Texas Regional Entity Compliance Report TAC July 9, 2009.

Slides:



Advertisements
Similar presentations
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Advertisements

Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
NERC Functional Model AND HOW IT RELATES TO THE ERCOT REGION
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
ERCOT’S COMPLIANCE ASSESSMENT and ENFORCEMENT PROGRAM March 23, 2005.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Texas Regional Entity Compliance Report Board of Directors June 15, 2009.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
RTWG Report to TAC August 5, 2010 Howard Daniels.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
April 23 rd OWG UFLS Survey & Power Factor Review.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Status Report for Critical Infrastructure Protection Advisory Group
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
1 Texas Regional Entity Compliance Update July 2007.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Texas Regional Entity Report Mark Henry June 6, 2008.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
1 TAC Report to the ERCOT Board February 16, 2005.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting February 2004.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Texas Regional Entity Compliance Report Larry Grimm September 4, 2008 TRE TAC September 4, 2008.
Protocol Revision Subcommittee
Compliance Report to ERCOT BOD December 2006
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
ERCOT Technical Advisory Committee June 2, 2005
Workshop Session 1: Overview
Workshop Session 1: Overview
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Presentation transcript:

Texas Regional Entity Compliance Report TAC July 9, 2009

Page 2 of 16 Overview  NERC Organization Registration update  Load Serving Entity (LSE) Registration JRO update  NERC Standards Self-Certification Schedule  NERC Audit & Enforcement Highlights  Critical Infrastructure Protection - Spot Check  Critical Performance Metrics and Criteria for the ERCOT Nodal Market  Zonal PRR and OGRR progress TEXAS RE REPORT JULY 9, 2009

Page 3 of 16 NERC Organization Registration Update ●Texas RE and other ERCOT Stakeholders submitted comments on the proposed changes to NERC Rules of Procedures (section 500); These changes can modify:  The rules dealing with organization registration and certification  Appendix 5, the Organization Registration and Certification Manual ●Comments to changes are posted on the NERC website: ●Texas RE also provided comments on NERC’s technical feasibility exemptions (TFEs) procedure (CIP) TEXAS RE REPORT JULY 9, 2009

Page 4 of 16 NERC LSE Registration Update ●Stakeholders from the Load Serving Entity Registration Working Group (LSERWG) made additional comments for Texas RE staff to incorporate into the NERC LSE JRO Matrix and proposed Agreement ●Texas RE met with Transmission Owners (TOs) on July 1 st to further streamline the proposed agreement and matrix content ●Texas RE made changes to the proposed agreement and matrix content, based on stakeholders comments and sent out for final review TEXAS RE REPORT JULY 9, 2009

Page 5 of 16 NERC Standards Self-Certification Schedule Self-Certification Activity by NERC FunctionStart Due Critical Infrastructure Protection (CIP) Standards, July 1 August 3 CIP for Generator Owner (GO), Generator Operator (GOP) and Transmission Owner (TO) Distribution Provider (DP), Purchasing-Selling Entity (PSE), August 3 Sept 3 Transmission Planner (TP) and TO (non CIP Standards) ●All submissions will be via the Texas RE Portal ●100% of NERC GO/GOP self-certification submissions for non CIP Standards in June, were received by Texas RE ●All GO, GOP and TO registrants are required to complete the CIP Self Certification even if they are being audited this year. TEXAS RE REPORT JULY 9, 2009

Page 6 of 16 NERC Audit & Enforcement Highlights ●Seven (7) NERC standards Audits; One (1) Protocol Audit conducted in June, as scheduled ●NERC observers attended five (5) NERC standards Audits and provided favorable comments on the conduct of the audit team ●Texas RE and the other seven (7) regions are continuing efforts to coordinate compliance activities for multi-region registered entities, with particular focus currently on PSEs (Purchasing Selling Entities) ●Focus in June has been to prepare for spot checks of NERC CIP standards ●Texas RE will conduct one spot-check in July for thirteen (13) requirements TEXAS RE REPORT JULY 9, 2009

Page 7 of 16 Public Notice of Penalties (NOP) Filed at FERC ●Violations and Settlements that have reached FERC are published at:  TEXAS RE REPORT JULY 9, 2009

Page 8 of 16 Critical Infrastructure Protection - Spot Check ●First spot check of CIP-002, Critical Cyber Asset identification was initiated in June, 2009 ●One market participant, who has not reached auditably compliant stage, volunteered to provide their methodology for review as part of this spot check ●This effort will enable Texas RE to better understand the work load associated with CIP-002 standard auditing and enforcement ●Initial review of the methodology found it to be very good ●Concern exists regarding how methodologies will be coordinated between Registered Entities TEXAS RE REPORT JULY 9, 2009

