Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.

Slides:



Advertisements
Similar presentations
Proposed Water & Sewer Rates FY2014 Department of Utilities & General Services April 1,
Advertisements

Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
May 30, Meeting & Outreach efforts  February 27th – Proposed Compensation Plan Distributed to Joint Admin/WWOC  March 5th – Joint Admin/WWOC Meeting.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
1 Amador Water Agency Financial Impacts of Water Shortage and Proposed Shortage Strategy April 9, 2015 The Reed Group, Inc.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Maintaining Sustainable Water and Waste Disposal Services Copyright 2011 Community Resource Group, Inc. No part of this presentation may be copied or.
1 Department Department of of Public Utilities Presentation of Study Results August 2006.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
CAFR Analysis Amanda Grieco December 2,  Incorporated in 1857  Located in the northeastern part of the state  Top growth area in the state 
Council Workshop, February 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0.
2014 Budget Department Presentations Infrastructure Funding Options.
City of Houston Long Range Financial Management Task Force City Financial Overview Part I August 29,
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Contacts February 12, 2012 CITY OF PALM COAST, FLORIDA Mark Galvin Senior Vice President 450 S. Orange Avenue Suite 460 Orlando,
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
City of North Miami Beach Quarterly Financial Analysis Second Quarter – FY 2015 Data as of March 31, 2015.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
February 2, 2011 Joe Yew City of Oakland California Debt and Investment Advisory Commission Debt 2: Accessing the Market Debt Policy and Plan of Finance.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Nassau-Amelia Utilities FY 2008 Utility Rate Study Presented by: Andrew J. Burnham July 9, 2007 Nassau-Amelia Utilities.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
Long-Term Financial Planning Plan of Finance 1 Debby Cherney, Deputy General Manager Charles Turner, Director of Finance
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
1 Water Department FY 2014 Sources and Uses FY 2014 Sources Retail Sales$54,788,834 Wholesale Sales646,250 Other Operating Revenues145,000 Non-Operating.
Resolution 2014R-100 December 18,  Board Direction ◦ Establish a “Stabilized” cost-of-service rate of $ for FYs 2015 & 2016 that includes.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
U TILITIES 2013 BUDGET OVERVIEW Electric Department – Fund 520 Water Department – Fund 525.
Water and Wastewater Rates Public Hearing July 15, 2015 The Reed Group, Inc. 1.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, June 7 th 2016.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
City of East Point FY 2012 Budget Presentation. Comparison of FY11 vs. FY12 Budget Policies Proposal FY 11 TotalFY12 O&M Changes FY11 Current Budget 94,652,326.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Financial and Capital Highlights Fiscal Year Second Quarter Charles Turner, Director of Finance
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
City of Petersburg Water and Wastewater Rates
Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
MOUNTAIN REGIONAL WATER
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
City of Rialto Midyear Changes Budget-Fiscal Year 2012/2013
City of Sisters, OR 2017 Water & Sewer Rate Study
City of Palm Coast, Florida
City of Petersburg Water and Sewer Rates April 26, 2011
Water and Sewer Rate Study
ELECTRIC REVENUE REFUNDING BONDS SERIES 2016A
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
Work Session Follow UP Aug. 23, 2018.
Mark Beauchamp Utility Financial Solutions, LLC
2018 Water/Wastewater Rate Study and Financial Forecast
Bond Basics Bradley D. Viegut, Director / Fax.
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Presentation transcript:

Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility System Revenue Bonds, Series 2013 October 30, 2012 Public Resources Management Group, Inc. Presented by

Agenda  Background and Purpose  Series 2013 Bonds  Financial Forecast  Customer Statistics / Revenue Projections  Capital Improvement Funding  Revenue Requirements  Adequacy of System Rates  Other Issues  Rate Design  Capital Facilities Fees  Bulk Water and Wastewater Charges  Next Step  Conclusions and Recommendations 2

3 Background and Purpose  Prepared in Anticipation of the Issuance of the Series 2013 Bonds  Last Formal Rate Study Prepared in FY 2007  Support Issuance of Series 2007 Bonds  Rates Adjusted Uniformly 12.5% Effective November 1, 2008  City has Annually Indexed Rates Fiscal Years 2010 to 2012 Average Annual Increase = 1.67%  Evaluate the Sufficiency of Rates  Five-Year Financial Forecast & Funding Analysis – FY  Fully Fund System Expenditures  Develop Capital Improvement Financing Plan  Satisfy Rate Covenants Defined in the Bond Resolution  Maintain Financial Stability of System

Series 2013 Bonds  Refunding of the Existing Series 2003 Bonds  Low-Interest Rate Environment / Achieve Interest Rate Savings  Annual Savings of Approximately $550,000  Free-Up Debt Service Reserve Fund of Approximately $6.2 Million – Available to Fund Future Capital Projects  New Money to Fund Capital Improvements = $15,000,000  Series 2013 Bonds-Funded Projects Include:  Water Treatment Plant No. 1$500,000  Water Treatment Plant No. 2$11,100,000  Water Treatment Plant No. 3$3,020,000  Water Mains$3,000,000  Wastewater Treatment Plant No. 1$1,480,000  Lift Stations and Pump Stations$2,600,000 4

5  Issuance Requires Preparation of Financial Forecast and Bond Feasibility Report  Debt will be payable from Pledged Revenues which includes Capital Facilities Fees (Impact Fees) Series 2013 Bonds (cont'd.)

