Federal & State Regulatory Issues Elizabeth W. Whittle Nixon Peabody LLP 401 9th Street, N.W. Washington, D.C. 20004 (202) 585-8338

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

SOLAR ENERGY TAX CREDIT BASICS
Condo Conversions Under PLR The PLR Was Published On January 19, 2007 Each tenant, granted a right of first refusal, can buy that unit, along.
1 FINANCING POWER PLANTS FEDERAL TAX ISSUES MITCH RAPAPORT NIXON PEABODY LLP th Street, N.W. #900 Washington, D.C (202) January 19,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
2008 Real Estate Update: Affordable Housing in Todays Market Ritz Carlton, San Juan Hotel, Spa & Casino 6961 Avenue of the Governors Isla Verde Carolina,
The Midwest ISO from a Transmission Owner Perspective.
June 22, 2005 NAESB Board of Directors Meeting, San Antonio, Texas 1 North American Energy Standards Board Meeting of the Members NAESB Board of Directors.
E-Tariff - The Problem with Joint and Shared Filings Presented by National Grid NAESB E-Tariff Conference Colorado Springs January 23-25, 2008.
Reliability in British Columbia
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
1 Maryland PSC Supplier Licensing Information Dan Norfolk Michael Lee, Director Integrated Resource.
March, 2000 Order 2000 for SERC 1 Powersmiths Intl FERC Order 2000 Summary March, 2000.
FERCs Recent Orders on Market Power in Wholesale Electric Markets Stephen P. Rodgers, Director, Division of Tariffs and Rates South Office of Markets,
Wholesale Restructuring 1.PURPA 2.Market based wholesale rates 3.Incentive rates 4.Energy Policy Act of 1992 Clarified power to order third party wheeling.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
1 PENDING FERC ISSUES RELATING TO THE ALASKA NATURAL GAS TRANSPORTATION PROJECT Presentation by Karol Lyn Newman Morgan, Lewis & Bockius, LLP November.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
A Federal View of the Interface of Natural Gas and Electricity Prices Moving Toward Greater Reliance on Wholesale Energy Markets November 30, 2006 Crowne.
PSC Update: Wind Energy Issues James W. Ellars, P.E. Chief Utilities Manager, Engineering Division Public Service Commission of West Virginia.
Wholesale Markets and How Efficiency Has Financial Value Dan Griffiths KEEA Energy Efficiency Conference September 21, 2010.
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
1 FERC Presentation at NARUC Forum on Resource Procurement Chairman Pat Wood III Federal Energy Regulatory Commission May 16, 2005.
Federal Energy Regulatory Commission Update Janice Garrison Nicholas Chief Accountant and Director, Division of Financial Regulation Federal Energy Regulatory.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Water and Wastewater Certification 1 Water & Wastewater Reference Manual.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
California’s Renewable Energy Credits (REC) Market Update
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1 View of Federal Energy Legislation Sonny Popowsky Pennsylvania Consumer Advocate September 16, 2004 Indiana Energy Conference PA Office of Consumer Advocate.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
1 New Mexico State University Santa Fe Conference 2005 Steve Rodgers Office of Markets, Tariffs & Rates—South Federal Energy Regulatory Commission March.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
“FERC-LITE,” WHOLESALE REFUND AUTHORITY, AND RELATED PROVISIONS NOVEMBER 10, 2005 ROBERT R. NORDHAUS VAN NESS FELDMAN WASHINGTON, DC (202)
APPA OVERVIEW OF EPACT 2005 Transmission Provisions, Merger Review, and More Cindy Bogorad SPIEGEL & MCDIARMID 1333 New Hampshire Ave., NW Washington,
Federal Energy Regulation and Alternative Energy Introduction: The Law of Unintended Consequences By: C. Baird Brown Ballard Spahr Andrews & Ingersoll,
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
ECE 7800: Renewable Energy Systems Topic 4: Utility Deregulation Spring 2010 © Pritpal Singh, 2010.
How the Transmission System Works Really William F. Reinke.
IPP Generation and Policy An historical survey Prepared by Richard Sedano RAP.
Utility owned generator Federal Power Project Distribution System Residential users Commercial users Industrial users Municipal Utility Residential users.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
Enron Government Affairs Status Report to EWS 1 September 2001.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
presented to the Energy Practice Group
Location, Location, Location
Massachusetts Electric Restructuring Roundtable
Solar Energy Commercialization Utility Scale Business:
Presentation transcript:

Federal & State Regulatory Issues Elizabeth W. Whittle Nixon Peabody LLP 401 9th Street, N.W. Washington, D.C (202) July 25, 2007

2 2 As a wholesale supplier of power, a wind developer will be subject to regulation under the Federal Power Act (FPA). The Federal Energy Regulatory Commission (FERC) administers the FPA. FERC has jurisdiction over both the transmission and the sale of this power. Siting and related matters are subject to the jurisdiction of the states. Federal and State Regulatory Issues

3 3 Transmission service is governed by utility tariffs. In many regions, transmission service is provided by an Independent System operator/regional transmission organization (RTO/ISO). RTO/ISOs do not own the transmission assets, but have operational control over them. Open-access, non-discriminatory transmission service is provided pursuant to a Tariff on file and approved by FERC. Transmission Regulatory Scheme

4 4 Tariffs govern: Interconnection Transmission Ancillary service Rates Dispute resolution Transmission Regulatory Scheme

5 5 Interconnection The interconnection process has been standardized. Each Transmission Owner or RTO/ISO has tariff provisions governing the process from the filing of an interconnection request to the execution of the Interconnection Agreement. While the process is standardized, there are limited regional differences that are permitted by FERC. Milstones must be met to remain in the interconnection queue. The process includes a number of steps, many of which must be followed by deposits. Developer must pay for the costs of all studies. –Interconnection Request - $10,000 –System Reliability Study - $50,000 –Facility Study - $100,000 –Interconnection Agreement - $250,000 if cant show evidence of site control

6 6 Sale of Power at Market-Based Rates FERC authorization is required to sell power at market- based rates – even if power is sold only into the RTO/ISO market. In order to obtain authority to engage in sales for resale at market-based rates the Developer must show that: –It lacks market power over generation –It lacks market power over transmission Cannot erect other barriers to entry; and Neither it nor its affiliates engage in reciprocal deals or otherwise abuse an affiliate relationship.

