IUID Registry Update 9 May 2006. Registry Statistics (through 3 May 06) 192,092 Items registered 162,478 New items 29,614 Legacy 329 Contractors have.

Slides:



Advertisements
Similar presentations
Government Furnished Property
Advertisements

IUID Registry Overview
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Presented by: Bruce Propert Defense Procurement and Acquisition Policy Communicating IUID Requirements to Contracting and Industry.
Asset Tracking/ITV Strategy Distribution Steering Group 23 October 2012.
John Gallagher Manager, Data Acquisition and Management State Government of Victoria SSI Victorial Summit 2008.
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
Recently proposed FAR and DFAR rules changes, etc. Aerospace Industries Association Property Management Committee Reported by: Alex N. Barenblitt, CPPA.
UID Discussion DAEC October 7, UID Status DoD’s policy issued July 29, 2003 Serious implementation questions exist based on draft DFARS rule.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
6/19/2007SE _06_19_Overview_Inspections.ppt1 Team Software Project (TSP) June 19, 2007 High Level Designs, Code Inspections & Measurement.
Item Unique Identification (IUID) Update for JPIWG
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Presented by 9/8/2011 DPAS Loans Via WAWF Scott Milewski.
IUID Registry Overview
Item Unique Identification (IUID) 24 July The Genesis of IUID  GAO concerned with DOD management of its inventory of equipment.  Finding: DOD’s.
2013 NPMA Fall Conference Value Through Professional Asset Management IUID Are you Ready? Mike Herskovits, CPPM November, 2013.
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items.
0 TITLE: Item Unique Identification Presented To: SDR Committee Dec 7, 2006 Lydia Dawson, Procurement Analyst Defense Procurement and Acquisition Policy,
Automatic Identification Technologies (AIT)/Item Unique Identification (IUID) and Real Time Locator System (RTLS)
Acuity STAR Intermediate. Acuity STAR Acuity STAR Intermediate Level Training Author: Paul Malcomson Last Update: January 2015 Target Audience: Faculty.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Wide Area WorkFlow (WAWF) Presented By: Carol F. Albany DCMA E-Business Directorate November 18, 2004.
Price Responsive Load / Retail DR Update to RMS Karen Farley June 3, 2014.
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items.
UNCLASSIFIED GFP Management Update Mr. Samuel Perez Headquarters, U.S. Marine Corps, LPC-2 2 February 2011.
CONNECT Roadmap Draft version as of February 4 th,
AIA WAWF/UID/RFID Working Group Meeting (May 9-10, 2006) Government Furnished Property Update and Q&A.
Item Unique Identification (IUID). Chris Webster Office of the Undersecretary of Defense (AT&L) DLA Liaison for Program Development and Implementation.
Generic GFE Implementation Toolset for Prime Contractors -IUID Guidance- –Initial population of Government Furnished Equipment Data into the IUID Registry.
IUID Registry GFP Module Development Releases v5.0 and v5.1 Proposed Functionality User Test Scenarios JOINT SMALL ARMS/LIGHT WEAPONS COORDINATING GROUP.
Jenna Tomalka, System Ops Manager IUID Registry April 26, 2012 IUID Registry Overview.
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items LeAntha Sumpter
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
AIA RFID Data Exchange Guideline Status AIA / Electronics Enterprise Integration Committee May 10, 2005.
Lifecycle Management UID Req’ts  Review UID pedigree data elements 1.Existing Items (Legacy) 1. Items in Inventory 2. Inbound (UID Clause not in contract)
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items.
U NIQUE ID ENTIFICATION (UID) Wide Area Work Flow (WAWF) Update March 9-10, 2004 James Craig
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
Government Furnished Property Policy Breakout
UID Road Ahead LeAntha Sumpter December Data Roadmap Time Line FY-07 FY-06 FY-05 FY- 04/05 Enterprise Visibility AccountabilityValue OrganizationProgramLocationStatus.
Government Furnished Property Data Capture Breakout
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
2014 NPMA Spring Seminar Value Through Professional Asset Management IUID Clause and Implementation from a Contractor Company Perspective Dan Tully April.
1 Defense Logistics Agency DOD Activity Address Directory (DODAAD) Reengineering Data Enhancements.
Process for COTS Items Requiring IUID. Supplier Fulfills IUID Requirements Customer Requires Warranty Negotiate Purchase Include: DFARS MIL-STD 130M Data.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS.
National Enrolment Service (NES) Overview October 2015 – June 2016.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Electronic Enterprise Integration Committee Overview of Aerospace Industry IUID Data Exchange Guideline December 14, 2005 Bill Zirkel, Northrop Grumman.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
OUSD(AT&L) Acquisition Resources & Analysis (ARA) Property and Equipment Policy Leveraging Item Unique Identification for Property Accountability Ms. Amber.
1 24-May-05 UID Accomplishments Since Dec 2004  Change 1 issued to MIL-STD 130L clarifying quality requirements for Direct Part Marking (Dot Peen, Laser.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
DoD – Supply Chain Integration UID process and data flow December 13, 2006.
UID Program Plans.  Template Released after last JACG 14 October  Comments Rec’d from the Air Force and the Army Plans need to address: Cost, schedule.
IIS Project and Contact Management Systems (CMS): An Efficient Comprehensive Management Approach to IIS Recruitment, Training and EHR Integration IIS Community.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
GRADS Advisory Committee Meeting 4 May 9, 2016 Lori Cottrill.
CRM Training Courses &Online Courses and Salesforce Online | classroom| Corporate Training | certifications | placements| support.
Public Purchasing in Florida MyFloridaMarketPlace Brief September 16, 2005.
Information Exchange under the DLMS SDR Transformation Initiative, DoD WebSDR, & Item Unique Identification (IUID) SDR Committee Meeting, Dec 6, 2006.
Warranty Tracking & Source of Repair Instructions Warranty Tracking & Source of Repair Instructions DPAP Training 1.
Item Unique Identification (IUID) - Update
Chapter 18 Maintaining Information Systems
Warranty Tracking & Source of Repair Instructions
Communicating IUID Requirements to Contracting and Industry
Collaborative Contracting Solution
DSC Change Committee Update
Presentation transcript:

IUID Registry Update 9 May 2006

Registry Statistics (through 3 May 06) 192,092 Items registered 162,478 New items 29,614 Legacy 329 Contractors have delivered new UIIs 194 of the contractors (59%) are small businesses Growth rate over 9,000 UIIs/week 19,788 Items are in GFP status 1,068 contracts with GFP listed

Registry Population (through 3 May 06)

Survey of Contract Language Sampled 382 supply contracts from June and July 2005

Survey of Contract Language Sampled 382 supply contracts from June and July 2005 Percentages weighted by component based on number of contracts issued

Survey of Contract Language (Contracts with delivered UIIs) as of 25 January 2006 Sampled 45 of 526 contracts with delivered UIIs, 95% confidence interval 14%

Registry Releases Release /05 – Interface improvements –Separate workflows for new, legacy, GFP –Update processes Part Number changes Custody Marking Relationship changes –Audit Traceability Improvements Release 3.2 – 4/06 – Enhancements and Interfaces –Added Roles for Government –Application Program Interfaces UII Verification UII Retrieval from elements Data Submission Validation - IUID validation of construction –GFP Summary by contract –GFP Summary by contractor

Registry Improvements in the Works 3.2 Patch – 7/06 –Page format improvements –Error message improvements –Improved on-screen notes –Minor bugs 3.3 Reporting improvements 11/06 –On-line Scheduled reports Volume by contractor, contractor size Volume by UID type Correction report –Application Program Interfaces Data Submission Validation - IUID validation of construction –Tracking of end of life cycle –Profiling usage 4.0 TBD –Capture Warranty requirements –Added metrics –Performance enhancements –Mapping to NSNs, other non-unique identifiers (may not be in Registry)

Industry Participation Participants invited to 3.2 testing Thirteen testers from seven companies and one DoD agency participated Inputs captured on-line Industry Open Issues from testing –Registry User Training –Date formatting inconsistent with WAWF MM-DD-CCYY vs. MM/DD/CCYY May make interchangeable in future release Plan to invite industry to 3.3 testing – probably October 2006 –Will try for more advance coordination on access

Data to capture on warranties First Draft –Warranty Status – (present, none, type?) –Contract Number (already captured in IUID Registry) –Warranty Provider ID IAC – if Warranty Provider EID provided –Warranty Provider EID – if different from Prime –Warranty Duration - numeric –Warranty Duration Units (hours, days, months, cycles, miles …) –Warranty Duration Units Type (usage, existence,…) –Warranty Start Event (e.g. delivery, installation, first operation) –Organic repair status (voids, does not void, consideration, …) Air Force led group reviewing internally