Page 9 of 16 Critical Performance Metric and Criteria for the ERCOT Nodal Market ●Preliminary measures and criteria were published on June 3 rd at (under Hot Topic Briefs – ERCOT Nodal Metrics Project 37052) ●Workshops were conducted to collect stakeholder comments ●Workshop was held on: Friday, June 12 th at the PUCT, and was well attended ●Second workshop was held on July 13 th at the Met Center, room 206 ●A new NPRR was submitted on July 2 nd, jointly authored by the PUCT, ERCOT ISO, and Texas RE to enhance existing nodal protocols with additional language, metrics, and pass/fail criteria TEXAS RE REPORT JULY 9, 2009

Page 10 of 16 ERCOT Protocol and Operating Guides Violation Monitoring ●Monthly monitored protocols using reports supported by ERCOT  Resource Plan Metrics, SCPS2 ●All other protocols and operating guides rely on events or incidents to trigger reporting by ERCOT ●Violations may be uncovered alternatively by Texas RE via compliance audits (3 year and 6 year cycles) TEXAS RE REPORT JULY 9, 2009

Page 11 of 16 ERCOT Protocol and Operating Guide Violation Policy Change ●Recommend that all Protocols and Operating Guides include:  Definitions of metrics to be monitored by Texas RE  Definition of explicit pass/fail criteria  Monitoring methodology to be used  Responsible entity for developing and maintaining any reporting applications  Availability of resources to develop system applications for monitoring and identifying possible violations Texas RE Report July 9, 2009

Page 12 of 16 PRR – Removing Access to Restricted Systems and Facilities ●Texas RE authored a PRR covering the requirement for market participants to manage access to restricted systems and facilities (per Board direction) ●Reporting criterion was included requiring market participants to adequately restrict access and report failures to Texas RE ●Flexibility is provided to allow market participants to address the need for security within their own framework ●Requested as urgent (per Board direction) Texas RE Report July 9, 2009

Page 13 of 16 PRR 787 – SCPS2 Metric & Outage Definitions PRR 787: Defines enforcement methodology and adds exemptions to the SCPS2 scoring calculation ●PRS approved on June 18 ●Revised CEO Impact Analysis reflects no change to Outage Scheduler Budget request: ●Texas RE will require an additional 0.75 FTE to monitor and process the new exemptions ●This estimate is based on:  The recent exemptions requests from stakeholders, 300 to 400 exemptions per stakeholder (approximately 2 per month)  Texas RE is not able to independently verify the new exemptions  These exemptions could impact ERCOT settlements process due to Texas RE’s time consuming manual review and approval process of exemptions Texas RE Report July 9, 2009

Page 14 of 16 PRR 811 – Real Time Production Potential PRR 811: Establishes a requirement for Wind Generation Resources to telemeter a real time signal indicating the real time production potential which will be a function of wind and turbine availability ●Was addressed at July 7 QMWG meeting to address data requirements and to prepare comments for PRS ●Texas RE supports PRR 811 with modification to support compliance Concerns: A metric and criteria that define passing and failing are required as well as the method for monitoring the metric (e.g. exception report, ISO complaint) ●If approved, Texas RE will coordinate with ERCOT ISO to develop Spot- Check performance query capability Texas RE Report July 9, 2009

Page 15 of 16 PRR 812 – Wind Generator Forecasting for Scheduling Metric PRR 812: This PRR adds a requirement for wind-powered generation resources to update resource plans and schedules every hour using the ERCOT provided most likely short-term wind power forecast as the standard for accuracy ●PRS approved on June 18 ●Texas RE supports this protocol with modification to support compliance Concerns: A metric and criteria that define passing and failing are required as well as the method for monitoring the metric (e.g. exception report, ISO complaint) ●Texas RE is coordinating with ERCOT ISO to develop Texas RE’s capability to conduct Spot Check queries of Resource Plan performances Texas RE Report July 9, 2009

Page 16 of 16 OGRR Special Protection System (SPS) Operations Under No Contingency OGRR 224: Places an obligation on Resource owners who have an SPS to monitor the flows monitored by the SPS in the base case and reduce output as needed before the arming point of the SPS is Reached ●Texas RE supports the OGRR as written Texas RE Report July 9, 2009