AIP-2 Kickoff Workshop Energy SBA Scenario Description Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff 25-26 September 2008.

Slides:



Advertisements
Similar presentations
Operational information FAO RFE for Sudan FAO & Sudan Meteorology Authority Mauro Evangelisti &Stefano Alessandrini (FAO Consultant)
Advertisements

AIP-2 Kickoff Workshop [Your Topic] Session Overview [Session co-lead names] GEOSS AIP-2 Kickoff September 2008.
Guidelines for Basic Geographic Data DA AIP Phase 2 Kickoff Workshop September 25-26, 2008 Boulder, Colorado, USA Yoshikazu FUKUSHIMA Secretariat.
AIP-2 Kickoff Workshop Energy SBA Session Report Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2.
GEOSS ADC Architecture Workshop Lionel Menard, Lucien Wald, Philippe Blanc Ecole des Mines de Paris
AIP-2 Kickoff Workshop Energy SBA Session Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff.
AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.
GEOSS ADC Architecture Workshop Lionel Menard, Lucien Wald, Philippe Blanc Ecole des Mines de Paris
Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,
Virtual Institute of Energy Meteorology Earth Observations and Energy Management Expert Meeting August 2006 M. Schroedter-Homscheidt German Aerospace.
Chuck Kutscher National Renewable Energy Laboratory Geothermal Power Potential Energy and Climate Mini-Workshop November 3, 2008.
ENERGY UNIT: CALCULATING AND METERING ENERGY. CALCULATING ENERGY USE APES VERSION.
Iven Mareels Dean Melbourne School of Engineering.
Groundwater Data on WaterConnect
Understanding & Meeting Needs of the Renewable Energy Industry Priorities, Expectations and Roles 2009 AMS Summer Community Meeting August 12, 2009 Norman,
CHIMERE air quality forecasts : results during Pays de la Loire summer 2004 experiment and end-user point of view ! Arnaud REBOURS - AIR PAYS DE LA LOIRE.
Solar Array & Maximum Power Point Tracker Group Senior Design Project 2003 Stephanie Chin Jeanell Gadson Katie Nordstrom Advisor: Karen Panetta.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Energy Session KO Summary Lionel Ménard - Session Lead - MINES ParisTech Kick-off Meeting May.
BASIC SOLAR CELL TESTING Basic Structure of a Solar Cell.
US Army Corps of Engineers BUILDING STRONG ® Great Lakes Flood Hazard Mapping Project - Data Development (Lake Michigan) Bruce Ebersole USACE Engineer.
Development of DRAIN-WARMF Model to Simulate Water Flow & Nitrogen Transport From an Agricultural Watershed: “ Subsurface Flow Component” Shadi Dayyani.
Water Resources Planning and Management Daene C. McKinney Optimization.
Cracow Grid Workshop November 5-6 Support System of Virtual Organization for Flood Forecasting L. Hluchy, J. Astalos, V.D. Tran, M. Dobrucky and G.T. Nguyen.
NASA Derived and Validated Climate Data For RETScreen Use: Description and Access Paul Stackhouse NASA Langley Research Center Charles Whitlock, Bill Chandler,
Hydrologic/Watershed Modeling Glenn Tootle, P.E. Department of Civil and Environmental Engineering University of Nevada, Las Vegas
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Wave Energy Resource Assessment and GIS Database for the U.S. Paul T. Jacobson.
Plant Utility System (TKK-2210)
ESTIMATING SOLAR PV POTENTIAL IN THE CLOUD JONATHAN COY GEOG 596A ADVISOR: JEFFREY BROWNSON.
INFSO-RI Enabling Grids for E-sciencE FloodGrid application Ladislav Hluchy, Viet D. Tran Institute of Informatics, SAS Slovakia.
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
FNR 402 – Forest Watershed Management
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Energy Scenario- Lionel Ménard MINES ParisTech Lucien WaldMINES ParisTech Supported by the FP7.
U.S. Department of the Interior U.S. Geological Survey Alabama Water Science Center StreamStats: By Kernell Ries and J.
Speaker Notes for employee discussions on how Canada Post is getting greener – August 2008 The Issues Canada Post needs to upgrade its current printer.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Profitability Analysis Our client is evaluating a number of scenarios How does our process compare with the others?
A NEW MARKET PLAYER: THE AGGREGATOR AND ITS INTERACTION WITH THE CONSUMER interaction Ramón Cerero, Iberdrola Distribución Paris, June 9th 2010 ADDRESS.
DRIAS Project: providing Regional Climate Informations over France Julien Lémond 1-4, Ph. Dandin 1, S. Planton 4, R. Vautard 3, C. Pagé 2, M. Déqué 4,
Digital Earth Communities GEOSS Interoperability for Weather Ocean and Water GEOSS Common Infrastructure Evolution Roberto Cossu ESA
Elsarnagawy, MASH 207, 312 Energy and Power 1. Elsarnagawy, MASH 207, 312 Objectives Define energy and power Calculate power in a circuit Properly select.
Caribbean Disaster Mitigation Project Caribbean Institute for Meteorology and Hydrology Storm Surge Atlases Presentation, description, data Horace H. P.
El Gallo Hydroelectricity Project PDD Analysis
INTRO TO SPATIAL DATA ANALYSIS JOU-1526 Computer Assisted Reporting.
Building an OpenNSPECT Database for Your Watershed Shan Burkhalter and Dave Eslinger National Oceanic and Atmospheric Administration (NOAA) Office for.
CIAT ACCESSIBILITY AML TOOL TUTORIAL Leonardo Sotomayor September, 2007.
Modeling Stream Flow of Clear Creek Watershed-Emory River Basin Modeling Stream Flow of Clear Creek Watershed-Emory River Basin Presented by Divya Sharon.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Task B7. Monitoring and Forecasting for Water Management and Drought/Flood Hazards Goals National scale characterization of snow water resources (Afghanistan’s.
ITree-Hydro (Beta Version) Hydro is a stand alone application designed to simulate the effects of changes in tree and impervious cover characteristics.
Demand Response Analysis and Control System (DRACS)
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
Ali Saffar Shamshirgar
SnowSTAR 2002 Transect Reconstruction Using SNTHERM Model July 19, 2006 Xiaogang Shi and Dennis P. Lettenmaier.
16-1 PC-HYSPLIT WORKSHOP Workshop Agenda Introduction to HYSPLIT Introduction.ppt Model Overview Model_Overview.ppt Meteorological Data Meteorological_Data.ppt.
Tayba Buddha Tamang Meteorology/Hydromet Services Division Department of Energy Ministry of Economic Affairs South Asian Climate Outlook Forum (SASCOF-1)‏
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
GEOSS Architecture Implementation Pilot, Phase 3 - Energy Scenario-
Energy and Water Climate change impact assessment on hydro-electric project using multi-model climate ensemble Vinod Chilkoti, PhD Candidate Tirupati.
Jay Pearlman, IEEE Ivan Petitieville Report to ADC February 2008
NRAO VLA Archive Survey
Map-Based Flood Hydrology and Hydraulics
Energy Consumption: CO$T.
KLAUS KDA4 – Solar Irradiance Monitoring Application
Change in Flood Risk across Canada under Changing Climate
Economic Operation of Power Systems
Date of download: 11/9/2017 Copyright © ASME. All rights reserved.
DA Task Report Data Integration and Analysis System
Determining the optimal placements of renewable power generation systems using regional geographic information system Prof. Tyagunov M. G. , PhD Zay Yar.
Intermountain West Data Warehouse
Energy Consumption: CO$T.
Presentation transcript:

