Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Introduction to Management Science
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Chapter 9 Project Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Operations and Supply Chain Management, 8th Edition
BA 333 Operations Management
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
What is Project Management?
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Project Scheduling: PERT/CPM
Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling Work I love deadlines. I love the sound they make as they fly by. -- Douglas Adams.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
BUAD306 Chapter 17 – Project Management. Life is a Project You are already a project manager! Fraternity/sorority projects Sport-related activities Family.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
Beni Asllani University of Tennessee at Chattanooga
PERT CPM assumes duration of activity is known with certainty.
Project Management Chapter 8.
PROJECT MANAGEMENT.
Project Management Chapter Topics
Copyright©2012 Miles M. Hamby
Project Management: PERT/CPM
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Project Planning and Scheduling
Project Planning and Budgeting
Probabilistic Time Estimates
Stevenson 17 Project Management.
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

Principle, Ariel Training Consultants Project Management by Miles M. Hamby, PhD Principle, Ariel Training Consultants drhamby@cox.net

Topics The Elements of Project Management Elements of a Project Proposal Document SOW, OBS, RAM, CPM/PERT Networks Probabilistic Activity Times Using Excel to create Gantt charts Cost-Benefit and Earned Value Analysis

Unique (one-time effort) Fixed duration Specific goal Nature of a Project Unique (one-time effort) Fixed duration Specific goal

The Project Team Includes engineers, line workers, HR personnel, budget experts, technical experts, outside consultants Headed by the Project Manager Must coordinate various skills of team members into single, focused effort Great pressure due to uncertainty inherent in project schedule, budget, and quality.

If anything can go wrong – it will! Nature of Project Management Why manage a project? Murphy’s Law If anything can go wrong – it will! Complete on-time In budget Meet expectations (quality)

Nature of Project Management Controlling an activity for a relatively short period of time until project is completed, then operations begin. Project manager not involved in operations. 3 components of PM: Planning Scheduling Controlling individual activities.

The Project Management Process PLANNING SCHEDULING CONTROLLING GANTT ON TIME SOW Scope OBS IN BUDGET asdf 1 3 2 5 4 6 START FINISH PERT/CPM CREDIT DEBIT $24,200 $21,300 $34,000 $33,450 asdf asdf asdf MEETS EXPECTATIONS RAM ACT DESIGN RESOUC CPMSTR QA 1 O.P S 2 P O 3 RESOURCES $

Elements of Project Management Project Control Process of ensuring progress toward successful completion ~ on time, in budget, meet expectations. Monitoring project to minimize deviations from project plan and schedule. Corrective actions necessary if deviations occur. Key elements of project control Time management Cost management Performance management Earned value analysis.

Project Planning Document - a document for the customer, individuals, team members, groups, departments, subcontractors and suppliers, describing what is required for successful completion - on time, in budget, meet expectations.

The Project Planning Document Cover page TOC SOW and Scope OBS RAM Activity Schedule PERT/CPM – AON diagram & Gantt Chart Budgeting Resources (Human and Materials) Technology Cost-Benefit and Earned Value Analysis (EVA) Execution and Control Plan (Quality Assurance) Protection of the Environment Risk Assessment and Management

SOW and Scope Statement of Work (SOW) – statement of work to be performed, justification describing the factors giving rise to need for project, expected duration (on time), total cost (budget), and performance standards (meeting expectations). Scope – identification of boundaries and limitations on specific aspects of the project, including size, resources, work to be performed and performance standards

Organizational Breakdown Structure (OBS) Wilson Bridge Renovation Project Acme Construction Company Organization Breakdown Structure (OBS) Project Manager Bob Smith Design Manager Jane Doe Construction Mgr Bill Jones Electrical Mgr Rene Flemming Resources Mgr John Henry (Tasking) (Tasking) (Tasking) (Tasking)

Responsibility Assignment Matrix OBS leads to the responsibility assignment matrix (RAM) RAM is a table or a chart showing which organizational units are responsible for work items. Project Manager assigns work elements to organizational units, departments, groups, individuals or subcontractors. RAM shows who is responsible for oversight (O), performance (P), and support (S) of each task

Responsibility Assignment Matrix (RAM) ACME Construction Company Wilson Bridge Renovation Responsibility Assignment Matrix (RAM) Key: O = Oversight, P = Performance, S = Support Activity OBS Unit Design Construction Electrical Resources 1 – Design O, P S 2 - Acquire materials 3 - Prepare foundation 4 - Set piles 5 - Construct piers P 6 - Construct roadway

Project Scheduling Project Schedule evolves from planning documents, with focus on timely completion. Scheduling is the source of most conflicts and problems. Schedule development steps: 1. Define activities 2. Sequence activities, 3. Estimate activity times 4. Construct schedule. Gantt chart and CPM/PERT techniques used. Computer software packages available, e.g. Microsoft Project.

