Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers.

Slides:



Advertisements
Similar presentations
Transportation Impact Analysis Presented By Katy Flynn, P.E. Fehr & Peers February 19, 2008.
Advertisements

FHWA Guidance & Policies on Traffic Analysis James P. McCarthy, PE, PTOE Federal Highway Administration
Roundabout Level of Service and Delay and Comparison to Other Intersection Types Roundabout Level of Service and Delay and Comparison to Other Intersection.
Roundabout Capacity Analysis
Hcm 2010: roundabouts praveen edara, ph.d., p.e., PTOE
Chapter 131 Chapter 13: Fundamental Concepts for Uninterrupted Flow Facilities Explain why capacity is the heart of transportation issues. Define capacity.
Capacity, Level of Service, Intersection Design (1)
The 2010 Highway Capacity Manual
September 24, 2012 Genesee County Road Commission Dye & Court Roundabout Dye Road and Court Street Roundabout Construction John Daly, Manager-Director.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
Chapter 15: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of this chapter the student will.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
An Analytical Framework for Managed Lane Facility Performance Evaluation Xiaoyue Cathy Liu University of Washington To Be Presented at the Western ITE.
Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
ROUNDABOUTS. What Is A Roundabout? A specific type of traffic circle Not all traffic circles are roundabouts.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Traffic Signal Warrants
Incorporating Safety into the Highway Design Process.
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Analyses of Unsignalized Intersections
Lec 20, Ch.18, pp : Analysis of signalized intersections, HCM (Objectives) Understand the conceptual framework for the HCM 2000 method Understand.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
Design Speed and Design Traffic Concepts
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
We know traffic Roundabout Capacity and Performance (Revised June 2001) International Conference on Modern Roundabouts, September 1998, Loveland, Colorado,
Martha Moore, P.E. Ghyabi & Associates October 10, 2014
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
VISSIM and Mn/DOT’s INTERSECTION CONTROL EVALUATION (ICE) VISSIM USER’S GROUP MEETING MAY 15-16, 2008 Philadelphia Dennis Eyler, P.E., P.T.O.E. Vice President.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
ROUNDABOUT CHARACTERISTICS TTE DEFINITIONS TRAFFIC CIRCLE: u Any intersection designed around a central island ROUNDABOUT: u A traffic circle with.
TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007.
Role of SPFs in SafetyAnalyst Ray Krammes Federal Highway Administration.
Introduction to Transport
Chapter 13: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
Problem 4: Okeechobee Road Stopped Control Analysis.
1 VISSIM Protocol ITE Oregon Traffic Simulation Roundtable May 31, 2012 Chi Mai.
Fundamental Principles of Traffic Flow
Roundabout Feasibility: Analysis Framework and Design Considerations Presented By: Jason D. Pack, P.E. Fred Choa, P.E.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
MIDCAP Maryland Intersection and Interchange Design & Capacity Analysis Program.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Chapter 9 Capacity and Level of Service for Highway Segments
Traffic Simulation Model Theory and Application Basics of Traffic Simulation Course Instructors: Mark Hallenbeck, Director, UW TRAC Tony Woody, P.E., CH2M.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
The New 2010 Highway Capacity Manual An Overview.
Traffic Simulation L3b – Steps in designing a model Ing. Ondřej Přibyl, Ph.D.
Case Study 4 New York State Alternate Route 7 Problem 2.
Case Study 4 New York State Alternate Route 7 Problem 4
HCM 6th Edition: Roundabouts
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
Tasnim Rabee’ Nagham Dmaidi
FM 518 By-pass Traffic Review
Problem 5: Interstate 87 Interchange
Problem 5: Network Simulation
School of Civil Engineering
Presentation transcript:

Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Source: FHWA, Dokken Engineering

Presentation Overview Roundabout Analysis Framework Roundabout Analysis Methods & Software Case Study #1 – SR 32 in Chico, CA Case Study #2 – Kietzke Lane in Reno, NV Roundabout Analysis Framework Roundabout Analysis Methods & Software Case Study #1 – SR 32 in Chico, CA Case Study #2 – Kietzke Lane in Reno, NV

Analysis Framework

FHWA Guidelines –ADT volume thresholds –Peak hour entering vs. circulatory flow thresholds Analysis Software –Conduct sensitivity testing –Understand methodology used FHWA Guidelines –ADT volume thresholds –Peak hour entering vs. circulatory flow thresholds Analysis Software –Conduct sensitivity testing –Understand methodology used