AIP-2 Kickoff Workshop Energy SBA Scenario Description Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff September 2008

Scenario objectives Support the SBA Energy by developing services providing irradiance data among other parameters Simulating the case of the sitting of a solar power plant.

?

From the users point of view StepDescription Step 0The investor asks a consulting company for a study for a given geographical area Step 1The consulting company wants to obtain the necessary information and puts requests to the GEOSS portal Step 2The specific application is invoked Step 3The specific application invokes various web services and resources to retrieve needed information. It then invokes the specific processing web services. Step 4The specific application packs the layers as an archive file and deliver it to the consulting company Step 5The consulting company retrieves the archive, performs the study by exploiting the retrieved information and its own models and reports to the investor Step 6The investor takes a decision Request Answer Process

2. Meteorological, geographic and environmental data layers needed

Meteorological data Map of annual irradiation on a plane always facing the sun (kWh/m²) –Source from SoDa service 5km resolution –Results from specific processing (computing time from few minutes to few hours) DNI (Direct Normal Irradiance) DNI + shaded DEM

Geographical data Source from SRTM DEM, results from specific processing. 100 meters resolution Ratio between actual daylength with shadows and astronomical daylength (%) Altitude in meters Local maximum slope in degree

Geographical data: Hydrology and usage Security cooling device for Solar Plants –Need an important flow of cooling water (typically 2 m 3 /s for a 12 MW Solar Plants) –Estimated cost for the linking to the Hydraulic Network Maps depends on the linking length (typically 300 k/km) –Need Hydraulic Network Maps (Map scale better than 1/ ) Hydraulic network. Scale 1/ Sample of estimated cost of hydro network linking in Keuros

Geographical data: Electricity network and usage Linking to High Voltage Electric Network –Estimated cost for the linking to the HV Electric Network Maps depends on the linking length (typically 200 k/km) –Need High Voltage Electric Network Maps (Map scale better than 1/ ) Estimated cost of electric network linking KeurosElectric network. Scale 1/

Environmental data Protected area & risk and hazard –Cope with regulation –Adequacy between the solar plant lifecycle and ROI Protected area. Scale 1/ Risk and Hazard. Scale 1/

Input parameters & output result Inputs: –bounding box (lat., lon.), dates, scale, optional layers, valid address Output results: –the geo-referenced layers (GeoTIFF, shape files) should be provided as a downloadable archive