Work Breakdown Structure (WBS) Basis for project development, management , schedule, resources and modifications. WBS breaks down project into major modules. Modules are further broken down into activities and, finally, into individual tasks. Identifies activities, tasks, resource requirements and relationships between modules and activities.

Activity Schedule ACME Construction Company Wilson Bridge Renovation ACTVITY PREDESSOR DURATION (months) 1 – Design -- 14 2 - Acquire materials 1 3 - Prepare foundation 4 - Set piles 3 5 - Construct piers 4 8 6 - Construct roadway 5

CPM – Critical Path Method CPM/PERT CPM – Critical Path Method PERT – Project Evaluation and Review Technique AON – Activity on Node

CPM/PERT Activity-on-Node (AON) Network A branch reflects an activity of a project. A node represents the beginning and end of activities, referred to as events. Branches in the network indicate precedence relationships. When an activity is completed at a node, it has been realized. 1 14 2 3 4 5 8 6 START FINISH

AON Concurrent Activities Network aids in planning and scheduling. Time duration of activities shown on branches. Activities can occur at the same time (concurrently). A dummy activity shows a precedence relationship but reflects no passage of time. Two or more activities cannot share the same start and end nodes. 1 12 2 3 4 5 8 6 START FINISH

The Critical Path (CPM) The critical path is the longest path through the network; the minimum time the network can be completed Path A: 1  2  4  5  6 14 + 2 + 4 + 8 + 2 = 28 month Path B: 1  3  4  5  6 14 + 3 + 4 + 8 + 2 = 29 months  Critical Path

Gantt Chart Bar chart developed by Henry Gantt (1914). A visual display of project schedule showing activity start and finish times and where extra time is available. Based on Activity Schedule – order, duration, predecessors Drawback: precedence relationships are not always discernible.

Activity Early Start Schedule (for Gantt Chart) ACME Construction Company Wilson Bridge Renovation Activity Schedule ACTVITY EARLY START DURATION (months) 1 – Design 6 2 - Acquire materials 7 3 - Prepare foundation 12 1 4 - Set piles 13 5 - Construct piers 19 8 6 - Construct roadway 27

Gantt Chart

House Building Project Example No. Activity Predecessor Duration (Months) Design house and - 3 obtain financing 2. Lay foundation 1 2 3. Order Materials 1 1 4. Build house 2, 3 3 5. Select paint 2, 3 1 6. Select carpet 5 1 7. Finish work 4, 6 1

The Critical Path (CPM) The critical path is the longest path through the network; the minimum time the network can be completed. Path A: 1  2  4  7, 3 + 2 + 3 + 1 = 9 month CPM Path B: 1  2  5  6  7, 3 + 2 + 1 + 1 + 1 = 8 months Path C: 1  3  4  7, 3 + 1 + 3 + 1 = 8 months Path D: 1  3  5  6  7, 3 + 1 + 1 + 1 + 1 = 7 months

Activity Early Start Times

AON Earliest/Latest Times Configuration Earliest Start Earliest Finish Activity 1 3 12 Duration Latest Start Latest Finish

Activity Scheduling: Earliest/Latest Times ES – Earliest Start time an activity can start: ES = Maximum (EF) EF - Earliest Finish, start time plus the activity time: EF = ES + t 1 12 3 1 12 3 1 12 3 1 12 3 1 12 3

Computer Network Example Computer Network Project Activity Optimistic (a) Most Probable (m) Pessimistic (b) Weighted Mean Time (t) Variance (v) 1 – Equipment Installation 6 8 10 2 – System Development 3 9 3 – Position Recruiting 1 5 4 – Equip testing & Mod 2 4 12 5 – Manual Testing 6 – Job Training 7 – Orientation 8 – System training 11 9 – System Testing 10 – Final Debugging 7 11 – System Changeover 13

AON Probabilistic Times Configuration 1 2, 3, 5 Activity Optimistic (a) Most likely (m) Pessimistic (b)

