Radiation Protection lessons Experiences with operating beams for Neutrino experiments H. Vincke, CERN July 4, 20081Nufact’08, Valencia, Spain.

Slides:



Advertisements
Similar presentations
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Advertisements

Tritium Management at Fermilab Stuart Henderson Associate Laboratory Director for Accelerators Community Advisory Board Meeting August 23, 2012.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Radiation at accelerator laboratories Prompt radiation from the particle beam Beam induced radiation –Neutrons –Gammas –Synchrotron radiation Radiation.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
The CNGS Operation and Perspectives l Edda Gschwendtner, CERN.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Construction and Installation of the CLIC Experimental Area
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
1 JASMIN Activation Experiments (T-972/993/994) Yoshimi Kasugai on behalf of JASMIN Activation team JASMIN Activation team Y. Kasugai, K. Oishi, H. Matsumura,
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
1 Some Radiation Protection Challenges: Deep Underground vs. Shallow Beams Sam Childress - Fermilab 9 Nov. 2012CERN NBI
NuMI Target Station AHIPA09 10/19/09 Jim Hylen/FNAL Page 1 Target Station Infrastructure: The NuMI Experience Focus of this talk: Hot handling Target pile.
Radiation Protection and Licensing K. Vaziri, FNAL Radiation Physics Team Proton Accelerators for Science and Innovation Workshop High Power Targets and.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Studies of Muon-Induced Radioactivity at NuMI David Boehnlein Fermi National Accelerator Laboratory (on behalf of the JASMIN Collaboration) NuFact09 –
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
120 GeV Targeting Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Fermilab AAC meeting August 8, 2007 With thanks to Patrick.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
NUMI NuMI Internal Review July 27, 2001 Target Hall Shielding Review Page 1 Target Hall Shielding Review Radiation Safety Coordinator Nancy Grossman FNAL.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
Overlap of Project X and Beamline to DUSEL June 2, 2008.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Secondary beam production facility layout discussions SBLNF meeting 5 th Dec M. Calviani, A. Ferrari, R. Losito (EN/STI) H. Vincke (DGS/RP)
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
BooNE / NuMI Rad. Protection NBI 2002 S. Childress (FNAL) Radiation Protection for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Peter Kasper.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
120 GeV Targeting Overview Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Accelerator Physics and Technology Workshop.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
1 Target Station Design Dan Wilcox February 2012.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
News and brief overview of Beamline plans for the next few months
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Presentation transcript:

Radiation Protection lessons Experiences with operating beams for Neutrino experiments H. Vincke, CERN July 4, 20081Nufact’08, Valencia, Spain

Outline July 4,  Experiences at CERN: a bit of history - from WANF to CNGS  Principle problems at WANF & improvements of the CNGS facility  Lessons learned from CNGS, MiniBooNE, NuMI and K2K Nufact’08, Valencia, Spain

Neutrino studies at CERN at the SPS July 4, 20083Nufact’08, Valencia, Spain Two major neutrino facilities at CERN at the SPS (Super Proton Synchrotron)  The old one: The West Area Neutrino Facility (WANF) of the CERN SPS was commissioned along with the SPS accelerator itself in 1976  This facility was used until the area was shut down in The beam line was operated at proton intensities of up to 3×10 13 ppp (450 GeV)  The new one: CNGS was approved in 1999 and started beam operation in 2006 (up to 4.8×10 13 ppp, 400 GeV).

WANF vs. CNGS - I July 4,  No shielding around the beam line  High residual dose rates during maintenance or repair work  Air activation WANFCNGS Nufact’08, Valencia, Spain

WANF vs. CNGS - II July 4,  WANF - Absence of a service gallery Nufact’08, Valencia, Spain Target chamber Junction chamber Ventilation chamber Decay tunnel Service gallery beam  CNGS - a separate service gallery minimizes occupancy of the target chamber. Most of the equipment (pumps, cooling units, power supplies, cable trays, etc.) did not have to be located in the target chamber. Less activation of components, lower collective dose during interventions.

