6 August 2009 Buffalo District Planning Conference Flood Plain Management 2050.

Slides:



Advertisements
Similar presentations
The Role of Levees in the National Flood Risk Management Program Pete Rabbon June 19, 2008 Hazards Caucus Alliance.
Advertisements

Slide1 Managing Flood Risk U.S. Army Corps of Engineers Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 14 July 2009 Presentation.
Flood Risk Management Pete Rabbon Association of State
Rebuilding in flood hazard areas. Impact of flood Area directly impacted spans 55,000 square kilometres Evacuations of almost 100,000 people 10,000 homes.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
> > > > Association of State Floodplain Managers.
Update Training Meeting
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
Flood Avoidance and Mitigation
1 Preparing Washington for a Changing Climate An Integrated Climate Change Response Strategy Department of Ecology Hedia Adelsman, Executive Policy Advisor.
New Directions in Water Policy: Environmental Perspectives on NFIP, Floodplain Mapping and Federal Water Resource Policies David R. Conrad Sr. Water Resources.
Climate change - environmental planning challenges Mark Southgate Head of Planning and Local Government.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Implementation and Financing Strategies for Mitigation and Adaptation to Climate Change Impacts on Coastal Communities and Small Island Developing States.
> $20 Billion 1993 > $100 Billion 2005 > $15 Billion 2008.
Floodplain Management 2050 The 2 nd Gilbert F. White Flood Policy Forum Project Foresight Workshop September 18, 2008 Washington DC Doug Plasencia, P.E.,
Gilbert F. White National Flood Policy Forum Reducing Flood Losses: Is the 1% chance flood standard sufficient? Lawrence W. Olinger, P.E., Dewberry Doug.
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management Approaches As Being Practiced in Japan, Netherlands, United Kingdom, and United States.
Climate Change Impacts and Adaptation: A View from Canada Scotland and Climate Change Getting it Right: International Perspectives on climate change and.
Community Resilience: It Takes A Village Civil Society Leadership Symposium December 8, 2009 Margaret A. Davidson NOAA’s Coastal Services Center.
N AVIGATING THE T URN : F LOOD R ISK A SSOCIATED WITH L EVEES Sam Riley Medlock, J.D., CFM Association of State Floodplain Managers May 2011.
Chatham County’s Current and Future “Win-Win” Strategies Chatham County Roadmap to Adapting to Coastal Risks Workshop Savannah Civic Center Savannah, Ga.
1 Floodplain Management 2050 Are Gilbert’s Adjustment Factors Sufficient? Larry A. Larson, P.E. CFM Association of State Floodplain Managers.
Climate Change Adaptation : Coastal community Responds… Ravadee Prasertcharoensuk Sustainable Development Foundation (SDF)
Sept. 23 NWC Boston Yes We Can! (We already have in Texas)
Presented by XXXXXXXXXXXXXXXXXXXX, CFM ASFPM Foundation The ASFPM Foundation Mission and Goals Activities Gilbert White Policy Forum.
Navigating the Turn – Flood Risk, Levees, and Insurance Doug Bellomo May 2011 FEMA | Federal Insurance and Mitigation Administration.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
NYS Department of Environmental Conservation Climate Change Adaptation Challenges: Maintaining Ecosystem Services in Shoreline Management.
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting October 2005 HILLSBOROUGH COUNTY FLOOD MAP MODERNIZATION V
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
So Now What Do We Do? Planning for Climate Change Climate science in the public interest Lara Whitely Binder Climate Impacts Group Center for Science in.
Municipality of Lezhe MayorViktor TUSHAJ Area: 6.2 km2 Number of citizens in the municipality: Climate: Mediterranean type Road Network: Today the.
The Gulf Coast Post Katrina: Business As Usual? Remarks by Leslie Carothers, President Environmental Law Institute Ecosystems, Infrastructure and the Environment.
The Status of NFIP Reform and Floodplain Mapping Mayors’ Water Summit December 8, 2010.
August 2013 Coastal Incentive Grant Program Cycle 17 Highlights Planning for Cycle 18 Coastal Advisory Council Annual Meeting July 31, 2014 Georgia Department.
1 An Ocean Blueprint for the 21st Century. 2 The U.S. Commission on Ocean Policy 16-member, independent, bi- partisan group 26 scientific advisors 16.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
The World Bank’s Role in Disaster Mitigation Financing the Risks of Natural Disasters June 3, 2003 Alcira Kreimer Manager, Disaster Management Facility.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in Antigua and Barbuda Funded by a special appropriation by the U.S. Congress to countries.
Developing Resiliency Along the Coasts: Experiences of the Coastal States Kristen M. Fletcher Coastal States Organization
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
Presented by XXXXXXXXXXXXXXXXXXXX, CFM ASFPM Foundation The ASFPM Foundation Mission and Goals Activities Gilbert White Policy Forum.
Catharine Cyr Ransom Principal The Accord Group. Stafford Act Structured approach to disasters Partnership between local, state, Federal governments Authority.
A LTERNATIVES A NALYSES FOR F LOOD M ITIGATION O PTIONS 2012 Flood Risk Management and Silver Jackets Workshop Chad Berginnis CFM, ASFPM Executive Director.
ASFPM Conference – May Shifting Our Focus from Maps to Risk William L. Coulbourne, P.E. Applied Technology Council (ATC)
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Federal Interagency Floodplain Management Task Force.
Draft Recommendations from the NH Coastal Risks and Hazards Commission Sherry Godlewski Department of Environmental Services Coastal Adaptation Workgroup.
December 16 th, 2009 Presented by Jennifer DiLorenzo, M.S., CFM Sustainable Coastal Community Liaison Developed in Cooperation with the ASFPM 1 Floodplain.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Water and Wastewater Infrastructure Project Financing 1.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
Illustrating NOAA’s Geospatial Role in Resilient Coastal Zones Joseph Klimavicz, NOAA CIO and Director of High Performance Computing and Communications.
1 © 2007 NatCatSERVICE, Geo Risks Research, Munich Re Direct economic losses [mld. US$] economic losses (in values of 2006) insured losses (in values of.
Integrating Wetlands and Watershed Management: Lessons from the U.S.
Continuing Authorities Program
Flood Risk and Climate Adaptation:
MANAGING YOUR FLOOD RISK All stakeholders contribute to risk reduction
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Responding to Changing Climate Washington State Department of Ecology
Presentation transcript:

