Lessons Drawing from Evaluations Relating to PPPs

Slides:



Advertisements
Similar presentations
Cambodia’s Profile in Power Sector The First Mekong Energy and Ecology Training May 11-30, 2009, Thailand TONN KUNTHEL, BY HOUR & PHALLUY.
Advertisements

11 th Annual Meeting of the Energy Efficiency and Conservation Sub-Sector Network of the ASEAN Cooperation 06 June 2007 Hotel Furama City Centre, Singapore.
1 INTERNATIONAL WORKSHOP ON ENERGY STATISTICS UNITED NATION STATISTICS DIVISION (UNSD) NATIOAL BUREAU STATISTICS OF CHINA (NBS) China, September.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
CREE Site Visit Oslo, September 19, 2013 Who Should Pay for Transmission? Nils-Henrik M. von der Fehr.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
The Kazakh Operator of Electric Power and Capacity Market
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 11 Renewable Energy Module 11: DISTRIBUTED GENERATION: OPTIONS AND APPROACHES.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Energy Efficiency in the Power sector Mariangiola Fabbri WWF EPO - Climate and energy unit Ad Hoc Group on Energy Efficiency, 27th March 2006.
Overview of Wind Energy Grid Integration in USA ADB Wind Energy Grid Integration Workshop Sept 23, 2013 Pramod Jain, Ph.D. President, Innovative Wind Energy,
Euroheat & Power Why is there not more combined heat and power?
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
Background of PPP Negotiation
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005.
Strategies for the security of electricity supply.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Policy and Regulatory Framework in Power Sector in Cambodia
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
ENERGY POLICY DEVELOPMENTS EE & RE OPPORTUNITIES U.S. Business Mission 2010 June 15 – 17, 2010 Chisinau, Republic of Moldova.
1 Asian Regional Workshop on “Capacity Development for the Clean Development Mechanism” October 2005 AIT, Bangkok, Thailand Institutional Building:
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Energy Agency of the Republic of Serbia
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Missionary Electrification in the Philippines
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
PUBLIC-PRIVATE PARTNERSHIP FOR CLEAN AIR CHINA GAS HOLDINGS LIMITED August 2013 Eric Leung Wing Cheong Deputy Managing Director Chief Financial Officer.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Financing Considerations for Renewables and Energy Efficiency Projects By Guido Alfredo A Delgado August 28, 2006 FUTURE ENERGY SCENARIOS TOWARD SUSTAINABLE.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
What is it ? is a government service or private business venture which is funded and operated through a partnership of government and one or more private.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Seethapathy Chander Asian Development Bank Beijing, 25 November 2014 Disclaimer: The views expressed in this document are those of the author, and do not.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Contracts Management Governance Mona El-Chami, Senior Financial Management Specialist World Bank November 2013 Tripoli, Libya.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
1 The Tipping Point macro forces are converging to create a revolutionary “Tipping Point” within 5 years change will be fast –
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
ERRA 4th Annual Conference May 19, Budapest, Hungary. Latvia Country Update UPDATE ON REGULATION Ainars Čunčulis Head of Energy Department Public.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Electricity & Regulatory Overview of Korea
Damitha Kumarasinghe Director General
GEORGIAN ELECTRICITY MARKET OPERATOR
WATER REGULATORY AUTHORITY
Long-term Capacity Market
Public-Private Partnership for Clean Air Municipal Natural Gas Distribution Infrastructure Development Projects Hisaka Kimura Principal Investment Specialist.
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Financing PPP Projects
Presentation transcript:

Lessons Drawing from Evaluations Relating to PPPs IEG and DAC Network Private Sector Evaluations Workshop Evaluation Support to Private Sector Development 18 June 2013 • OECD Conference Center Paris Lessons Drawing from Evaluations Relating to PPPs Lauren Hauck Senior Evaluations Specialist Independent Evaluation Department Asian Development Bank The views expressed here are those of the author and do not necessarily reflect the views or policies of the Asian Development Bank or its Board of Governors or the governments they represent.

