NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
NAESB Coordinate Interchange
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
NAESB Coordinate Interchange Standard, Version 1 / 0
Operating Reserves --- Again A Discussion Primer
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Load Responsibility in the NWPP Footprint
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
WECC Interchange Authority Michelle Mizumori Joint Guidance Committee May 5-6, 2009.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Business Practices Subcommittee
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Pseudo-tie business procedure
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Enhanced Curtailment Calculator (ECC)
Request for Information IDC Granularity Option 3/3A
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
North America Energy Standards Board
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Pseudo-tie business procedure
Presentation transcript:

NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 2 Objectives ● History of EI Congestion Management ● Overview of IDC functionality ● Overview of NERC TLR Procedure

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 3 Congestion- What is it? ● A Few Power System Operator Answers: ● “Overloading the Transmission System” ● “Lines are on “Fire” ● “Too Much Generation for the Load” ● “Too Many MWs on the Lines ● for the given Topology”

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 4 Congestion Management ● Basic Methods Available  Re-Dispatch  Moving generation to change the flow of energy on the transmission system  Reconfiguration  Changing the topology of the transmission system to create the desired system flow

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 5 Transmission Flow - MWs Maximum Output = 500 MW Generator A Line Limit = 400 MW Output = 350 MWLoad = 400 MW Interchange Transactions (E-Tags) Market Flow for MISO and PJM Parallel Flow Caused by the Tags and GN to Ld Generator to Load MWs for BA(s) ( Not in MISO or PJM)

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 6 History – NERC Congestion Mngt ● Prior to NERC Regional Congestion Management:  Localized Congestion Management Procedures used to mitigate the overloading of lines  Minimal number of operating agreements between NERC Reliability Regions  No visibility of Parallel Flows caused by all the MW transactions and local load serving taking place on the Eastern Interconnect

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 7 History – NERC Congestion Mngt ● Visibility of Parallel Flows was increased with implementation of Electronic Tagging of MW transfers from on balancing area to another. ● Implementation of E-tagging and NERC Policy 3 ● In conjunction with this effort was the NERC Regional Congestion Management proof of concept

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 8 History – NERC Congestion Mngt ● Idea was that Congestion Management should be done on a larger regional basis due to the interconnection characteristics and parallel flows present on the system ● Assigning responsibility to those entities that were causing parallel flows was necessary to maintain reliability and equity during loading events

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 9 History – NERC Congestion Mngt ● Transmission Loading Relief Procedure (TLR)  NERC Policy 9 and associated Appendices ● Procedure defines several levels of transmission loading and mechanisms to remove MWs from the system.  Goal is to maintain reliability while removing MWs from the system in an equitable manner

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 10 History – NERC Congestion Mngt ● Transmission Loading Relief (TLR)  Implemented in 1999  Interchange Distribution Calculator (IDC) created  Adopted and used heavily by the majority of the Eastern Interconnect  Created Visibility of Eastern Interconnect MW Impacts due to Industry day to day business  Provided a useful analysis tool for Control Areas and Reliability Entities for Emergency and Non Emergency situations

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 11 Interchange Distribution Calculator ● Basic Functionality  Impact Calculation of MW Transfers  Generation to Balancing Area Load  Scheduled Transfers from one Balancing Area to another  Define Responsibility For Loading events  Who’s MWs are on the transmission line(s) of interest  How Much Relief is Required? – Operator Input  Prescription for achieving relief using TLR Process Rules

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 12 Interchange Distribution Calculator ● Basic Functionality (Continued)  Communications  Transmit Responsibilities and Relief Prescriptions to affected parties  Accept and display feedback  Allow Visibility and Transparency into the impact of potential MW transfers and actual taking place

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 13 IDC System Flow Diagram IDC Software Flowgate Definition Model of System ETAG Transactions Current Outages Users: Reliability Authorities and Balancing Areas Market Flow from MISO/PJM Request for Relief Prescription for relief

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 14 Transmission Loading Relief Summary of TLR Levels 1-Warning 2-Hold 3A-Reallocate Non-Firm 3B- Curtail Non-Firm/Halt Non-Firm Starting/Inc 4-Reconfigure 5A-Reallocate Firm 5B-Curtail Firm 6-Emergency 0-TLR End

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 15 Congestion Management and Option 3 Calculating Impacts Of Visible Transfers Assigning Event Responsibility Defining Appropriate Relief Prescription Option 3: Addresses New Method To assign Responsibility For loading events Option 3: Addresses other Alternatives to Reliably and Economically get MWs off The system.

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL 16 Questions ?