AON Probabilistic Times 10 1,4,7 8 3,7,11 4 2,4,12 6 3,4,5 7 2,2,2 3 1,3,5 1 6,8,10 9 2,4,6 11 1,10,13 5 2,3,4 2 3,6,9 FINISH START Computer Network Project

Probabilistic Activity Times Activity time estimates usually cannot be made with certainty. PERT used for probabilistic activity duration times. In PERT, three time estimates are used: most likely time (m), the optimistic time (a) , and the pessimistic time (b). These provide an estimate of the mean and variance of a beta distribution: Weighted Mean (expected time): Variance:

Computer Network Example Computer Network Project Activity Optimistic (a) Most Probable (m) Pessimistic (b) Weighted Mean Time (t) Variance (v) 1 – Equipment Installation 6 8 10 .44 (4/9) 2 – System Development 3 9 1 3 – Position Recruiting 5 4 – Equip testing & Mod 2 4 12 2.78 (25/9) 5 – Manual Testing .11 (1/9) 6 – Job Training 7 – Orientation 1.78 (0) 8 – System training 11 7 2.11 (16/9) 9 – System Testing 10 – Final Debugging 1 (9/9) 11 – System Changeover 13 4 (36/9) 34 34

Probabilistic Activity Times Critical Path Critical Path is the path with the longest mean time and is also the Expected Project Time (tp) Path Mean Times 1  4  10 8 + 5 + 4 = 17 weeks 2  5  8 6 + 3 + 7 = 16 weeks 2  5  9  11 6 + 3 + 4 + 9 = 22 weeks CPM 3  6  8 3 + 4 + 7 = 14 weeks 3  6  9  11 3 + 4 + 4 + 9 = 20 weeks 3  7  11 3 + 2 + 9 = 14 weeks

Expected Project Time and Variance The Project Variance (vp) is the sum of the variances of the critical path activities. Critical Path: 2  5  9  11 Project time: 6 + 3 + 4 + 9 = 22 weeks Variance: .44 + .11 + 2.11 + 4 = 7.22 weeks Standard Deviation: Sqrt of Variance = 2.69

Probability Analysis of a Project Network Expected project time (tp) is assumed to be normally distributed (based on central limit theorem). As such, the expected project time (tp) and variance (vp) are interpreted as the mean () and variance (2) of a normal distribution Project time: 6+3+4+9 = 22 weeks Variance: .44+.11+2.11+4 = 7.22 weeks Std Dev: Sqrt 7.22 = 2.69 -3 = 13.93 weeks Time (Duration) 3 = 30.07 weeks  = 22 weeks

Probability Analysis of a Project Network Example 1 From Computer Network example: Critical Path: 2  5  9  11 Project time: 6 + 3 + 4 + 9 = 22 weeks Variance: .44 + .11 + 2.11 + 4 = 7.22 weeks What is the probability that the new order processing system will be ready in 20 weeks? µ = 22 weeks 2 = 7.22, therefore,  = 2.69 weeks Z = (x-)/  = (20 - 22)/2.69 = -.74

