NICU CLABSI Affinity Group Meeting May 9, 2012

Slides:



Advertisements
Similar presentations
Aim: Advance the adoption of proven strategies to improve the reliability, safety and quality of care received by patients in Tennessee hospitals.
Advertisements

The Team Check-up Tool. Slide 2 Learning Objectives To understand the tool we use to: – Describe the anticipated activities of your ICU quality improvement.
© 2009 On the CUSP: STOP BSI Physician Engagement.
Continuous Improvement in the Classroom -Professional Learning Communities.
March 14, 2012 Lynne Hall.  Best Practice Committee looks at all Core Measure Data ◦ HF-1 Discharge Instructions is one of the lowest measure in Georgia.
Healthcare Safety: How will your next patient be injured?
Sean Berenholtz, MD MHS FCCM September 20, 2011 at 2ET/1 CT/12 MT/11 PT Ventilator Associated Pneumonia Prevention CLABSI Supplemental Call Series.
TRANSFORMING HEALTH CARE THROUGH RESEARCH AND EDUCATION 2012 Illinois Performance Excellence Bronze Award Leading Improvement Across the Continuum: Skills,
Learning Objectives Define roles and responsibilities of team members
On the CUSP: STOP BSI Physician Engagement. Immersion Call Overview 1.Project overview 2.Science of Improving Patient Safety 3.Eliminating CLABSI 4.The.
Creating a service Idea. Creating a service Networking / consultation Identify the need Find funding Create a project plan Business Plan.
NICU CLABSI Affinity Group Meeting September 12, 2012 Denise Flook, RN, MPH, CIC HAI Collaborative Lead Vice President, Infection Prevention/Staff Engagement.
SUSP: Improving Surgical Care through TRIP and CUSP
THIS PRESENTATION/PUBLICATION/ OR OTHER PRODUCT IS DERIVED FROM WORK SUPPORTED UNDER A CONTRACT WITH THE AGENCY FOR HEALTHCARE RESEARCH AND QUALITY (AHRQ)
On the CUSP: Stop BSI National Content Call Chris George, RN MS Director, National Projects MHA Keystone Center for Patient Safety & Quality Monthly Team.
Building Your CUSP Team Part I Michael Rosen, PhD August 28, 2012 Armstrong Institute for Patient Safety and Quality Conference Number(s):
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Sustaining and Spreading surgical safety improvements with SUSP Mike.
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
LEARN FROM A DEFECT Emily Pasola RN, MSN, CNL Clinical Nurse Leader Surgical Intensive Care Unit Saint Joseph Mercy Hospital Ann Arbor, Michigan.
Georgia Hospital Engagement Network HAI Affinity Group July 9 TH, :00 – 11:30 AM.
Everyone Has A Role and Responsibility
Hawaii Surgical Unit Safety Program: The Journey Begins with the Comprehensive Unit-Based Safety Program May 21, 2013 Della M. Lin, M.D.
Welcome to the GHA Infection Prevention Power Hour January 17, 2013 Denise M. Flook, RN, MPH, CIC Georgia Hospital Association
© 2009 On the CUSP: STOP BSI Overview of STOP-BSI Program.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 CUSP for VAP Adaptive CUSP Sustainability Sustainment and Spread David.
© 2009 On the CUSP: STOP BSI Building a Team. © 2009 Learning Objectives To understand the central importance of your ICU quality improvement team To.
Toward Eliminating Central Line Associated Blood Stream Infections.
Comprehensive Unit Based Safety Program    A webinar series for QI Managers, Nurse Leaders and others supporting healthcare improvement in Wisconsin’s.
Improving ICU Care Through Teamwork
Learning Objectives 2 2 Explain the role of the senior executive in addressing technical and adaptive work Identify characteristics to search for when.
Physician Engagement. Learning Objectives To relate what is meant by physician engagement To discuss strategies at management and staff levels to enhance.
CUSP 4 MVP – VAP Improving Care for Mechanically Ventilated Patients Content 1: Science of Safety & Identifying Defects ARMSTRONG INSTITUTE FOR PATIENT.
© 2009 On the CUSP: STOP BSI Nurse Empowerment.
Building a Team. Slide 2 Immersion Call Overview Week 1: Project overview Week 2: Science of Improving Patient Safety Week 3: Eliminating CLABSI Week.
Patient/Family Centered Safe Care: Putting Patients First Quality Improvement and Patient Safety Your Role in Patient/Family Centered Safe Care.
