RIPDES Storm Water Program: Large and Small Construction.

Slides:



Advertisements
Similar presentations
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Advertisements

Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Introduction to Construction General Permit Inspections.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
January 6,  INTRODUCTION  BACKGROUND  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ PROPOSED BUDGETS, LEVIES AND CIRCUIT BREAKER 2.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Stormwater Control & Design
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
NPDES Permit Application and Annual Fees NPDES Permits NPDES Permits are issued for the discharge of municipal, industrial, or commercial (non- storm.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
EPA Storm Water Run Off Review and Reading Assignments.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Clear, Consistent, & Predictable Rules Unifying State and Local Soil Erosion and Sediment Control Standards for Better Outcomes Eric Beck, P.E. Supervisor,
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
San Rafael, California November 12, 2015
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
City of Clarksville Storm Water Management Manual Revisions 2014.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Municipal Separate Storm Sewer System (MS4) Permit
Supervisor, RIDEM RIPDES Permitting Program
Stormwater Management Program
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
Flow chart to determine whether coverage is required
Wastewater Permitting Updates
Presentation transcript:

RIPDES Storm Water Program: Large and Small Construction

Large Construction (Phase I) Permitting Found under Category (x): Industrial Activities Regulatory definition: Rule 31(b)(15)(x) Point Source Discharges From Land Disturbance of five or more acres –Clearing, grading or excavation –Activities part of a larger common plan of development –Multiple activities within a contiguous area –Includes activities taking place on different schedules

Large Construction (Phase I) Permitting Construction General Permit (CGP) –RIPDES re-issued in March 1998 –To be re-issued in March 2003 Requires submission of application and storm water pollution prevention plan Allows automatic authorization for projects approved by CRMC, DEM Freshwater Wetlands, DEM WQC, and Local Conservation Districts.

New Phase II Rules Small Construction Activity RIPDES Permits required for construction sites disturbing > 1 acre. Construction activity below 1 acre that is part of a larger common plan of development or sale Construction activity that disturbs less than 1 acre of land may be designated based on water quality impact

New Phase II Rules Small Construction Activity (Continued) Rules allow DEM to recognize approvals issued by local sediment and erosion control programs. Located in regulated small MS4 - must also comply with MS4’s construction requirements

Reasons for Local Construction Requirements Requirements tailored to locality Local oversight more effective than just State oversight Protect local infrastructure and prevent introduction of pollutants into the local storm sewers and drainage system

Construction Activity Survey Survey Goals: Determine the extent of local sedimentation and erosion control programs. –Resources currently available –comparison with construction general permit requirements –comparison with MS4 requirements

Responses Nineteen (19) of Twenty nine (29) automatically designated communities responded to the survey (66%) Four (4) out of (10) communities outside of urbanized areas responded to the survey (40%)

Survey Summary Most municipalities review proposed construction plans for proper E&S controls (95%) fifty three percent (53%) have full time staff for reviews Twenty six percent (26%) review plans for ‘other’ controls Seventy four percent (74%) have adequate legal authority Sixty three percent (63%) require submission of a plan Seventy six percent (76%) perform inspections Sixty three (63) percent have full time staff for inspections

Survey Conclusion Majority of municipalities that responded review & inspect Most have adequate legal authority More than half have full time staff Most will have to include additional requirements to be considered a qualifying local program

Conclusion Deadline for application/NOI for small construction: 3/2003 and 90 days prior DEM required by EPA rule to issue GP by December 2002 RIPDES plans to update GP>5 with work group