Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Can Today's Demand Response Programs Support Integration of Renewable Energy.
Advertisements

Operating Reserves Task Force
Amendment 3/5 Workshop.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
The Role of Energy Storage in Renewable Power Integration Emily Fertig Sharon Wagner Carnegie Mellon University.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Powering forward. Together. Pathways to ZNE: SMUD Perspectives, Grid Impacts, Shared Solar Obadiah Bartholomy Rebecca Rundle Stephen Frantz Presented at.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Integrating Renewables Gloria Godson Energy Bar Association December 3,
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
An Overview of the U.S. Electric Power Grid Generation Choices, Reliability, Challenges Tom Ferguson, P.E. Adjunct Instructor Dept. of Electrical Engineering.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
A New Approach to Assessing Resource Flexibility Michael Schilmoeller Northwest Power and Conservation Council May 2, 2013 Portland, Oregon.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Hawaii Energy Storage Seminar: Utility Regulation Service
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Generation: Control & Economic Dispatch 2016 System Operator Seminar.
Changes in U.S. Regulatory Framework that Supports Energy Storage Deployment Jim Hart Vice President – South America.
SFPUC IRP Presentation to CEC April 18, INTEGRATED RESOURCE PLANNING SAN FRANCISCO PUC JAMES HENDRY SAN FRANCISCO PUC.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
RENEWABLES AND RELIABILITY
Wind Management at MISO
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Energy and Ancillary Services Design Stream Working Group Meeting 6
Grid Integration of Intermittent Resources
MIT tour of the California ISO Control Center March 31, 2015
EU-IPA12/CS02 Development of the Renewable Energy Sector
Module 4 Smart Grid Implementation Issues
2500 R Midtown Sacramento Municipal Utility District
RE Grid Integration Study with India
Solar Energy Commercialization
Presentation transcript:

Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power and Conservation Council Portland, OR August 21, 2008

July 17, System Flexibility Defined in Terms of Ancillary Services: Continuous Response: –Regulation –Load Following Contingency Response: –Spinning Reserve –Non-spinning Reserve –Replacement (Supplemental) Reserve Other Services: –Voltage Control –Black Start

July 17, Regulation Services: Regulation is the use of online generation that is equipped with automatic generation control (AGC) to track the moment-to-moment fluctuations in customer loads and generation –Compensates for short-term largely random fluctuations in load and generation –Automatic: Requires AGC –Response Speed: ~ 1 minute –Duration: minutes

July 17, Load Following Services: Load Following is the use of online generation to track the intra- and inter-hour changes in customer loads and generation –Compensates for larger, slower and generally predictable swings associated with the daily load cycle or wind generation ramping events –Can be manual –Response Speed: ~ 10 minutes –Duration: 10 minutes to hours

July 17, Scheduling and Load Balancing in the Pacific Northwest: Inter-hour Load Following Intra-hour Load Following Regulation Down Regulation Up MW Previous ScheduleFinal ScheduleActual Generation

July 17, Control Area Operation: Operators focus on maintaining the net interchange with neighboring Control Areas at the final scheduled amount –Accurately measuring net load is difficult because of large number of loads and system losses –Easier to accurately measure flows on tie lines to neighboring Control Areas because of small number of lines

July 17, NERC Control Performance Standards: Impossible to perfectly match generation and load NERC has established Control Performance Standards (CPS) to determine the amount of imbalance the is permissible for reliability purposes System frequency is the fundamental indicator of Interconnection health –Frequency drops when load > generation –Frequency rises when load < generation –Target = 60 Hz

July 17, NERC Control Performance Standards: Area Control Error (ACE) is a measure of a Control Area’s contribution to Interconnection health –ACE is negative when load > generation (under-generation) –ACE is positive when load < generation (over-generation) –ACE is zero when load = generation CPS1 is an annual standard that measures the relationship between the Control Area’s ACE and the Interconnection frequency. CPS2 is a monthly standard that limits the Control Area’s maximum ACE.

July 17, Implications of NERC CPS for the Provision of Incremental System Flexibility: Load and generation volatility is important to a Control Area if it affects CPS performance and the costs of staying within NERC CPS bounds CPS compliance is Pass/Fail –Must simultaneously satisfy both CPS1 and CPS2 –Reducing ACE is of little benefit unless the reduction moves the Control Area from non-compliance to compliance CPS compliance is measured over long time frames –Good performance can offset poor performance

July 17, Does the Region Need to Augment Power System Flexibility? Continued growth of wind generation is likely to increase the need for incremental system flexibility –Typically adds generation volatility at the seconds to minutes time scale increasing the demand for regulation –Increases the frequency and sometimes the magnitude of sub- hourly and hourly ramping events increasing the demand for load following –The need to shape wind output to load over longer time scales may increase the value of some energy storage alternatives Environmental constraints are likely to continue to constrain existing hydro system flexibility –The tradeoff between system flexibility and environmental protection is not well-understood Appears to be the most significant factor

July 17, Sources of Incremental System Flexibility See: Wind Integration Action Plan – Appendix D Generation Technologies Storage Technologies Demand-side Options System Operation Options

July 17, Generation Technologies Status Flexibility Application SCCT (e.g. LM6000, LMS100)MatureReg/ LF Reciprocating EnginesMatureReg/ LF Duct Firing Added to CCCTMatureReg Capacity Added to Existing Hydro ProjectsMatureReg/ LF

July 17, Storage Technologies Status Flexibility Application Pumped Storage HydroMatureReg/ LF Batteries - ConventionalMatureReg/ LF Batteries – Flow/RedoxBetaReg/ LF Batteries - NASEarly CommercialReg/ LF Capacitors/ UltracapacitorsIn DevelopmentReg/ LF Compressed AirMature for CavernReg/ LF Plug-in Hybrid Electric VehiclesConceptual

July 17, Demand-side Options Status Flexibility Application Load Interruption RightsMatureLF Dispatchable Distributed GenerationMatureLF Dispatchable Load CyclingMatureReg/ LF

July 17, System Operation Options Status Flexibility Application AGC Added to Existing ResourcesMatureReg ACE Diversity ExchangeIn DevelopmentReg/LF Standardized Ancillary Services ContractsReg/LF Improved Wind Prediction

July 17, Discussion Points: Have we accurately characterized the system flexibility issues? Have we listed all of the major options available to increase system flexibility? How should we prioritize our investigation of the issues and options?

July 17, Scheduling and Load Balancing in the Pacific Northwest

July 17, Scheduling and Load Balancing in the Pacific Northwest Inter-hour Load Following Intra-hour Load Following Regulation Down Regulation Up

July 17, Scheduling and Load Balancing in the Pacific Northwest Inter-hour Load Following Intra-hour Load Following Regulation Down Regulation Up