6 FINANCIAL FORECAST

7  During FY 2012 the City Served on Average:  42,720 Water Accounts  35,102 Sewer Accounts  Active Account Growth of System  Compounded Growth Rate FY 2000 to FY 2006 – 11.60%  Compounded Growth Rate FY 2007 to FY 2012 – Less than 1.0%  Utility Customer Growth Projections FY 2013 through FY 2017  Forecast Assumes Conservative Growth Projection of Less than 1.0% – Less than 100 Connections per Year  Average Use per Customer  Relatively Consistent by Class  Typical Residential Customer = 4,100 Gallons per Month of Water Customer Statistics Revenues Projections

8  Projected Revenues from Existing Rates Based on the Following:  Customer and Sales (Use) Forecast  Current Rates and Charges as Adopted – No Indexing to Identify Total Rate Needs Customer Statistics Revenues Projections (cont'd.)

9 Revenue Requirements  Evaluated Revenue Requirements – Based on Following Formula: + Operating Expenses +Debt Service Payments +Capital Funded from Operations +Deposits to Working Capital (Fund Balance) / Debt Compliance –Other Operating Revenues and Income –Use of Working Capital (Fund Balance) = Net Revenue Requirements Funded From Rates

10 Revenue Requirements  Operating Expense Forecast Based on FY 2013 Adopted Budget  Forecast Recognized:  System Growth in Accounts Served/Flows  Inflationary Allowances Ranging from 1.5% to 3.5% Based on Nature of Expense  Labor Cost Increases and Personnel Additions (8 Positions Over the Forecast)  Contingency Allowance of 3.0% was Included in Forecast to Account for Unanticipated Expenses

11  Capital Improvement Plan Assumed to be Funded as Follows: Capital Improvement Program Funding

12  Annual Transfer for Renewal and Replacements  Required for Bond Resolution (5% Minimum)  Forecast Recognizes 10% of Prior Year's Gross Revenues or Approximately $3,000,000 per Year  10% Required for Sustainable Long-Term Operations  Series 2013 Bonds – Provide $15.0 Million in Project Funding  Approximately $400,000 per Year Net Increase in Debt Service Payments Capital Improvement Program Funding (cont'd.)

13  Additional Parity Bonds Recognized:  $38.99 Million in Project Financing / $43.9 Million Principal Amount of Bonds  Approximately $3,100,000 per Year Increase in Net Debt Service Payments Assumptions for the Series 2014/2015 Bonds are as Follows: Capital Improvement Program Funding (cont'd.)

14 Adequacy of System Rates  Existing Monthly Water and Wastewater Rates Not Anticipated to be Adequate to Meet:  Operating Expenditures and Capital Funding Requirements  Debt Service Payments and Coverage Requirements  Identified Rate Adjustments:

Adequacy of System Rates (cont'd.)  Reason for the Purposed Rate Adjustments:  Lack of Historical System Growth Affecting Revenues – Utility Absorbed Price Increases Above Indexing Allowance – Significant Reduction in Capital Facilities Fees  Continued Inflationary Impacts on Cost of Operations  Increased Debt Service Requirements Associated with Additional Utility System Revenue Bonds  Need to Have Sufficient Revenues to: – Meet Bond Issuance Requirements – Maintain Financial Creditworthiness and Bond Rating  Increase in Transfer to Renewal and Replacement Fund for 5% to 10% per Year for Blend of Pay-as-you-Go Capital and Debt Financing – Improve Long-Term Utility Position 15

16  Reason for the Purposed Rate Adjustments:  Maintain Adequate Debt Service Coverage Ratios and Bond Rating in Support of Financing – Senior Lien Coverage – Target % Over the Forecast  City Currently an "A" Rated Utility By Fitch and Standard & Poor’s  Fitch “ A " Rated "All-In" Coverage Medium = 1.4X Adequacy of System Rates (cont'd.)

17 Performance Metrics & Dashboards

18 Performance Metrics & Dashboards (cont’d)

19 Performance Metrics & Dashboards (cont’d)

20 Performance Metrics & Dashboards (cont’d)

21 Water and Wastewater Comparison Typical 5/8" Meter Monthly Bill At 5,000 Gallons

OTHER ISSUES AND CHARGES

23 Other Issues  Rate Design  Upon Finalizing Revenue Requirements an Evaluation of the Existing Rate Structure – Base vs. Usage Charges  Capital Facilities Fees (Impact Fees)  PRMG will Calculate Revised Capital Facilities Fees – Recognizing Current Fixed Assets and New Capital Improvement Program (FY 2013 through 2017)  Bulk Water and Wastewater Charges  New Bulk Water and Wastewater Charges Based on the System- Wide Revenue Requirements

24 Next Step  PRMG will Bring Revised Rates, Fees, and Charges To Future Council Meeting for Adoption

25 Conclusions and Recommendations  Existing System Rates are not Adequate to Meet System Expenditures throughout the Forecast Period  The Financial Forecast Recognizes Need for Proposed Rate Adjustment  The Proposed Rate Adjustments are as Follows:  Rate Increases Necessary to Fund Capital Plan / Issue Bonds

26 Conclusions and Recommendations  Proposed Rates Should be Adequate to Comply with the Minimum Rate Covenants as Defined in the City's Bond Resolution and Maintain Current Bond Rating