ALICE Electronic Logbook MEST-CT-2005-020216 Vasco Barroso PH/AID.

Slides:



Advertisements
Similar presentations
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Helmut Dres, Institute For Scientific Computing – GDB Meeting Global Grid User Support.
Advertisements

C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 Databases in ALICE L.Betev LCG Database Deployment and Persistency Workshop Geneva, October 17, 2005.
EvoNet Highlights by Terry Fogarty, EvoNet Coordinator.
Information Systems and Data Acquisition for ATLAS What was achievedWhat is proposedTasks Database Access DCS TDAQ Athena ConditionsDB Time varying data.
Introduction to Technical Communication Week 1 Technical Communication DAHMEN.
IEEE NPSS 17 th Real Time Conference The ALICE Electronic Logbook Vasco Barroso for the ALICE Collaboration.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
The Computer Science Course at Omar Al-Mukhtar University, Libya The Computer Science Course at Omar Al-Mukhtar University, Libya User-Centered Design.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
28 August 2015T Kari Laitinen1 T Seminar on Wireless Future 3 ECTS cr Dr. Kari Laitinen Principal Lecturer Oulu University of Applied Sciences.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
John Ferguson October Presentation on 2010 Website, slides,video Historical overview of AIS project, And subsequent developments Project management.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
IAEA International Atomic Energy Agency Agenda item 3.3 INIS IT developments 13th INIS/ETDE Joint Technical Committee Meeting October 2011, Vienna,
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ILC EDMS project suite Status Maura Barone GDE/Fermilab ILC Valencia - November 7, 2006.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
CERN Probably one of the most incredible experiments in the world!
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Yi Ling Hwong (ESR), CMS DAQ Yi Ling Hwong CMS.
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 Meeting Prague, 28 November 2007 Centrale Recherche S.A., Ecole Centrale Paris.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Work Package 5 Data Acquisition and High Level Triggering System Jean-Christophe Garnier 3/08/2010.
> 1 ENGINE WP2 Special Meetings, Orléans, France, 13&15/02/2006 ENGINE ENhanced Geothermal Innovative Network for Europe WP2 Special Meetings Information.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
ICE-DIP Mid-term review Data Transfer WP4a - ESR4: Aram Santogidis › 16/1/2015.
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
ALICE, ATLAS, CMS & LHCb joint workshop on
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Adriana Telesca Mid Term Review 3 rd August 2010.
ACEOLE Review Early Stage Researcher, WP5 Dan Octavian SAVU.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
Neil Stewart, Digital Repository Manager, City University London Paper presented at Open Repositories 2012, Edinburgh, 9 – 13 July 2012 Coming late to.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
Summary Collaborative tools track Eva Hladká Masaryk University & CESNET Czech Republic.
Proposal of interface between GUS + Call Center and Experiments GDB Meeting – Klaus-Peter Mickel GridKa Karlsruhe.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
CERN IT Department CH-1211 Geneva 23 Switzerland t CF Computing Facilities Agile Infrastructure Monitoring CERN IT/CF.
INFSOM-RI WP5: Dissemination, Training, Certification Study and Web Interface Status Report ETICS All-Hands – 21 November 2007.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
The ATLAS DAQ System Online Configurations Database Service Challenge J. Almeida, M. Dobson, A. Kazarov, G. Lehmann-Miotto, J.E. Sloper, I. Soloviev and.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
SEE-GRID-SCI NA4 Progress PSC05, Dubrovnik, 9-11 September 2009 Cevat Şener Dept. of Computer Engineering, Middle East Technical.
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
The ALICE data quality monitoring Barthélémy von Haller CERN PH/AID For the ALICE Collaboration.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Spyridon.
Bob Jones EGEE Technical Director
(Prague, March 2009) Andrey Y Shevel
ELACCO mid-term Review
Work Package 5: Data Acquisition
Mid-term review presentation 3rd August 2010
Marie Curie, CMS & I : When People and Ideas Come Together
Update on Spanish Recruitment: Students, Staff, Fellows, Associates
Development and Maintenance of CMS ElogBook
UML Design for an Automated Registration System
Presentation transcript:

ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID

14 November 2008V. Barroso - PH/AID 2/12 ALICE and DAQ ALICE (A Large Ion Collider Experiment) What happens to matter when it is heated to 100,000 times the temperature at the centre of the Sun ? ALICE Data AcQuisition 18 detectors 5 online systems 100’s of computers

14 November 2008V. Barroso - PH/AID 3/12 Marie Curie Fellowship Job description “...identify the relevant information to be stored in the logbook system for archiving.” “Design, implement, and deploy the relevant database architecture and Web services...” “...participate in all the aspects of a high-energy physics experiment...” Electronic replacement of paper logbook Custom-made: Extend an existing database Use the most recent web technologies Security, performance, reliability, user-friendly Information repository good run candidates for offline processing based on overall running conditions

14 November 2008V. Barroso - PH/AID 4/12 Information Repository Logbook DB LogbookHI Offline DAQ ECS TRG Online DCS HLT 100’s

14 November 2008V. Barroso - PH/AID 5/12 Web Interface

14 November 2008V. Barroso - PH/AID 6/12 ALICE Electronic Logbook Usage in production since Aug/ registered users 30 different countries

14 November 2008V. Barroso - PH/AID 7/12 More than a Logbook ? Electronic replacement of paper logbook Central piece of the experiment’s activities Real-time status display Data-mining

14 November 2008V. Barroso - PH/AID 8/12 Data-mining Huge repository Make it relevant (for data analysis, papers, management, …)

14 November 2008V. Barroso - PH/AID 9/12 Training Management & Communication French course Level 4-5-6, January-June 2007, CERN Managing Time, April-June 2008, CERN Service Orientation, to be scheduled, CERN Technical On-the-job training in web technologies CERN School of Computing, August 2007, Dubrovnik Certification Package for Usability, February-June 2008, London User-centered analysis and conceptual design The science and art of effective Web and application design Practical usability testing Putting research into practice Software Engineering in the Small and the Large, to be scheduled, CERN

14 November 2008V. Barroso - PH/AID 10/12 Dissemination ALICE Weeks (oral presentation, audience = 10’s) ALICE Technical Forum, July 2008 (oral presentation, audience = 10’s) Marie Curie Conference, Barcelona, July 2008 (poster, audience = 100’s) CHEP 2009, Prague (abstract submitted) July 2007 October 2007 March 2008 October 2008

14 November 2008V. Barroso - PH/AID 11/12 Other points Collaboration in the development of the DATE software package Participation in the day-to-day activities of the ALICE DAQ team Contribution to the ALICE experiment commissioning and startup both as DAQ expert (presential and on-call) and shift leader

14 November 2008V. Barroso - PH/AID 12/12 Conclusion Objectives in the job description achieved Excellent environment that allowed me to evolve personally and technically The Alice Electronic Logbook has delivered even more than expected and will continue to evolve