7 7 Sale of Power at Market-Based Rates (Contd) On June 21, 2007 FERC issued Order No. 697 (119 FERC ¶ 61,295), which revises some of FERCs market-based rates rules. The Final Rule is 643 pages long! FERC examines vertical and horizontal market power.

8 8 Sale of Power at Market-Based Rates (Contd) Horizontal Market Power: If an entity passes the market screens established by the FERC, the entity is presumed to lack market power. If an entity fails the market screens, the entity is presumed to possess market power and must rebut the presumption by performing the delivered price test. The geographic market is usually either the sellers balancing authority area or the RTO/ISO footprint.

9 9 Sale of Power at Market-Based Rates (Contd) Vertical Market Power: FERC assumes that no market power exists if there is an open access transmission tariff on file. FERC can revoke market-based rates and impose cost-based rates on the entity and, in some cases, the entitys affiliates.

10 Ongoing Obligations Market-Based Rates Once a seller obtains market based rate authority, there are reporting obligations. –Each quarter, the seller must report to FERC electronically details of its activities, including Mwh sold, aggregate prices, etc. Even if there is no activity, the report must be filed.

11 Market Power Updates –Category 1 Sellers (those marketers which own or control 500MW or less and not affiliated with a public utility with a franchised service territory) do not have to file market power updates periodically. –Category 2 Sellers (those who are not Category 1) must file updates to show that they continue to qualify. FERC establishes a filing schedule for the periodic updates. –All sellers must file changes in circumstances with the FERC.

12 Qualifying Facility/Exempt Wholesale Generator Wind projects are qualifying small power production facilities. The Public Utility Regulatory Policies Act of 1978 (PURPA) required among other things the utility, if requested, to purchase all of the output (net) of QFs at the utilitys avoided cost. Also, under PURPA, the FERC was given the authority to exempt QFs from provisions of the FPA, including rate regulation under Section 205. On August 8, 2005, Congress enacted the Energy Policy Act of 2005 (EPAct) which among other things gave FERC the authority to allow the utility to escape from the mandatory purchase obligation if QF has non- discriminatory access to three markets defined in the legislation.

13 Qualifying Facility/Exempt Wholesale Generator (Contd) FERC implemented EPAct and issued Order No 688, (71 FR64342 (2006), Order on rehg, 119 FERC ¶ 61,305 (2007), which established guidelines for utilities to escape from the mandatory purchase obligation. FERC created three rebuttable presumptions. For projects with a capacity over 20MW, in Day 2 RTO/ISO markets, there is a rebuttable presumption that those markets are workably competitive. The 4 Day 2 markets are Midwest ISO, New York ISO, PJM and ISO-New England.

14 Qualifying Facility/Exempt Wholesale Generator (Contd) For projects with a capacity over 20MW, QFs located in markets where service is provided under an open access transmission tariff are presumed to have non-discriminatory access to markets in that transmission providers territory. QFs with a net capacity 20MW or less are presumed to not have non-discriminatory access to any markets.

15 Qualifying Facility/Exempt Wholesale Generator (Contd) As a result of these presumptions, many QFs with a net capacity of greater than 20MW will no longer have local utility as an involuntary purchaser of power. That doesnt mean that the utility wont voluntarily purchase the power at an agreed upon or auction-based price. If a project does not avail itself of the benefits of QF status, developers obtain Exempt Wholesale Generator (EWG) Status. EWGs are exempt from certain regulations under the Public Utility Holding Company Act of 2005.

16 Qualifying Facility/Exempt Wholesale Generator (Contd) In EPAct, the Congress repealed the Public Utility Holding Company Act of 1935, eliminating the onerous SEC-related reporting requirements that fell on public utility holding companies. While the exemption from regulations as an EWG may not seem as valuable, it is important to maintain EWG status in order to claim certain exemptions from filing, e.g., to dispose of a facility under FPA Section 203. (See FERC Order No. 669). Once EWG status is obtained, material changes in circumstances -- changes in upstream ownership, etc. must be reported to FERC.

17 State-Related Issues Many wind development requirements are under State jurisdiction. Unlike natural gas pipelines where FERC has siting jurisdiction, siting matters are left to the State. Each State has it own siting schemes. Most require an approval/certificate from the Public Utility Commission (PUC) that the project is in the public convenience and necessity. Often this review entails an environmental assessment or related environmental document and the involvement of state environmental agencies. Many environmental studies are often required - - noise, bats, birds, impacts on landowners, etc. Counties and towns also have authority under local zoning laws.

18 State-Related Issues (Contd) States may be the administrator of renewable energy credit/RPS standards. Many states also regulate the utility as a public utility, although each may have lightened regulation or a way to obtain exemptions from state commission jurisdiction. In New York, for example, developers file an application for lightened regulation.