6 August 2009 Buffalo District Planning Conference Flood Plain Management 2050

Gilbert F. White

ASFPM Foundation Forums The First Assembly of the Forum, September 2004, "Is The 1% Chance Flood Standard Sufficient?" The Second Assembly, November 2007, "Floodplain Management 2050"

In White's 1942 dissertation - He iterated eight ways for humans to adjust to flooding: 1. Elevation 2. Flood Abatement (watershed management 3. Flood Protection (levees, channels, etc.) 4. Emergency Measures 5. Structural Alterations (floodproofing, codes) 6. Land use (zoning) 7. Relief (public or private) 8. Insurance (indemnification)

The Second Gilbert F. White National Flood Policy Forum Theme: Floodplain Management 2050 Held at George Washington University, Washington, D.C., December 6-7, 2007 Attended by 92 invited nationally and internationally known experts in resource management; engineering; environmental sciences; planning; risk analysis; the law; building and construction; emergency management; finance; communication; transportation; and policy analysis

Drivers of Change at Work Today That Affect Floodplain Management Demographic Drivers Exploding population in the United States (fastest-growing country on the planet except for India and Pakistan); up to 460 million by 2050 People are moving into high-risk areas, such as along the coasts We will see more intense development of all types to meet the needs and demands of our largest population In 2030, there will be billion square feet of new development in the United States, about 46% more than existed in 2000.