Simulation Checklist When to Use –V/C ratios are > 0.85 –Corridor or system –Unique geometry (5-legs, adjacent signal, etc.) Review LOS results Review queuing results Visually inspect simulation Conduct sensitivity testing –NCRHP 572 gap acceptance When to Use –V/C ratios are > 0.85 –Corridor or system –Unique geometry (5-legs, adjacent signal, etc.) Review LOS results Review queuing results Visually inspect simulation Conduct sensitivity testing –NCRHP 572 gap acceptance

Analysis Methods Macroscopic Models –For isolated locations –Analyze vehicle flows –HCM 2000, FHWA, NCHRP 572, RODEL, & SIDRA Microscopic Models –For system analyses –Analyze individual vehicles & drivers –SimTraffic, Paramics, & VISSIM Macroscopic Models –For isolated locations –Analyze vehicle flows –HCM 2000, FHWA, NCHRP 572, RODEL, & SIDRA Microscopic Models –For system analyses –Analyze individual vehicles & drivers –SimTraffic, Paramics, & VISSIM

HCM 2000 Only one-lane roundabouts LOS thresholds are undefined Results are a range of v/c ratios Use Synchro or HCS+ to calculate Only one-lane roundabouts LOS thresholds are undefined Results are a range of v/c ratios Use Synchro or HCS+ to calculate

FHWA Roundabouts: An Informational Guide (FHWA, 2000) Equations for delay and queue length For one & two lane roundabouts with regular geometry (3 or 4 legs) Recommends design to V/C of 0.85 Use Traffix or formula Roundabouts: An Informational Guide (FHWA, 2000) Equations for delay and queue length For one & two lane roundabouts with regular geometry (3 or 4 legs) Recommends design to V/C of 0.85 Use Traffix or formula

NCHRP 572 NCHRP Report 572: Roundabouts in the United States (TRB, 2007) Equations for delay and queue length For one & two lane roundabouts with regular geometry (3 or 4 legs) Based on U.S. data, but a limited sample size NCHRP Report 572: Roundabouts in the United States (TRB, 2007) Equations for delay and queue length For one & two lane roundabouts with regular geometry (3 or 4 legs) Based on U.S. data, but a limited sample size

RODEL Barry Crown, UK Regression equations based on observations of UK intersections Design elements determine approach capacity (diameter, entry width, etc.) Interactive design / operations analysis Barry Crown, UK Regression equations based on observations of UK intersections Design elements determine approach capacity (diameter, entry width, etc.) Interactive design / operations analysis

RODEL

Limitations –Empirical data includes experimental observations –Uses equations calibrated to UK drivers and UK vehicles –Capacity is reached with small increases in volumes –Ignores circulatory or exit capacity –Ignores bypass lanes Limitations –Empirical data includes experimental observations –Uses equations calibrated to UK drivers and UK vehicles –Capacity is reached with small increases in volumes –Ignores circulatory or exit capacity –Ignores bypass lanes

SIDRA Akcelik & Associates, Australia Uses gap acceptance and lane utilization to determine capacity Can change headway values to calibrate to local conditions – Environmental Factor Limitations –LOS results not always consistent with predicted V/C or queues –Ignores bypass lanes Akcelik & Associates, Australia Uses gap acceptance and lane utilization to determine capacity Can change headway values to calibrate to local conditions – Environmental Factor Limitations –LOS results not always consistent with predicted V/C or queues –Ignores bypass lanes

SIDRA

SimTraffic Trafficware, USA Stochastic simulation model Uses Synchro for data input Driver behavior and vehicle characteristics Can change headway factors to calibrate to local conditions Trafficware, USA Stochastic simulation model Uses Synchro for data input Driver behavior and vehicle characteristics Can change headway factors to calibrate to local conditions

SimTraffic

Paramics Quadstone, UK Stochastic simulation model Driver behavior and vehicle characteristics Link/node network structure Automatically creates roundabout Lane change animation is unrealistic Quadstone, UK Stochastic simulation model Driver behavior and vehicle characteristics Link/node network structure Automatically creates roundabout Lane change animation is unrealistic

Paramics

VISSIM PTV, Germany Stochastic simulation model 3D animation features Link/connector network structure Specify gap acceptance parameters by lane for each approach PTV, Germany Stochastic simulation model 3D animation features Link/connector network structure Specify gap acceptance parameters by lane for each approach

VISSIM

Simulation Limitations Too many parameters can be changed that affect results Some view simulation as a methodology to “prove” a predetermined result Many agencies/companies do not have the expertise to review simulation models Too many parameters can be changed that affect results Some view simulation as a methodology to “prove” a predetermined result Many agencies/companies do not have the expertise to review simulation models