Table of Areas (p-values) +/- Z 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 0.0000 0.0398 0.0793 0.1179 0.1554 0.1915 0.2257 0.2580 0.2881 0.3159 0.3413 0.3643 0.3849 0.4032 0.4192 0.4332 0.4452 0.4554 0.4641 0.4713 0.4772 0.4821 0.4861 0.4893 0.4918 0.4938 0.4953 0.4965 0.4974 0.4981 0.4987 0.0040 0.0438 0.0832 0.1217 0.1591 0.1950 0.2291 0.2611 0.2910 0.3186 0.3483 0.3665 0.3869 0.4049 0.4207 0.4345 0.4463 0.4564 0.4649 0.4719 0.4778 0.4826 0.4864 0.4896 0.4920 0.4940 0.4955 0.4966 0.4975 0.4982 0.0080 0.0478 0.0871 0.1255 0.1628 0.1985 0.2324 0.2642 0.2939 0.3212 0.3461 0.3686 0.3888 0.4066 0.4222 0.4357 0.4474 0.4573 0.4656 0.4726 0.4783 0.4830 0.4868 0.4898 0.4922 0.4941 0.4956 0.4967 0.4976 0.0120 0.0517 0.0910 0.1293 0.1664 0.2090 0.2357 0.2673 0.2967 0.3238 0.3485 0.3708 0.3907 0.4082 0.4236 0.4370 0.4484 0.4582 0.4664 0.4732 0.4788 0.4834 0.4871 0.4901 0.4925 0.4943 0.4957 0.4968 0.4977 0.4983 0.4988 0.0160 0.0557 0.0948 0.1331 0.1700 0.2054 0.2389 0.2704 0.2995 0.3264 0.3508 0.3729 0.3925 0.4099 0.4251 0.4382 0.4495 0.4591 0.4671 0.4738 0.4793 0.4838 0.4875 0.4904 0.4927 04945 0.4959 0.4969 0.4984 0.0199 0.0596 0.0987 0.1368 0.1736 0.2088 0.2422 0.2734 0.3023 0.3289 0.3531 0.3749 0.3944 0.4115 0.4265 0.4394 0.4505 0.4599 0.4678 0.4744 0.4798 0.4842 0.4878 0.4906 0.4929 0.4946 0.4960 0.4970 0.4978 0.4989 0.0239 0.0636 0.1026 0.1406 0.1772 0.2123 0.2454 0.2764 0.3051 0.3315 0.3554 0.3770 0.3962 0.4131 0.4279 0.4406 0.4515 0.4608 0.4686 0.4750 0.4803 0.4846 0.4881 0.4909 0.4931 0.4948 0.4961 0.4971 0.4979 0.4985 0.0279 0.0675 0.1064 0.1413 0.1808 0.2157 0.2486 0.2794 0.3078 0.3340 0.3577 0.3790 0.3980 0.4147 0.4292 0.4418 0.4525 0.4616 0.4693 0.4756 0.4808 0.4850 0.4884 0.4911 0.4932 0.4949 0.4962 0.4972 0.0319 0.0714 0.1103 0.1480 0.1844 0.2190 0.2517 0.2823 0.3106 0.3365 0.3599 0.3810 0.3997 0.4162 0.4306 0.4429 0.4535 0.4625 0.4699 0.4761 0.4812 0.4854 0.4887 0.4913 0.4934 0.4951 0.4963 0.4973 0.4980 0.4986 0.4990 0.0359 0.0753 0.1141 0.1517 0.1879 0.2224 0.2549 0.2850 0.3133 0.3389 0.3621 0.3830 0.4015 0.4177 0.4319 0.4441 0.4545 0.4633 0.4706 0.4767 0.4817 0.4857 0.4890 0.4916 0.4936 0.4952 0.4964

Probability Analysis of a Project Network Z value of -.74 corresponds to probability of .2704 (table of areas under the curve). Therefore, the probability of completing the project in 20 weeks is .5000 - .2704 = .2296. x - µ  Z = 20 - 22 2.69 = P = .2704 .5 - .2704 = .2296 Z= -.74 (20 weeks) Time (Duration)  = 22 weeks

Cost – Benefit Analysis Given an amount of capital to invest, what is the cost and what is the benefit? Project Owner’s perspective ~ is the project worth doing, or do we invest in something else, like another project or the market? Project Manager’s perspective ~ what do I do with money waiting to be spent on the project – keep it in the bank, or invest it?

Cost - Benefit Project – replace old computerized production control system for an auto assembly plant The project will cost $3M over 3 years and save $7M over 10 years However, if we invest $3M over ten years, we make $8M, but lose $5M in extra costs from the outdated system ITEM BENEFIT ($M) COST GAIN or (LOSS) (Benefit-Cost) New System 7 (in savings) 3 (install new system) 4 Old System 8 (from investment) 5 (using old system) 3

Earned Value Analysis (EVA) Measures progress of a project in terms of: Planned Value (PV) or Budgeted Cost Work Scheduled (BCWS) – what is supposed to be done Earned Value (EV) or Budgeted Cost, Work Performed (BCWP) – what has actually been done Actual Cost (AC) or Work Performed (ACWP) – actual labor and materials expended

Earned Value - Example Project: Build a deck PV: 40 labor-hours x $20/hr = $800 + $600 materials $1,400 PV (BCWS) Changes after work begun: Labor rate now $22/hr, materials price increase to $700, project only 95% completed after 40 hours EV: 95% completed x $1,400 = $1,330 EV(BCWP) AC: 40 hrs x $22/hr = $880 labor + 700 materials $1,580 AC (ACWP)

Should be proportionate to project time Earned Value Should be proportionate to project time Project Time Monitoring Schedule 1 week 1 month 6 months > 6 months Daily Twice weekly Weekly Monthly

End of Chapter