Who We Are ~Where We are Going. Slide 2 Workshop Objectives Describe the purpose and vision of the ICU Safe Care Initiative/Comprehensive Unit-Based Safety.
CSTS Staff Empowerment Christine A. Goeschel ScD MPA MPS RN.
The Comprehensive Unit-based Safety Program (CUSP)
HAI Collaborative Meeting September 12, 2012 Denise Flook, RN, MPH, CIC HAI Collaborative Lead Vice President, Infection Prevention/Staff Engagement.
Improving Care Through Technical & Adaptive Work Chris Goeschel RN MPA Director, Patient Safety &Quality Initiatives JHU Quality & Safety Research Group.
NEXT STEPS Armstrong Institute for Patient Safety and Quality 1.
HAI Collaborative Meeting August 8, 2012 Denise Flook, RN, MPH, CIC HAI Collaborative Lead Vice President, Infection Prevention/Staff Engagement.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2012 Optional SUSP Tools: Briefing Audits, Morning Huddle, and Shadowing.
Disclosures  Nothing to disclose  No discussion of “off-label” use of medications.
GHA Hospital Engagement Network HAC Learning Collaborative Webinar ~ May 16, 2012 Kathy McGowan, GHA Kelley Dotson, GHA Anne Hernandez, A LLIANT | GMCF.
Small and Rural Critical Access Hospitals July 19, 2011.
A Team Members Guide to a Culture of Safety
Small Rural/CAH Learning Community Meeting May 23, 2012 Denise Flook, RN, MPH, CIC HAI Collaborative Lead Vice President, Infection Prevention/Staff Engagement.
Standard 10: Preventing Falls and Harm from Falls Accrediting Agencies Surveyor Workshop, 13 August 2012.
© 2009 On the CUSP: STOP BSI Nurse Empowerment Christine A. Goeschel RN MPA MPS ScD (candidate) Tennessee Center for Patient Safety December 2, 2009.
Nurse Empowerment On the CUSP: Stop BSI
HAI Affinity Group CAUTI Prevention: The Nurse Driven Protocol for Catheter Removal April 10, 2013 Denise Flook, RN, MPH, CIC HAI Collaborative Lead Vice.
Staff Safety Assessment 1. Learning Objectives To understand Step 2 of CUSP:Identify Defects To understand how to Implement the Staff Safety Assessment.
AHRQ Safety Program for Long-Term Care: HAIs/CAUTI Long-Term Care Safety Toolkit: Building a Culture of Safety National Content Webinar April 16, 2015.
Cohort 2 Coaching Meeting March 13, 2013 Denise Flook, RN, MPH, CIC Cohort 2 and HAI Affinity Group Lead Vice President, Infection Prevention/Staff Engagement.
Identifying Defects Chris Goeschel June Identifying Defects What DO you know? What SHOULD you know?
Sustaining and Spreading Surgical Safety Improvements with SUSP Mike Rosen, PhD Elizabeth Wick, MD ARMSTRONG INSTITUTE FOR PATIENT SAFETY AND QUALITY.
PRACTICE TRANSFORMATION NETWORK 2/24/ Transforming Clinical Practice Initiative (TCPI) Practice Transformation Network (PTN)  $18.6 million –
The Comprehensive Unit-Based Safety Program: How Will This Work?
An Intervention to Learn from Mistakes and Improve Safety Culture
Staff Safety Assessment
Staff Safety Assessment
Meeting Objectives Build skills among care team members that will improve teamwork, communication, and create a patient safety culture in your unit Hear.
ICU Safe Care Initiative/CUSP November 16, :30 am – 3:30 pm
Meeting Objectives Build skills among care team members that will improve teamwork, communication, and create a patient safety culture in your unit Hear.
MA ICU Safe Care Initiative: Comprehensive Unit Based Safety Program (CUSP) 2010.
AFIX Standards: a new programmatic tool
Staff Identify Defects
MA ICU Safe Care Initiative: Comprehensive Unit Based Safety Program (CUSP) October 25, 2010.
Unit-Based Safety Program (CUSP)
Presentation transcript:

NICU CLABSI Affinity Group Meeting May 9, 2012 Denise Flook, RN, MPH, CIC HAI Collaborative Lead Vice President, Infection Prevention/Staff Engagement

Learning Objectives Discuss successful strategies being used by the NCABSI collaborative to reduce CLABSI in NICU. Describe how you can join the Community of Practice for the collaborative. Outline the first steps that you will take to begin to reduce CLABSI in your NICU. Identify the action steps your team should complete before the June meeting.

