1 Power Sales from Solar Power Projects Lee M. Goodwin

Slides:



Advertisements
Similar presentations
Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Overview of Working Capital Management
ISTISNA AS MODE OF FINANCE
Copyright © 2004 by Prentice-Hall. All rights reserved. PowerPoint Slides to Accompany BUSINESS LAW E-Commerce and Digital Law International Law and Ethics.
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
General Partner Interest Sales Legal Issues Robert H. Adkins.
Baker & McKenzie International is a Swiss Verein with member law firms around the world. In accordance with the common terminology used in professional.
INTERNAL CONTROLS.
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Key Concepts and Skills
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Accounting and Financial Reporting
Managing Construction Risks
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
Attract & Retain Your Employees Build & Preserve Your Business Protect Your Family Larry Ricke and Mike Ricke are registered representatives offering securities.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Chapter Four: The Sale of Goods 1. The Sale of Goods Act 1979 in Britain: Britain The Sale of Goods Act 1979 regulates contracts in which goods are sold.
1. Parties have contractual capacity 2. Contract has legal purpose 3. Offer 4. Acceptance 5. Consideration 6. Statute of Frauds compliance.
ISTISNA’.
14. LETTERS OF CREDIT: PROCEDURES 1. LETTERS OF CREDIT I.THE NEED FOR LETTERS OF CREDIT A. USES TO THE SELLER WITH A FIRST-TIME CUSTOMER WITH A CREDIT.
Commercial Bank Operations
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
Chapter 1: Legal Ethics 1. © 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use.
Chapter Outline Hedging and Price Volatility Managing Financial Risk
1 CONTRACT RISK MANAGEMENT: Strategies and Tactics J. Scott Hommer, III Venable LLP 8010 Towers Crescent Drive, Suite 300 Vienna, Virginia (703)
1 Forms of International Business Trade International licensing of technology and intellectual property (trademarks, patents and copyrights) Foreign direct.
BUSINESS ACQUISITIONS THE ACQUISITION AGREEMENT: General Introduction to M&A Agreements AND PURCHASE PRICE ©2010 Joseph D. Lehrer.
Practical Car Ijarah.
Chapter 4 Introduction to Risk Management 4-1. Copyright © 2009 Pearson Prentice Hall. All rights reserved. 4-2 Basic Risk Management Firms convert inputs.
1 Considerations in Gas Contracts Using LNG Supply Texas Utility Lawyers Association October 13, 2005 Craig Enochs Jackson Walkter L.L.P.
The Sales Contract: Transfer of Title and Risk of Loss
VALUATION OF INVENTORIES:
FI3300 Corporation Finance Spring Semester 2010 Dr. Isabel Tkatch Assistant Professor of Finance 1.
How to commence the IT Modernization Process?
LEASING FEUI Program Studi Maksi – PPAK Manajemen Keuangan Kuliah IV RWJJ CH. 21 Sugeng Purwanto Ph.D, FRM 1.
AS -24 Rajiv K. Doshi DISCONTINUING OPERATIONS.  Level I Mandatory Wef  Listed Company  Under Listing Process  Banks & Co. Op. Banks 
Putting the Negotiation in Negotiated Payment Plans National Community Action Foundation (NCAF) Roger D. Colton Fisher, Sheehan & Colton Public Finance.
Chapter 1: Legal Ethics 1. © 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use.
Hybrid and Derivative Securities
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER16CHAPTER16 CHAPTER16CHAPTER16 Financing Project Development.
1 OUTLINE FOR CHAPTER 22 Understand –Basic needs of export/import financing –Main instruments (letter of credit, bill of exchange, and bill of lading)
NEGOTIATING INFORMATION TECHNOLOGY SERVICE AGREEMENTS TOP TIPS TO CONSIDER © 2013, WILSON VUKELICH LLP. ALL RIGHTS RESERVED. Diane L. Karnay September.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
Liabilities and Risk Sharing RA Dirk Hoffmann MBA all rights reserved Best practices – a European perspective Dirk Hoffmann, MBA, Lawyer (Germany)
Copyright 2005 Dwight Drake. All Rights Reserved. Business Planning: Closely Held Enterprises www. drake-business-planning.com 6-1 Objectives of Buy-Sell.
Power Purchase Agreements Alex Sifford Ecos Consulting Portland, Oregon
Legal and Taxation Aspects of your Small Business; I.Birt © 2007 Pearson Education Australia Legal and Taxation Aspects of Your Small Business 3 rd Edition.
Background of PPP Negotiation
FINANCIAL SERVICES… Presented by: Ruchika Sharma.
PPAs AND CONTRACTS FOR LONG-TERM RENEWABLE ENERGY CREDITS North American Power Credit Organization September 2006 Meeting Presented by: William H. Holmes,
Special Issues in M&A Transactions for Marketed Products John A. Hurvitz Covington & Burling Washington, DC (202)
Financing of Infrastructure Projects:
Richard E. Thompson II, Esq.
SCHOOL OF TELCOMMUNICATION DIFFERENT FINANCING OPTIONS Mustapha Ojo.
RPS Bidders Workshop 1 Guidance for Inputs to 2008 RPS PPAs April 11, 2008 Disclaimer: Not to be considered or construed as legal advice or counsel; in.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
Third-Party Solar Financing Options in New Hampshire 1.
RPS Bidders Workshop May 11, RPS Bidders Workshop Guidance for Inputs to PPA May 11, 2007.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Copyright © 2010 South-Western Legal Studies in Business, a part of South-Western Cengage Learning. and the Legal Environment, 10 th edition by Richard.
Introduction to Real Estate Finance
Warranties Review Questions.
Removes Some of the Regulatory Restrictions
Build Assets and Wealth
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Solar Energy Commercialization Session 11
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