Successful PPPs Require Situation Analysis Public and Private Sector Engagement Clearly Documented Agreements SUCCESS is about the result for the intended project beneficiaries Outline: Events and disasters in Asia Climate and Disaster Trends Worldwide Increasing Incidence/ Severity Temperature and Precipitation anomalies 2012 significant climate /weather events Increasing Risks for Asia Disaster-risk reduction and management Mitigation and Adaptation Shifting to low-carbon path Reverse increasing trend Effective DRR management Role of development banks: ADB

Case Study: (Cambodia) Power Transmission Lines Co., Ltd. (CPTL) Photo credit: L. Hauck 2013

Situation Analysis: 2006 18% of total households in Cambodia have access to electricity 95% of electric power is from diesel power plant, isolated systems, not interconnected Electricity prices are highest in the region Power losses average 32% in rural areas GOAL: start construction of the skeleton transmission system and finally to expand this system to cover the whole country with a sustainable supply at lower prices and reduced rate of losses Source: EAC, Report on Power Sector of the Kingdom of Cambodia For The Year 2006, Phnom Penh, July 2007

Situation Analysis: 2006 Key Power Sector Agencies in Cambodia MIME: Ministry of Industry Mines and Energy (est. 1992) EDC: Electricité du Cambodge (became autonomous state utility 1996) EAC: Electricity Authority of Cambodia (est. 2001 as independent sector regulator) PPP ENVIRONMENT: Clearly defined roles and goals, limited experience and resources, private sector resources required to meet stated goals

Situation Analysis: 2006 PPA signed by governments of Thailand and Cambodia to supply Banteay Meanchey, Battambang and Siem Reap through 115 kV transmission system EDC: Implementor for Cambodia CPTL: 115kV transmission line and 115/22kV sub-stations under construction CPTL is the first privately-owned power transmission line in Cambodia Source: EAC, Report on Power Sector For the Year 2006

Map of Line Key Features 221 kilometer single circuit 115 kV transmission line 3x 115 kV/22 kV substations Banteay Meanchey Siem Reap Battambang 1x 115 kV/22kV substation Source: EAC, Report on Power Sector For The Year 2006 The boundaries, colors, denominations, and any other information shown on this map do not imply, on the part of the Asian Development Bank, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries, colors, denominations, or information.

Public and Private Sector EAC: issues licenses, sets operating standards, approves tariffs, offers support to licensees, monitors and reports results EDC: generating, transmitting, distributing electricity in compliance with license throughout the Kingdom of Cambodia CPTL: build-own-operate-transfer transmission line and substation to provide continuous power to northwest provinces ALL THREE entities must perform for PPP to 1) connect power to the end user; 2) deliver tariff rates and quality; 3) deliver scheduled payments Source: EAC Report on Power Sector For The Year 2006; EDC Annual Report 2010

Licensee Illustration Source: EAC Website, updated by EAC for Year 2011. The boundaries, colors, denominations, and any other information shown on this map do not imply, on the part of the Asian Development Bank, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries, colors, denominations, or information.

GOAL: Reduce Losses Source: EAC, Report on Power Sector For The Year 2006; EAC, Report on Power Sector For The Year 2011

GOAL: Reduce Prices - Prices shown for smallest- volume customers 2006 2011 - Prices shown for smallest- volume customers - Approximately Rls4000/US$1 Source: EAC, Report on Power Sector For The Year 2006; EAC, Report on Power Sector For The Year 2011

GOAL: Increase Coverage Coverage also includes service levels: intermittent supply has become nearly continuous while serving more customers Source: EAC, Report On Power Sector For The Year 2006; EAC, Report On Power Sector For The Year 2011

Above: Local Market; Below: ‘Old Market’ Photo Credit: L. Hauck, 2013

Interviews with End-Users General public quite well-informed about the electricity supply. ‘It comes from Thailand;’ and all were able to state the rates paid per kWh ‘Electricity helps business to grow. [If it is] hot, dark, nobody come[s] in.’ The Grid ‘saves some money. It is cheaper than fuel for generation. Also quieter.’ Outages now are often scheduled; ‘they announce it by radio’ and ‘usually only 1-4 hours at a time.’ Source: L Hauck, Site Visit interviews, March 2013

Lessons From PPP Case Study Situation and Risks Must be Understood by all parties Clear Rationale for PPP Needed Project has to be Part of Long Term Sector Development Plans Clear Contracts and Deliverables Required Appropriate Sharing of Tasks and Risks Among Parties Required Long-term commitment to the PPP is Required

Conclusion SUCCESS includes capacity building for the public sector, sustainable operations for the public and private sector, and quality services for the end-user PPPs require many elements to align and the entire program of agencies and activities must be considered

Follow Us Thank You! evaluation@adb.org www.adb.org/evaluation https://www.facebook.com/adbevaluation evaluation@adb.org www.adb.org/evaluation https://twitter.com/adbevaluation http://www.youtube.com/evaluationatadb http://www.scribd.com/adbevaluation/ http://www.soundcloud.com/adbevaluation/ Follow Us