Goals Achievement of HAI goals: Reducing health care acquired infections by 40% CLABSI: <1/1000 central line days

Learning Network Expectations and Responsibilities Responsibilities of Participating Teams Pre-work activities Attend Learning Sessions Complete action items Communicate regularly with team Participate on conference calls Track and report on data measures Initiate, maintain and evaluate the change processes Share successes Steal shamelessly and share relentlessly!

How Will This Collaborative Work? Meeting format What needs do you have? How would you like to move forward – separate or parallel HAI collaborative?

Improvement Model – Rapid Cycle What are we trying to accomplish? How will we know that a change is an improvement? What changes can we make that will result in improvement? AIM MEASURES CHANGES

CUSP Model On The CUSP Adaptive (CUSP) Assemble a CUSP team, Technical – Practices to Prevent Harm Evidence Based Practice 1. Evaluation 2. Systems Analysis 3. Process Development Education on the Evidence 1. Presentation of evidence 2. Fact Sheet 3. Cost Estimator 4. Summary of Professional Organization Recommendations 5. Annotated bibliography Implementation/ Sustaining 1.Checklist 2.Policy / Procedures 3. Protocol s 4. Monitoring 6. Feedback Adaptive (CUSP) Science of Safety 1. Science of Safety presentation 2. Attendance sheet Staff Identify Defects 1.Staff Safety Assessment form 2.Identifying Hazards presentation Senior Executive Partnership 1. Education 2. Briefings Learning from Defects 1. LFD toolkit 2.RCA of each incidence Implement Tools for Teamwork and Communication 1. Daily Goals 2. Shadowing 3. AM Briefing 4. Call List 5. Team Check Up tool 6. TeamSTEPPS Tools Assemble a CUSP team, Partner with a Senior Executive; Baseline Data Quality Improvement Tools 1. PDCA 2. Lean/Six Sigma 3. Reliable System Process 4. TCAB 5. Other CUSP Model

Five Phases of Improvement Project Identification Diagnostic Interventions Impact & Implementation Sustaining

Phase One – Project Identification Decide on the process that needs improving Form a team Write an aim Select methodology scientific approach Determine measures

Phase Two - Diagnostic How? See it! Feel it! Organize it! Do it! Voice of the Patient / Individual Process Flow Root Cause Analysis Brainstorm Organize it! Cause & Effect diagram Pareto Charts Run Charts What works for your organization? See it! Feel it! Do it!

Team Development Stage 1 of initial team development is to gain acceptance and to build trust Stage 2 is to function effectively Stage 3 is to improve function and work in concert Stage 4 is to sustain the gain and to spread the improvement

Choosing Your Team Is Key First – Engage a Senior Leader who will help champion and support team Must have all who are involved in the process present Unit based teams which include staff level leaders are most effective Unit opinion leaders should be on the team Diverse opinions enriches team Physician champion

Teamwork Form your team with an appreciation of the importance of WHO is on the team Carefully plan HOW you will act as a unified group Do a “pre-mortem” assessment—if this project were to fail, why would it? What could the QI team have done to prevent failure?

Conduct Productive Meetings Teams should meet regularly to maintain momentum and complete objectives Periodically evaluate team meetings to improve effectiveness Keep minutes of team meetings Spread the improvement

Process and Outcome Measures Process Measures Will use current sources and submitted data Adherence to Bundles, Checklist, Utilization Criteria Will be submitted via electronic survey Numerator and denominator data Device Utilization Ratios NHSN

Outcome Measures Infection Rates GHA Group in NHSN Confer rights to so GHAREF can download data Peer protection No patient identified data will be used or accessed If not using NHSN need to begin to use Will use baseline data from 2011 or most current when rights conferred Will also look at state SIR data

Next Steps: To be completed by June 13 Meeting Assess your internal baseline data Prioritize improvement Define goal/aim for reduction Meet with your Senior Executive champion Develop your team Conduct first team meeting Use the Pre-Implementation Checklist to assist you in beginning your work Complete the webinar evaluation by May 15

Denise Flook dflook@gha.org. 770-249-4518 Contact Information Denise Flook dflook@gha.org. 770-249-4518