Review of Methods FHWA & RODEL –Based on British regression equations –Gap acceptance & lane configuration are not addressed in the calculation –Very easy to use SIDRA & SimTraffic –Allow calibration of gap acceptance parameters to local conditions –Easy to use Paramics & VISSIM –Most flexible in modeling driver behavior –More difficult to use as there are more parameters affecting driver behavior FHWA & RODEL –Based on British regression equations –Gap acceptance & lane configuration are not addressed in the calculation –Very easy to use SIDRA & SimTraffic –Allow calibration of gap acceptance parameters to local conditions –Easy to use Paramics & VISSIM –Most flexible in modeling driver behavior –More difficult to use as there are more parameters affecting driver behavior

Case Study #1 – Chico, CA Widening of SR 32 in Chico, CA Two-lane rural highway with access control Design Year (2030) PM Peak Hour Project considered roundabouts at the 4 study intersections Widening of SR 32 in Chico, CA Two-lane rural highway with access control Design Year (2030) PM Peak Hour Project considered roundabouts at the 4 study intersections

Proposed Design Source: Mark Thomas & Co.

RODEL Results: LOS A

SIDRA Results: LOS C

VISSIM Results: LOS F

FHWA Guidelines ADT on SR 32 & Bruce Rd at the limit –Daily volumes on SR 32 are above 40,000 vpd with high left-turn percentages Peak-hour volumes exceed entry & circulatory volume capacity –Entry + circulatory flow ~ 2,500 vph Both indicate that the roundabout should be at or over capacity ADT on SR 32 & Bruce Rd at the limit –Daily volumes on SR 32 are above 40,000 vpd with high left-turn percentages Peak-hour volumes exceed entry & circulatory volume capacity –Entry + circulatory flow ~ 2,500 vph Both indicate that the roundabout should be at or over capacity

Review of RODEL Results 20% increase in volume yields LOS F RODEL manual does not identify the upper limit of the empirical data RODEL does not account for right- turn delay even if vehicle queues block access to bypass lanes RODEL does not consider the capacity of the circulatory roadway 20% increase in volume yields LOS F RODEL manual does not identify the upper limit of the empirical data RODEL does not account for right- turn delay even if vehicle queues block access to bypass lanes RODEL does not consider the capacity of the circulatory roadway

Review of SIDRA Results V/C Ratios on all approaches exceed th percentile queue is 883 feet

Review of VISSIM Results Insufficient Circulatory Capacity Blocked Right-turn Bypass Lanes

Case Study #2 – Reno, NV Initial study performed using RODEL – Volumes were 40% lower, Result = LOS A Asked by local agency to verify results Comprehensive traffic analysis was performed using Vissim Volumes analyzed represent 20-year horizon PM peak hour Analysis compared signal and roundabout Initial study performed using RODEL – Volumes were 40% lower, Result = LOS A Asked by local agency to verify results Comprehensive traffic analysis was performed using Vissim Volumes analyzed represent 20-year horizon PM peak hour Analysis compared signal and roundabout

Study Area Proposed Roundabout Location

Proposed Design Plan 2-lane section matches existing roadway configuration

Proposed Design Results Southbound queue as long as existing queue with all-way-stop Northbound vehicles will experience long queues and delay

Modified Design Plan SB Kietzke Ln Neil Rd Between Kietzke Ln and US 395 SB Ramps 3-lane section allows both southbound lanes on Kietzke Ln to enter freeway

Modified Design Results Maximum Queue Length ApproachLength (feet) WB Neil Road535 SB Kietzke Ln (left-turn)270 EB Del Monte Ln160 NB Kietzke Ln (through)240 NB Kietzke Ln (right)225 Level of Service IntersectionDelayLOS US 395 NB Ramps / Neil Rd42D US 395 SB Ramps / Neil Rd25C Kietzke Ln / Neil Rd10A SB Neil Rd at Kietzke Ln NB Neil Rd at Kietzke Ln

Modified Design Results

Parting Thoughts Similar to signalized intersection analysis, there is no “best” methodology Methodology should be dependant on the situation Concepts in the FHWA Simulation Guidelines & HCM also hold true in identifying whether roundabouts should be simulated Similar to signalized intersection analysis, there is no “best” methodology Methodology should be dependant on the situation Concepts in the FHWA Simulation Guidelines & HCM also hold true in identifying whether roundabouts should be simulated

More Information Roundabouts: An Informational Guide (FHWA, 2000) –New edition due in 2009 or 2010 TRB National Roundabout Conference –2005 (Vail, CO) –2008 (Kansas City, MO) ITE Conferences DOT Guidance – CA, FL, NY, WI, etc. Roundabouts: An Informational Guide (FHWA, 2000) –New edition due in 2009 or 2010 TRB National Roundabout Conference –2005 (Vail, CO) –2008 (Kansas City, MO) ITE Conferences DOT Guidance – CA, FL, NY, WI, etc.

Questions?