Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.

Slides:



Advertisements
Similar presentations
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété
Advertisements

SUPERCONDUCTING RF (SRF) SYSTEMS Peter McIntosh (STFC) Accelerator-driven Production of Medical Isotopes 8 th – 9 th December
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Proposal for ½ MW photo-fission driver based on TESLA 1.3 GHz SCRF technology (Shane Koscielniak, 09 Nov 2007) Electron Linac CANADA ’ S NATIONAL LABORATORY.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Accelerator Division Overview Lia Merminga Accelerator Division Head TRIUMF CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated.
Proposal for ½ MW photo-fission driver based on TESLA 1.3 GHz SCRF technology (Shane Koscielniak, 09 Nov 2007) Electron Linac CANADA ’ S NATIONAL LABORATORY.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SRF Activities at TRIUMF & PAVAC
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution.
Databases at TRIUMF Andrew Wong CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of.
10-Year Vision: expanded RIB program with: three simultaneous beams increased number of hours delivered per year new beam species increased.
February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
January 18, 2013 All Hands January ARIEL Completion and the next 5 Year Plan.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Alexander Aleksandrov Oak Ridge National Laboratory
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Turkish Accelerator and Radiation Laboratory at Ankara Suat ÖZKORUCUKLU İstanbul University.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Ion Accelerator Activities at VECC
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Operation Status of the RF Systems and Taiwan Photon Source
Subatomic Physics Detector Lab
ESS RF Development at Uppsala University
BriXS – MariX WG 8,9 LASA December 13, 2017.
Operational Experience with the Cornell ERL Injector SRF Cavities
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
Cryomodules Challenges for PERLE
R.Keitel Epics Collaboration Meeting, Padova, Oct. 2008
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
The SPL-based Proton Driver at CERN
RF introduction Anders Sunesson RF group leader
ERL Director’s Review Main Linac
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété d’un consortium d’universités canadiennes, géré en co-entreprise à partir d’une contribution administrée par le Conseil national de recherches Canada Canada’s National Laboratory for Particle and Nuclear Physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules ARIEL: TRIUMF’s Advanced Rare IsotopE Laboratory 2 nd International Particle Accelerator Conference 4 – 9 September 2011

ISAC-I & ISAC-II Rare Isotope Beam Facilities Facilities  ISOL facility with highest power driver beam  Most intense beams of certain species  Single user facility (single driver, two target stations)  Fourteen world-class experiments on the floor in three areas: low, medium, high energy ISAC-I Low and medium energy ISAC-II High energy 08/31/11 2

3  Goal is to substantially expand rare isotope beam program with: three simultaneous beams increased number of hours delivered per year new beam species increased beam development capabilities  New complementary e-driver for photo-fission  New proton beamline  New target stations and front end  Staged installation Cyclotron ISAC II ISAC III ISAC I New Targets New Mass Separators New Front End New Accelerators Low Energy Medium Energy High Energy e-linac ARIEL Project: Motivation

4 Photo-fission production of Rare Isotope Beams E-linac Electron- Photon Converter 238 U Target Ion Source Mass Separator RIB User Photofission of 238 U was proposed by W. T. Diamond (Chalk River) in 1999 as an alternative production method for RIB. High energy Photon Fission fragments neutron Fission fragments neutron E-beam RIB & neutrons, γs 08/31/11

Nuclear Science at TRIUMF in 2015 and Beyond Protons on UCPhoton-fission on U 08/31/115

6 Kinetic energy (MeV)50 Average current (mA)10 Duty Factor100% Beam Power (MW)0.5 e-Linac Physics Requirements Photo-fission products using 50 MeV 10 mA electrons on to Hg convertor & UC x target. Number of photo-fission/s vs. electron energy for 100 kW e- beam on Ta convertor and U target. For up to fissions/s 08/31/11

e-Linac: MW-class Superconducting Electron Accelerator at TRIUMF The present e-linac design concept, based on 1.3 GHz Superconducting RF technology (SRF) in CW operation, offers flexibility, possibility for expansion to other applications (Free Electron Laser, Energy Recovery Linac). 08/31/ kW 10kW 50MeV 500kW 10MeV Injector Gun Bunch Linac Module 1 Linac Module 2

5-10MeV 35 kW Injector 20kW 5kW Stage Gun Bunch 30MeV Linac Module 1 15kW 5kW Injector 100kW 10 MeV Gun Bunch Stage kW 10kW 50MeV 500kW 10MeV Injector Gun Bunch Stage 3 > 2015 Linac Module 1 Linac Module 2 08/31/11 8 e-Linac Staging VECC Collaboration

TRIUMF and VECC (Variable Energy Cyclotron Center, Kolkata, India) are collaborating on a 50MeV high intensity (10mA) cw electron linac for the production of radioactive ions through photo-fission – First stage is design and construction of two Injector Cryomodules (ICM) to 10MeV and 30kW beam test MoU of $6.2M scope was signed August Allows: – Early start of e-Linac project – Early system integration tests with beam – Additional resources – both manpower and cash (VECC Mech. Engineer arrived yesterday for 6-month stay) Progress to date excellent 08/31/119

