Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
SYSTEM OF EVALUATION AND MANAGEMENT CONTROL RESULTS-BASED BUDGETING THE CHILEAN EXPERIENCE Heidi Berner H Head of Management Control Division Budget Office,
WMO Competency Standards: Development and Implementation Status
PROPOSED ROUGE RIVER WATERSHED ROUGE RIVER WATERSHED LOCAL MANAGEMENT ASSEMBLY LOCAL MANAGEMENT ASSEMBLY.
Recommendations for a Statewide Water Plan By: Ewan Hadgraft Alabama Rivers Alliance Birmingham-Southern College.
The judicial system in Albania The judicial power is exercised by the courts of first instance, the courts of appeal and the High Court. Courts may be.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Evaluating Potential Impacts of Climate Change on Surface Water Resource Availability of Upper Awash Sub-basin, Ethiopia rift valley basin. By Mekonnen.
Subwatershed Outlet (B1 project area) Hydrological Monitoring Institutional strengthening The newly established Tana Basin Organisation have been trained.
Enter System Name AdvancED TM External Review Exit Report Catalyst High School May 11,12,13, 2014.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Report on Internal Audit and Investigation activities
Second Sudan Consortium March 2007 Water Supply and Sanitation Service Delivery and Challenges in Southern Sudan Ministry of Cooperatives and Rural Development.
8. Sampling and National System for Regional Groundwater Monitoring Jiri Sima.
1 EEC Board Policy and Research Committee October 2, 2013 State Advisory Council (SAC) Sustainability for Early Childhood Systems Building.
PERFORMANCE AUDIT REPORT ON MANAGEMENT OF PRIMARY HEALTH CARE (A CASE STUDY ON HEALTH CENTERS) 8/16/20151 Dr. Anna Nswilla CDHSMoHSW.
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia Hydrological.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Pact Cambodia I Yi Soktha Presented by Sophal, October 30, 2010 Day2: Session 3 The Management of the National Program for Sub-National.
ADB Grant 0133-CAM: Public Financial Management in Rural Development Ministries (Component 1) Analysing Budgets March ,
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia 7 th April 2009.
REPUBLIC OF ZAMBIA CENTRAL STATISTICAL OFFICE AGRICULTURE AND ENVIRONMENT N DIVISION Report on the Environment statistics The case of Zambia 7 – 11 March.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Hydrological Monitoring Microwatershed Monitoring Subwatershed Monitoring as part of overall hydrological network Lower Gumara Fogeda River Enkulal Outlet.
AdvancED TM External Review Exit Report Polk Pre-Collegiate Academy April 16– 17, 2014.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Hallgrímur Snorrason Management seminar on global assessment Session 8: Planning, programming and priority setting under budgetary restraints; human resource.
Wildlife Program Amendments CBFWA Members Meeting – Sept
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
1 Status of PSC recommendations (January December 2007) Portfolio Committee on Public Service and Administration 14 March 2008.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
1 Preparation of Six-Year ED Sector Programme Cycle and its 1st biennium Advantages -Real alignment of biennial C/5 (within 6-year ED Programme Cycle)
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Post RBD Projects 2009 What happens ? Post RBD Projects 2009 What happens ? RBD Handover Issues Seminar: Newpark Hotel Wednesday 28 th March Brendan O’Brien.
Presentation to the Portfolio Committee on the Social Security Agency February 2005.
African Centre for Statistics United Nations Economic Commission for Africa Proposed Framework for Monitoring, Evaluation and Reporting Negussie Gorfe.
ROMANIA MINISTRY OF EDUCATION, RESEARCH AND INNOVATION National Centre for Development of Vocational Education and Training Implementation Unit of Phare.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Hydrological Monitoring of TBIWRDP programme watersheds Anteneh Kibret, TBIWRDP, BoWRD.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Material produced under Phare 2006 financial support Phare TVET RO 2006/ Project financed under Phare EUROPEAN UNION MERI/ NCDTVET-PIU.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
 Cooperation and information exchange amongst financial supervisors and regulators are essential for effective oversight in an integrated financial system.
National Hydrology Project Framework for Monitoring and Evaluation (M&E)
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
Public Hearing on Conditional Grants and Capital Expenduture 2005/06 Free State Department of Agriculture Presented by Mr. MC Mokitlane.
BLOCK Health Funding Arrangement Presented by __________________ FNIHB-AB June 15, 2016.
EFFECTIVE & SUSTAINABLE PROCUREMENT SYSTEM IN LAGOS STATE Partnering for Development Onafowote, Fatai Idowu Acting General Manager (PPA) Presentation made.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
1 Establishing a New Gallaudet Program Review Process Pat Hulsebosch Office of Academic Quality CUE – 9/3/08: CGE – 9/16/08.
EDM Strategy for Working with Countries: the Uganda Example
Monitoring Visit to NatRisk Project
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
Ministry of Water Resources, River Development and Ganga Rejuvenation
Objectives of the Training
TechStambha PMP Certification Training
BY : Eunious Kapito Data Processing Officer
Presentation to the Portfolio Committee on the Social Security Agency
Human resource and Work flow of the Research Office, RUPP
Presentation transcript:

Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD

Agreement of institutional ”home” (WB Finland mission 2009) MMP  BoWRD Counterparts assigned 2009 Counterparts trained 2010 Budget allocated 2011 and idenpendently operational Operative to some extent – but not providing timely data Subwatershed Monitoring Programme  MoWE Hydrology department Capacity weak, little staff Subwatersheds identified, measured, design and procurement plan drawn up Routing for access roads made and design study ongoing

Access Road progress Design consultants contracted 4th April – 4th October 2012 (Saba Engineering, Addis Abeba) Tendering for construction: 2-3 months? Start of construction: Dec 2012 – Jan 2013 Construction to be done in priority order: 1) Baskura, 2) Enkulal, 3) Zefie 4) Kentay, 5) Jema, with option to only construct two- three roads.

Assumptions TsBO to prepare for installation of hydrological stations starting from March 2013, operative for end of dry season. Procurement of hydrological equipment through A1 component will proceed (international tendering – possibility to do at Regional level?) Compromise on number and localities: Baskura and Enkulal will serve both B1 and A1, while proposal is to move Zefie road to station proposed by A1 (not useful for B1).

Microwatershed Based Monitoring Programme – Status in June 2012 Data collection on the central parameters since August stations established at the outlets of 15 microwaterhseds 10 stations within the TBIWRDP area, while 5 stations are in ”control” waterhseds (no project activities taking place) ~ 8000 samples collected August 2009 – June 2012

Number of observations and samples in MMP

Institutionalisation MMP – exit plan 2010 MMP scale within BoWRD - two counterparts on part-time Operational budgets prepared for MMP level O&M Woreda Water Offices trained in equipments and sampling Inclusion of Woreda level in MMP assessed

Status assessment 2012 Backlog of sediment samples in the Enterprise (out of 3500 samples delivered, 1000 not entered, 2500 not analysed) Results from lab not received at BoWRD in May 2012 The procurement for office equipment, field equipment and maintenance equipment is not done QA of entered data is not done (no supervision since TBIWRDP supervisor left) No further analyses have been done to render the data useful for users. No data analyses relating to flow carried out, no systematic storage and updating of data. Weak capacity for supervision and data analyses.

INDICATORSTATUS MARCH 2012 Hydrological monitoring programme functional, providing timely and accurate data MMP functional, but data provision not timely. Establishment in process for subwatershed level Hydrological monitoring program institutionalized and operated by a competent local institution with adequate financial resources BoWRD operating the ”bare minimum”, but with much backlog and delays. Woreda WOs trained but not yet involved in routine work. New exit plan to be prepared. Outcome: An increase in dry season baseflow or its duration Baseline data available for 15 stations in dry season Flow measurements done in dry season 2011 Outcome: A 10% reduction in suspended sediment load measured over the project life. Baseline data available since August 2009, currently as ”sediment concentration” (g/ l) Equipment provided by WME to measure discharge, enabling concentration to be converted to sediment load at a later stage

Action Plan 2012 Consider and discuss the institutionalisation plan among stakeholders – assign new staff in TsBO to be trained (Brilew – now acting Head) Maintenance and improvement of MMP stations (not achieved dry season 2012 due to procurement problems) Proceed with subwatershed outlet stations (2 stations with staff gauges) QA and analyses of 2011 (and 2012) data Analyses of crest stage, flow, dipper and sediment load data (linking with A1 and universities, use of data for modelling)

Action Plan 2012 Training of old and new staff members in procedures, update manual Collection of flow and integrated sediment measurements throughout rainy season Analyses of baseline data – comparisons between land use, erosion control measures and sediment and baseflow data Data for water balance assessments partly available – combine effort with BDU (piezometer studies in MMP watersheds, modelling, water balance, flows etc) Continue interaction with BDU students (2 in 2010), and other projects currently underway in the Tana subbasin (TsBO, A1, BDU and Ghent Tana Basin water balance, other students (HY, Stockholm etc).

Institutionalisation – exit plan 2012 Proclamation of River Basin Councils and Authorities places mandate of developing a basin information system, which should include, amongst others, quality and quantity of water resources, with the Basin Authorities TsBO and ABA have become operational in 2011 Both MMP and subwatershed level monitoring will, finally, be moved to ABA (from BoWRD and hydrological department) Preliminary discussions held of gradually shifting MMP to TsBO January 2012 WB mission recommends closer linkage with A1 TsBO and ABA to take lead in subwatershed outlet establishment and operations – as part of A1 hydrological network – coordinate with B1 Access Road construction Link to TBWME M&E system must be ensured

Thank You!