1 Power Sales from Solar Power Projects Lee M. Goodwin

2 Power Sales for Solar Projects Background: Underlying philosophy of independent power Independent power is the creation of legislation –PURPA –State Initiatives Legislation still helps –ITC –RPS Legislation also creates context –Voluntary vs. Involuntary purchases –Municipal purchasers

3 Power Sales for Solar Projects Even in the absence of legislation developers have a place because they will do what the customer either will not or cannot do for itself –Take equipment related-performance risk –Take construction risk Timing Quality –Development activities and development risk Permitting Land acquisition –Other development skills Development teams

4 What Do Customers Act Like They Think the Developer/Owner is Here For? Virtual extended warranty –Equipment suppliers only provide limited warranties –PPAs with performance guarantees but without Force Majeure protection for equipment failure are difficult to distinguish from long-term equipment warranties Make the sun shine –PPAs with minimum delivery guarantees place developers in the position of writing long-term weather and climate insurance Significance of inadequate data

5 What Do Customers Act Like They Think the Developer/Owner is Here For? Change-in-law insurance –PPAs without flow through of change-in-law costs place developer in the position of writing long term change-in-law insurance –Important for thermal projects due to greenhouse concerns –Solar projects have change-in-law risk too Operating standards Increased taxes from local municipalities

6 Adequate Protection for Developers/Owners If contracts do not have adequate protection for developers, developers end up playing roles that they are not suited for and that they are not compensated for –If insolation is not adequate, or if laws change, that is a cost that the ultimate customer (ratepayers or consumers), not developers or power purchasers, should carry. –The developer is not in a position to pass that cost through; the power purchaser is –Similar considerations apply to utility and commercial projects

7 Adequate Protection for Developers/Owners Developers can assume these risks –It is a business decision, not a legal decision –Assuming this risk does not make contract unenforceable –It can raise concerns with lenders and equity providers –Developers who assume risks should be sure they are compensated –Ability to price appropriately depends on when issues come up Issues that come up late in negotiations create unfunded mandates

8 Key Take-Away Message If you are a developer/owner and you are assuming risks above and beyond the cost of producing power, make sure you are being paid for it! In other words, if you are going to be in the insurance business, make sure you collect your premium.

9 Specific PPA Issues Common themes –Allocation of risk –Modularity

10 Contract Structure Some risks are inherent in the way solar contracts are structured –For many technologies, power sales has an energy and a capacity component, but most solar PPAs are energy-only –In energy and capacity PPAs, capacity payments usually continue even if the purchaser experiences problems on its side of the delivery point unless the PPA provides otherwise –In an energy-only PPA, if the purchaser cant take the energy for any reason, the owner wont get paid unless there is a contractual provision that provides for payment –Eliminating capacity payment automatically shifts risk due to third party non-performance from the buyer to the seller Capacity payments for solar facilities –Theoretical support –Actual Experience –Trend toward energy-only for other renewable technologies

11 Specific PPA Issues Development milestones –Intermediate milestones Permitting Contracting Make whole –Commercial operation Establishing deadline Partial commercial operation –Bad Equipment –Zoning Prorated damages

12 Specific PPA Issues Development milestones –Delays Force Majeure –Day-for-day? Permits Delays by interconnecting provider –Deemed commissioning Lost ITC –Payment for test power Conditions precedent/subsequent –Permits/ PUC approval –Financial closing –Others

13 Specific PPA Issues Transmission issues (utility projects) –Practical issues Availability –Responsibility for securing –Failure of transmission Remedies –Lost power sales –Foregone tax credits –Balancing/scheduling issues

14 Performance Damages Production guarantees –Acceptability Double dipping of penalties –Basis for guarantee –Calculating of production (Rolling 12/24/36 month period) Credit for excused outages –Shake-out period –Consequences Damages Additional equipment

15 Performance Damages Availability guarantees –Acceptability –Level of guarantee –Calculation of availability (Rolling 12/24/36 month period) Credit for excused outages –Cost of excessive monitoring –Consequences Replacement power Other amounts

16 Defaults Seller defaults –Extended cure periods for general defaults –Representations and warranties Buyer remedies –Lifetime replacement power Pre commercial operation vs. post commercial operation –EEI contract settlement amount Buyer defaults –Payment default cure periods –Buyers failure to purchase Energy payments ITC Recapture Seller remedies for buyer default –Adequacy of settlement amount

17 Force Majeure Misconceptions about Force Majeure Typical Force Majeure –Act of God –Change of law –Governmental action or failure to act –Unavailability of replacement equipment Equipment failure as Force Majeure –Virtual extended warranty –Warranty unavailable from manufacturers –Any failure or failure of properly maintained equipment –Adequacy of insurance Full or partial Force Majeure Termination for extended Force Majeure –Limit to material operational problems –Partial termination

18 Assignment Lender issues –Finance assignment –Right to replace owner –Lender assumption of obligations –Further assurances Upstream ownership transfer as assignment

19 Miscellaneous Issues Limit on liability –Dollar cap on liability Consequences of exceeding cap –ITC recapture as consequential damages Change-in-law risk –Operating standards –Tax Security –Cash security –Subordinated lien

20 Miscellaneous Issues Bidding strategies –Exceptions Governmental vs. private bids –Generic model PPA Municipal/governmental purchasers –Bidding requirements –Sovereign immunity

21 Alternatives Merchant power (utility projects) –Driven by several factors Reluctance of utilities to contract Desire to retain upside from RECs –Ability to hedge price for power Build-Own-Transfer –Alternative way to monetize tax benefits: sell entire project to customer –Differences from EPC IPP takes all development tasks, including tasks usually performed by owners –Acquire equipment –Assemble land –Secure permits

22 Power Sales from Solar Projects Lee M. Goodwin