300 keV Thermionic Gun ACOT, 2011 May 1310 Long lead items ordered: RF Cathodes, Steering coils, HVPS, Ceramic Critical path: Electrodes, Gun vessel. Project Completion: 2012 Feb. HV cage

Low Energy Transport, ICM ACOT, 2011 May 1311 e-Gun Buncher Solenoid IC M Analyzer

VECC Gun/LEBT Layout FC V-Slit Screen camera light e-Gun Buncher Solenoid Steerers

10MeV, 50MeV Transport ACOT, 2011 May 1313 RMS Emittance = 5μm, so σ ≈ 1mm. There are 76 quadrupoles, aperture diameter 52mm. As they are weak, most will be very short (yoke length = aperture dia.) with spherical poles.

Injector Cryo Module

ACOT, 2011 May 13 Warm/cold Transition Ends 15 Scissor-Tuner Assembly Single-cavity ICM prototypes most of the features of the two- cavity ACM design Accelerator CM equipment test: 2014 Feb Accelerator Cryomodule

RF Coupler Conditioning Stand ACOT, 2011 May 1316 Waveguide Coupling Box Cornell Coupler Load IOT  Test Stand design completed.  Test Stand dirty assembly completed to validate alignment fixturing and guides.  Fabrication of coupling box in progress.  Clean assembly, 2011 June  RF Conditioning to commence July 11  Condition 2 couplers at once – guarantees impedance matching. Dummy Load and WG components

The IOT transmitter has been able to produce 30 kW output power on a regular basis. It has been kept running cw at 30 kW for 24 hours, at 25kW for 40 hours and at 20 kW for 7 days without a single trip. The 30 kW IOT transmitter will be used for the coupler test. Initially rf power will be limited to 10 kW cw for rf conditioning and thermal test of the couplers. 30 kW IOT Transmitter

ACOT, 2011 May 1318 Inductive Output Tube, HVPS & SS driver amplifier  Vendors' engineers on site 2011 April to investigate.  Eventually operated tube in excess of 30kW, but operating parameters outside normal ranges.  Tubes will be shipped back to CPI for further investigation.  Further testing anticipated July  Operation required 2012 for VECC ICM test. K$400 Equipment delivered 2010 Oct. Testing revealed deficiency.

Cryogenic System Procurement ACOT, 2011 May 1319 Refrigerator and compressor Tender (M$1.8) to be issued May 30 th. Anticipate placing order mid-August Specs to be prepared: 2K Pumping System (k$250) – Sept. LHe distrib’n system (k$450) – Nov. LN2 distrib’n system – January 2012 BRIDGE

E-linac major equipment procurement 300 kW klystron contract has been awarded to CPI jointly with BESSY. HVPS draft specification document nears completion. Cryoplant tender was sent out in June. Two companies are bidding on the contract. Order will be placed beginning of September. Quadrupole design (3 types) package has been placed with D-Pace.

e-Linac: A “green” Accelerator 08/31/11 21 Requirement: 0.5 MW beam power ~15% overall accelerator efficiency => 3.3 MW total power required => ~3 MW heat generated 0.5 MW beam power on target 0.3 MW dissipated in converter Cyclotron: 5 MW ISAC: 1.5 MW ~10 MW heat generated e-Linac and ARIEL Targets: 3.3 MW Presently using ~3000 litres/min through cooling towers => ~6 MW Goals: - Use the e-Linac as a proof-of- principle demonstration of recovery of waste heat from a real system. - Aim at “greening” all TRIUMF accelerators. Working with UBC Sustainability Office, collaborators in Lund.

Acknowledgements 22 At TRIUMF: Ames, Austen, Baartman, Ballard, Beard, Bylinsky, Chao, Clark, Dale, Drozdoff, Emmens, Fong, Hurst, Kaltchev, Khan, Koveshnikov, Koscielniak, Laxdal, Levy, Louie, Mammarela, Merminga, Mitra, Mitrovic, Morrey, Preddy, Reeve, Ries, Richards, Rowbotham, Sitnikov, Teodoropol, Trinczek, Trudel, Verzilov, Waraich, Yosifov, Zvyagintsev. At U.Vic: Karlen, Abernathy, Birney. Langstaff, Storey. 08/31/11

Canada’s National Laboratory for Particle and Nuclear Physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules Thank you! Merci! 4004 Wesbrook Mall | Vancouver BC | Canada V6T 2A3 | Tel | Fax |

Time line (funding) 08/31/1124 Funded now: –CFI & TRIUMF Manpower : e-linac –Provincial Government : ARIEL Buildings Exploring funding to complete in this 5YP: –Electron Target Station –ARIEL Front-end for ISAC Next five-year plan: –Proton Beam line –Proton/electron target –2 nd ARIEL Front-end for ISAC