Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Regional Transmission Organizations: A Primer
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
October 30, 2014 Terry Wolf, Manager of Transmission Services.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Highway-Byway Cost Allocation: What it Offers MISO January 2010 Presented to the Organization of MISO States CARP and the Midwest ISO RECB Task Force Meeting.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
Sue Sheridan President and Chief Counsel Coalition for Fair Transmission Policy EEI Transmission and Distribution Conference April 2012 TRANSMISSION PLANNING.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
ASSOCIATION OF ENERGY ENGINEERS – SW OHIO PJM AND OHIO REGULATORY CHANGES HOWARD PETRICOFF VORYS, SATER, SEYMOUR & PEASE LLP 1.
1 American Electric Power Company Transmission Formula Rate AEP East Companies Annual Formula Rate Update June 2012.
1 American Electric Power Company Transmission Formula Rate AEP Appalachian Transmission Co., Inc. AEP Indiana Michigan Transmission Co., Inc. AEP Kentucky.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
BUILDING THE NEXT ERA OF CLEAN ENERGY 2010 Mid-America Regulatory Conference - Integrating Renewables to the Grid F. Allen Wiley Vice President, Business.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
PJM©2013www.pjm.com Deployment of smart-grid technologies – Technology and market challenges Stu Bresler VP, Market Operations PJM Interconnection University.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
Updated 1/28/2011.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
FERC Staff’s Report on Demand Response and Advanced Metering.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Energy Markets at the Crossroads Illinois State University Institute for Regulatory Policy Studies 12 December 2002 Springfield, Illinois Vito Stagliano.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Electric Industry Overview: Municipal Electric Utilities Municipal Utilities are not-for-profit electric systems owned and operated by the people and.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
FERC Docket No. EL PJM Interconnection, L.L.C. Paper Hearing Regarding 7 th Circuit Remand.
Wind Management at MISO
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
North American Markets Status
Evolving Economic Dispatch in SPP
T.O. Highway/Byway Recommendations
Transmission Planning at PJM Interconnection LLC
Westar Formula Rate and your bill
2018 RTEP Report Key Maps, Tables & Figures
Presentation transcript:

Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP

47% of Nation’s Generation Interconnection Queue Renewable Energy Development

Cost Allocation: Comparison to Other RTO’s RTOCost Allocation* PJMReliability and Economic upgrades at voltages of 500 kV and above, including any facilities below 500 kV needed to support the 500 kV and above upgrades, are allocated 100% to load based on each zone’s share of zonal non-coincident peak load. ISO NEReliability Transmission Upgrades that includes transmission at voltages of 115 kV and above are 100% allocated to all load across ISO-NE based on monthly zonal coincident peak loads. ERCOTPUCT-approved transmission costs, without regard to reliability or economic drivers, are allocated 100% to load based on the average monthly coincident peak over the months of June through September. Costs allocated regionally to load and to power exports from ERCOT region, based on load-ratio share. CAISOThe costs of all reliability or economically-driven upgrades 200 kV and above approved by the CAISO are allocated to all transmission customers on a megawatt- hour (MWh) basis across all load in the CAISO. NYISOCosts allocated based on beneficiary pays SPP**Cost of upgrades at or above 300 kV are allocated regionally. For upgrades between 100KV to 300KV 1/3 rd of the costs would be allocated regionally and 2/3 rd to the zones where the transmission is being built. For upgrades below 100KV 100% of the costs would be allocated to the zones where the transmission would be built. MISOUpgrades at or above 345 kV are allocated 100% to load. 20 percent of costs are allocated based on average monthly coincident peaks across the entirety of MISO. The remaining 80 percent of costs are allocated through flow-based methods. Obtained from the PJM report titled “A Survey of Transmission Cost Allocation Issues, Methods and Practices” issued March 2010 ** Proposed methodology approved by SPP Board and pending FERC approval

Components of Electricity Price Left Graph: Source Milken institute Report titled “Financial Innovations for Energy Infrastructure. The Grid, Renewables and Beyond” Right Graph: Obtained from the PJM report titled “A Survey of Transmission Cost Allocation Issues, Methods and Practices” issued March 2010 Transmission 7% Distribution 26% Generation 67%

RTO Transmission Investment RTOTransmission InvestmentAnnual Future Investment Transmission Line (miles) Wind [7] Capacity (MW) Total Gen Capacity (MW) ISO New England Actual 2007 spend of $500MM Expected spend of $4.2B [1] $800MM8, ,700 MISOActual investment of $1.67B in 2006 and 2007 Future spend of $4.3B between [3]. $900MM111,0007,200138,556 New York ISO Expected spend of $2B$400MM10,9001,27538,000 PJM spend of $6B in reliability projects [2]. $1B56,3502,500165,000 ERCOTActual spend of $1.3B since 2008 and Future spend of $8.2B [4] $1.2B40,3279,00080,000 CAISOFuture Spend of $5B between $1B25,0003,00049,000 [6] SPPFuture spend of $4.2B between [5] $420MM50,5754,00066,000 1 Obtained from RTO report card published 2009 by Christensen Associates and National Rural Electric Cooperation Association 2 Obtained from PJM 2009 RTEP report 3 Obtained from MISO 2009 MTEP report 4 Obtained from 2009 ERCOT Constraints and needs report 5 Obtained from 2009 SPP’s STEP report and does not include priority projects 6 Does not include 10,000MW of imports 7 Reflects existing wind capacity