardo Bossini 2.Corrado Cicalò 3.Daniele De Gruttola 4.Marco Garbini 5.Stefano Grazzi 6.Francesco Noferini 7.Laura Perasso 8.Federico Pilo Analysis meeting, 13/04/20152

People and telescopes BOLO-01 BOLO-03 BOLO-04 Marco, Francesco CAGL-01 CAGL-02 CAGL-03 Corrado CERN-01 CERN-02 (Daniele, Francesco, Laura) FRAS-02 FRAS-03 (we need to be in touch with Silvia and Fabrizio) LAQU-01 LAQU-02 Daniele SAVO-01 SAVO-02 SAVO-03 Laura, Stefano (Francesco) VIAR-01 VIAR-02 Federico, Edoardo Analysis meeting, 13/04/20153

Status of the code (Catania code) Current version (with some changes with respect the original code, see next slide) of the coincidence code avaliable here: Documentation on the code is available here (thanks to Paola e Franco): orrelations.zip Analysis meeting, 13/04/20154

Changes in the code Analysis meeting, 13/04/20155 Coincidence tree added Coincidence output file added A tree with quality parameters for each telescope was added year,month,day,run,timeduration,ratePe rRun,rateHitPerRun,fractionGoodTrack A tree with the overlap time information for the two telescope was added year,month,day,run,run2,timeduration

Telesecope infos and DB Some information we think are needed to trace the status of the telescope: Distances between the chambers Angle w.r.t. Magnetic North (EST at 90 degrees) GPS coordinates (altitude) Material budget over the telescope Height of the bottom chamber from the ground Are we interested to have such information in a common place (DB?)? Analysis meeting, 13/04/20156

«good run» definition for coincidence studies Stability of the fraction of tracks with  2 < 10 Number of event per run >10000 Run rate within 20% of the telescope average rate (when conditions are fixed: voltage, number of active strips, …) This is a preliminary definition which is under investigation. Analysis meeting, 13/04/20157

Some quality checks available in the new version of the code Analysis meeting, 13/04/20158 (ratePerRun – rateHitPerRun - 2)/(ratePerRun - 2) GPS events 3 strips missing 2 strips missing 1 strip missing

Common strategy to measure several quantities (under discussion) Effective time in data acquisition (needed to extract the rate) Efficiency measurement Acceptance computation Analysis meeting, 13/04/20159

Request to the analysis group MC is needed to compute acceptance and expected rates  waiting for Fabrizio’s talk Telescope info in the DB? Special request: is it possible to have the GPS information visible in the first page of the DAQ software (currently is in the 3 rd tab). This may help to check that GPS is really in the DAQ chain. Analysis meeting, 13/04/201510

backup Analysis meeting, 13/04/201511

List of telescopes for coincidences with Run-1 (pilot run) data TelescopeRunsDaysCoincidencesDistance (m) Rate CERN-01-CERN-02Run BOLO-01-BOLO-04Run LAQU-01-LAQU-02Run CAGL-01-CAGL-02Pilot, Run FRAS-02-FRAS-03Run ± ±2 TORI-03-TORI-04Run-16.5n.a.1076n.a. SAVO-01-SAVO-02Pilot, Run VIAR-01-VIAR-02Run-116.2n.a.1344n.a. SAVO-01-SAVO-03Run-17.4n.a1467n.a. BOLO-01/04-BOLO-03Run-136n.a.1491n.a. SAVO-02-SAVO-03Run-17.8n.a.1711n.a. CAGL-01/02-CAGL-03Pilot, Run ± ±0.6 CATA-01-CATA-02Run-11n.a.3034n.a. Last update 8/04/2015 Analysis meeting, 13/04/201512

Triple coincidences Location3 distances (m)3 average rates (per s)Statistics (days) Bologna100,1500,150042,37,3610 Cagliari500,2400,240020,33,1455 Savona1200,1500,170041,49,287 Location Noise rate (|  t 12 |<1000 ns, |  t 13 |<10000 ns) (per day) Bologna0.2 Cagliari0.03 Savona0.2 Noise rate = rate_1 * (rate_2* 2E-6 s) * (rate_3*2E-5 s) * (86400 s/ 1 day) So far, for SAVO-03 I considered as «good runs» only the ones starting from 1° April 2015 (fix on the GPS). Previous runs should be checked. You can find all my coincidences’ trees on the analysis PCs at CNAF under: /home/noferini/codePaola/ Analysis meeting, 13/04/201513