©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska.

Slides:



Advertisements
Similar presentations
Hazard Survey Dow Fire and Explosion Index is the most popular form of hazard survey. A formal systematized approach using a ranking form (similar to an.
Advertisements

Treatment of Slaughterhouse Wastewater
©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska.
ROMANIAN AGENCY FOR HUMAN LIFE RESCUE AT SEA CONSTANŢA.
United States Coast Guard Vessel Response Plan Requirements CDR Doug Simpson Sector Ohio Valley Chief, Prevention Dept.
CASE STUDY-III BOILER TUBE FAILURE. The Incident  Boiler Make: MIURA  Date: March 26, 2010  Place: At sea  Initial Indication: Frequent water being.
Access Road Stern Bow Suggested lay down area. Looking from bow down port side of vessel to the stern Non detect, clean overburden.
Alabaster Corp. Tank Cleaning and Degassing General Process Overview.
NATURAL GAS & LNG AS ENGINE FUEL Jim Lewis, PE, PEng LNG Expertise, LLC May 21, 2014 Great Lakes Maritime Research Institute 1.
H2S H2S Awareness Introduction
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
Proposed Changes to DEQ Heating Oil Guidance. Background Present guidance developed in 2006/early 2007 became effective in March heating oil.
Earth’s Energy & Mineral Resources. Section 1: Nonrenewable Energy Resources.
Sabine Block 13: Oil Remediation. SS. W. BEAUMONT BACKGROUND – INTIAL INDICATION  OIL SHEEN OBSERVED BY HELICOPTER  PIPELINE WAS INITIAL PROBABLE CAUSE.
Steam Power Plant.
SHELL ALASKA Program Update March 2015.
USS MISSISSINEWA (AO 59) Oil Offloading Operations Ulithi Atoll, FSM February 2003.
Salvage and Marine Firefighting & CAPS/Dispersant Regulations: Vessel Response Plans for Oil 33 CFR Part 155.
Salvage and Marine Firefighting Requirements: Vessel Response Plans for Oil 33 CFR Part 155.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Module 3: PPE 3.1 Hazard Assessment Susan Harwood Grant Number SH F-23.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Japan Tsunami Marine Debris: Information and Action May 17 th, 2012 Marine Resource Committee Science Fair, Long Beach, WA Washington State Emergency Management.
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
FOSSIL FUELS AND FOSSIL ENERGY Fossil fuel is a substance that releases energy by chemical reaction. In most cases the energy release occur when the substance.
Earth’s Energy & Mineral Resources. Section 1: Nonrenewable Energy Resources.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
LOGO Feasibility Test of Applying Complex Remediation Technology for Diesel Contamination in Soil and Groundwater 2012 International Conference on Environmental.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Drain systems PAB Drain Systems Drain systems are important to allow equipment to be drained, opened, inspected and repaired If else, process fluids.
U.S. Coast Guard Ballast Water Management (BWM) Requirements LT. Eddie Lesane U.S. Coast Guard Sector Charleston September 2006.
Ch 5: Earth’s Energy and Mineral Resources
Ch 5: Earth’s Energy and Mineral Resources
IBEX 2011 Boat Fuel Systems: Boat Fuel Systems: Complying with the New Regulations and Standards Common Pitfalls of Integrating the Evaporate Emission.
United States Coast Guard OSC BRIEFING USCG SECTOR COLUMBIA RIVER 25 OCT 2012.
Oceans and Oil Spills. History of the Gulf Oil Spill Explosion kills 11 men on rig on April 22, 2010 The Entire rig sinks on April 23, 2010 A customized.
BARGE DAVY CROCKETT RESPONSE
EPA Compliant Fuel Systems IBEX Sep 28, 2010 George Bellwoar.
Spill reports: 249 Amount spilled: 1900 gals Spills by Product.
Fossil Fuels How do they give us energy? Kate Johnston 2009.
Finite Element Analysis of the Ellis Island Ferry Finite Element Analysis of the Ellis Island Ferry Li Ma and Tim Foecke, Metallurgy Division National.
Safety Talk 3 / 1 Safety Talk 3 Safe Operation of Storage Tanks: Temperature and Pressure.
Fluid Structure Interactions Research Group FSI Away Day 2012 Damage Assessment Tool for Marine Structures Adam Sobey – – Faculty of.
Drew Brandy, Senior Vice President Inmarsat Maritime Smarter Operations for the Future INMARSAT > SmartOps Copenhagen.
1. HUNTER-GATHERER SOCIETIES HAD VERY LIMITED ENERGY REQUIREMENTS. THESE WERE MET USING WOOD (A RENEWABLE RESOURCE). 2. THE INDUSTRIAL REVOLUTION CHANGED.
12 MEP Cases Juneau 14 MEP Cases Ketchikan 08 MEP Cases Sitka.
96 Spills Reported 2,195 Gallons Discharged. ATB COMMITMENT Navy Base Bangor HELENA STAR.
Natural Resources Waste Water Management. Wastewater entering the treatment plant includes items like: Wood Rocks Dead animals Wedding Rings  Unless.
Screening: Wastewater entering the treatment plant includes items like wood, rocks, and even dead animals. Unless they are removed, they could cause problems.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Barge MM-53 Update 02 Feb Hightlights (01-02 Feb.) –Discussed sampling plans with state agencies, USFWS, USCG and RP for water column and tissues.
Lecture 2: Ship structural components
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
Main Channel Columbia River Channel is filled in to an unknown level with debris & sediment to mile 18 and maybe more. The Columbia River Jetty’s have.
2014 Worst Case Discharge Exercise Huntington Beach, CA April 30 th –May 2 nd, 2014 Presented By Jill K. Lemon, USCG Contingency Planner.
Migen SpA The The Italian Company of Specialized Services for Industry Plant Migen SpA The The Italian Company of Specialized Services for Industry Plant.
The Cooling System (Reasons for)
Sector San Francisco USCG Sector San Francisco Regional Response Team 9 June 2012.
Spill Reports: 206 reports received Amount Spilled: 19,240 gals Federally Funded Projects: 8 OSLTF Projects Response Team Dispatched: 26 times.
ACTIVE SOLAR DESIGN ALTERNATIVE ENEGRY SOURCES.
Point Estero Incident CWO Ricketson
South Texas Coastal Zone Area Committee Meeting
USCG Roles & Responsibilities During a Ship Fire
Chapter 13: Environmental Impacts of Petroleum Refining Processes
Environmental Issues Mapping Field Lab
Federal On Scene Coordinator’s Report Coast Guard Sector Puget Sound Spills September 2015 – February 2016 SECTOR PUGET SOUND.
The Trouble Below where the rubber hits the reef
Unit 3: Natural Resources
Presentation transcript:

©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska

©2010 Global Diving & Salvage, Inc.

PHASE 1: Initial ROV Survey of the Vessel February 17-19, 2010 ©2010 Global Diving & Salvage, Inc.

PHASE 2: Assessment of the Vessel March 5-April 20, 2010 Evaluate condition of hull plating, location and quantity of oil, collect data for modeling and survey area for obstacles. ©2010 Global Diving & Salvage, Inc.

PHASE 2: Assessment of the Vessel Use of dimensional modeling ©2010 Global Diving & Salvage, Inc.

PHASE 2: Assessment of the Vessel Non destructive testing of hull for plating strength ©2010 Global Diving & Salvage, Inc.

PHASE 2: Assessment of the Vessel Sampling tanks and hull for confirmation of oil ©2010 Global Diving & Salvage, Inc.

PHASE 2: Assessment of the Vessel Sampling tanks and hull for confirmation of oil ©2010 Global Diving & Salvage, Inc.

PHASE 2: Assessment of the Vessel Determination of landing plates and pump locations Typically, valves are placed at the highest and lowest spot in a particular tank location, as well as at the suspected oil/water interface within the tank (after separation)

PHASE 3: Fuel Removal Operations April 20 to June 4, 2010 ©2010 Global Diving & Salvage, Inc. L/C GLACIER – Dive vessel RED CEDAR – Pumping Barge FOSS 248-P2 Oil Barge HALLE FOSS - Tug

PHASE 3: Fuel Removal Operations April 20 to June 4, 2010 ©2010 Global Diving & Salvage, Inc.

PHASE 3: Fuel Removal Operations Innovative topside pumping regime ©2010 Global Diving & Salvage, Inc. Oil is pumped from a vessel’s tank (along with seawater) into a heated portable storage tank onboard a barge. The oil is than skimmed from the top of the tank and pumped into the barge; the remaining heated seawater is pumped back down into the vessel’s tank and used to assist with continuous heating of the oil within the tank.

PHASE 3: Fuel Removal Operations Challenges ©2010 Global Diving & Salvage, Inc. Hydrogen Sulfide (H2S) - Anaerobic decay aided by bacteria produces H2S, a potentially deadly gas, which may be present in fuel tanks due to microbial interaction with the hydrocarbons - At least one of Princess Kathleen’s fuel tanks contained significant H2S which was detected by alert crewmen and air monitoring equipment on deck - Air monitoring must be continuous during pumping operations. Personnel must be trained, equipped and prepared to react to the onset of a release of H2S during pumping operations Hull Pressurization - While the steel hull of the vessel was in reasonably good condition the rivets were failing - Pressurization of the internal spaces in the tank being pumped could cause oil to be pressed around the rivets and through the hull. Excessive pressure could lead to rivet failure and a breach of the tank - Specialized pressure monitoring systems were developed to allow constant monitoring of the internal pressure and vacuum of the tank being pumped

PHASE 3: Fuel Removal Operations Challenges ©2010 Global Diving & Salvage, Inc. Port Side Wing Tanks - The vessel’s condition on the bottom was port down, which meant that the wing tanks were inaccessible unless penetration diving was conducted - The inway area to the tank tops was heavily accredited with sand and sediment, which made access difficult at times, and close to zero visibility - The cargo area above the tank tops was covered with approximately 2” of asphalt that needed to be chipped away

PHASE 3: Fuel Removal Operations Penetration to Port Side Wing Tanks ©2010 Global Diving & Salvage, Inc.

PHASE 3: Fuel Removal Operations Penetration to Port Side Wing Tanks ©2010 Global Diving & Salvage, Inc.

PHASE 3: Fuel Removal Operations Totals Heavy Fuel Oil Heavy Fuel Oil– 130,000 gal Oily Water Oily Water – 220,000 gal Solids Solids– 140 bbl Modeled Worst Case Release Expense $58,500,000 Actual Recovery Cost (November 2010) $13,947,309.95

Partners in the Response ©2010 Global Diving & Salvage, Inc. United States Coast Guard Alaska Department of Environmental Conservation Foss Maritime Southeast Alaska Lightering The Glosten Associates Resolve Marine SEAPRO