Drivers of Change at Work Today That Affect Floodplain Management Climate Change Climate is changing, bringing increased flood risk - more highly variable weather, stronger storms, and sea level rise in many places in the United States Environmental Degradation The accumulated impacts of decades of wasteful land use and mining of water-related resources is tipping the balance against environmental equilibrium

Drivers of Change at Work Today That Affect Floodplain Management Shifts in Governance People expect governments at all levels to do more, yet they shrink from personal responsibility Governments have more to do, with less money "The federal budget of the future could be almost entirely consumed by entitlements and payment on the national debt"

Drivers of Change at Work Today That Affect Floodplain Management Other Drivers We are reaching the end of the design life of much of our national infrastructure - roads, bridges, stormwater systems, dams, levees, water facilities Science and technology are tending to outstrip the ability of the public and policy makers to understand and make appropriate decisions

Where Will We Be in 2050 If Business-As-Usual Prevails? Flood losses will be horrific Ecosystem degradation will worsen All hope of sustainable communities will be lost Quality of life will be diminished

Where We Could Be in 2050 We could see land and water as precious resources, so that the natural and beneficial functions, of floodplains, wetlands, and coastal area are protected Natural mitigation of flooding could take place continually and naturally All new development could be designed and built to have no adverse impact on flood levels, sedimentation, erosion, riparian or coastal habitat, or other community-designated values The market could strongly favor sustainable development, so that floodprone construction rarely occurs

ACTION GUIDELINES

Avoidance of floodprone and/or ecologically sensitive areas should be axiomatic. Move communities or portions thereof that are in high flood risk. No adverse impacts. Move critical facilities out of flood plains. In all future projects, long term objectives must be an integral component. Any short term objections must support the long term objectives. Preserve and restore NBF. 1. Make Room for Rivers, Oceans, and Adjacent Loads

Reform all Federal programs that fund, subsidize, or promote development or redevelopment in flood plains. Federal agencies should adhere closely to E.O and Full actuarial insurance rates that are fully commensurate with the actual risk should be implemented. Some areas are too hazardous to insure. 2. Reverse Perverse Incentives in Government Programs

National priority to reclaim lost riparian and coastal resources Increase recognition for NBF. No building zones in high hazard areas in coastal and riverine flood plain. 3. Restore and Enhance the Natural, Beneficial Functions of Riverine and Coastal Areas.

A National Flood Risk Management Policy is needed to provide consistent direction across all programs dealing with flood mitigation and flood recovery. Congressional "bail out" funding to provide recovery and rebuild to those that did not have flood insurance or who live in or have property in flood plains should end. Consider changing the water resources Federal interest focus from economic development to sustainability 4. Generate a Renaissance in Water Resources Governance

Focus on nonstructural alternatives first rather than today's common practice of structural alternatives first. The 100-year standard is no longer appropriate. 500-year minimum standard for urban areas. No more 100-year levees Consider flood plain regulation and flood insurance in areas "protected" by levees. 4. Generate a Renaissance in Water Resources Governance

A thorough, nationwide examination of water sources related risk is critical. All identification of flood risks and resources should be based on future conditions. Flood risk maps must be current and accurate Areas "protected" by flood risk reduction measures must have residual risk fully conveyed. 5. Identify Risks and Resources and Communicate at Public and Individual Levels

Flood risk communications must be a highest priority in terms of funding and done on an annual basis at a minimum. It must be done at all levels. Capitalize on advances in technology to communicate risk and the fragility of water resources. Need a nationwide inventory of flood prone structures and risk. 5. Identify Risks and Resources and Communicate at Public and Individual Levels (cont.)

Mandatory all hazards insurance for all insurable properties based on full actuarial risk. Promote individual and community responsibility to reduce risk. Incentives need to be provided to communities in the form of reduced project cost share if those communities are proactive in reducing flood risk beyond the national standard. Responsibility for the flood risk and damage for flood plain development rests with the developer, the individual, and the land use decision making authority. 6. Assume Personal and Public Responsibility

Year 2050 What Will The Headlines Be?

Great Flood of Horrific damage and deaths Huge amount of funding needed to recover but none available. Business As Usual Scenario

Great Flood of No damage, no deaths Disaster fund remains untapped Achieving Minimum Flood Risk in 2050

Nonstructural Measures Are a Vital Key

U.S. Army Corps of Engineers National Nonstructural Flood Proofing Committee U.S. Army Corps of Engineers National Nonstructural Flood Proofing Committee