Prompt dose rate in CNGS (8E12 pot/s) July 4, 2008Nufact’08, Valencia, Spain6 Use a three leg design Reference: M. Lorenzo Sentis, A. Ferrari, S. Roesler, L. Sarchiapone, CERN-OPEN

WANF vs. CNGS - III July 4,  WANF  Part of the gear mechanism for the crane was made out of teflon.  CNGS  no teflon. Further, crane cables are located outside the target chamber when the crane is in its parking position. Thus, they are exposed to much lower radiation than compared to a storage location in the target chamber.  WANF  O’rings in pumps and motors were not specified to be radiation resistant.  CNGS  only radiation hard components were installed in the CNGS target chamber  WANF  Blocking of the vacuum shutter mechanism because of the degradation of the travel-limiter switches or thickening of grease due to radiation.  CNGS  shutter mechanism is located in the service gallery Nufact’08, Valencia, Spain

WANF vs. CNGS - IV July 4,  WANF  There was a continued inability to provide a correct closed-circuit ventilation system  Because of this, the decision was taken to stop the air circulation during operation. This caused strong rusting due to the build-up of humidity.  CNGS  The ventilation system is housed inside a ‘ventilation chamber’ which is separated from the target chamber. Maintenance of ventilation units can be done in a ‘low’ radiation area.  Separate ventilation system is for the target chamber/service gallery, the proton beam-line tunnel and the access gallery. Therefore, no mixture of radioactive air with non radioactive air.  Effective air dehumidifier was installed – reduces the problem of corrosion considerably. Nufact’08, Valencia, Spain

Further CNGS improvements July 4, shielding blocks at target, horn and reflector can be removed remotely marble shielding at target station Nufact’08, Valencia, Spain

Further CNGS improvements July 4, Remote exchange of radioactive items like target, horn, reflector and collimators in case of a failure. The crane console is located in the ventilation chamber… camera is mounted on crane. Nufact’08, Valencia, Spain

Further CNGS improvements July 4, A special stub tunnel has been constructed to serve as a radioactive storage area. Transport into the storage area can be made with a remote controlled transport vehicle. No need for long (time and distance) transports of radioactive components to a storage location somewhere on the surface. Nufact’08, Valencia, Spain

Further CNGS improvements  Used quick connectors for flanges, horn-stripline connection, horn water pipes.  Choice of material - for example we used only stainless steel with no or very low content of cobalt.  Redundancy function for ‘delicate’ items; for example target or two independed water cooling circuits for horn and reflector July 4, Nufact’08, Valencia, Spain CNGS target magazineSwitch for water circuits

Remotely controlled radiation survey - I 13July 4, 2008Nufact’08, Valencia, Spain A survey platform has been developed to measure the residual dose rate in the CNGS cavern remotely The platform can be mounted on the crane. Reaches nearly any location in the target chamber. Prevents exposure of personnel to high radiation levels during manual measurements.

Lessons learned from CNGS, NuMI, MiniBooNE and K2K July 4, Nufact’08, Valencia, Spain

Radiation accelerated corrosion and radiation damage is a big problem  Beam induced ionization of air creates a nitric acid environment. Examples of failures due to this fact  Mini-BooNE 25 m movable absorber. Two failures of steel chains  Concerns over similar corrosion of NuMI Decay Pipe window (Al, 1/16”thick) have motivated NuMI to use He gas in decay pipe rather than evacuated.  Target and horn failures are mostly related to corrosion and radiation damage issues.  T2K will house its target and horn in a Helium environment July 4, Nufact’08, Valencia, Spain

Material studies are needed  Corrosion and air radicals are still a big problem in a ‘humid’ environment like water cooled target, horn etc. Photos - courtesy of S.Rangod Placed at WANFOngoing study – metal samples placed under the horn at CNGS July 4, Nufact’08, Valencia, Spain

Repair work Failure of target, horn occurs more often than expected. However, what fails are items like water lines, ceramic isolators and not the main, expensive device. July 4, Nufact’08, Valencia, Spain Therefore: have spare part perform dry runs on spare part or mock-up Optimizing the work procedure use remote exchange and transport of activated items to the place where the work will be performed perform work in a work-cell (presently only at NuMI).  All these reduces the dose to the repair crew considerable

Residual dose rate at NuMI horn in August 2006 Repair people got weekly dose limit in seconds although the work was well planned and optimized with several dry runs.  Repair would have been impossibly without a work-cell Horn 1 ceramic replacement challenging July 4, Nufact’08, Valencia, Spain 100 mr/h = 1 mSv/h

NuMI Work-Cell Connections done through module by person on top of work cell Railing Lead-glass window Horn Remote lifting table Concrete wall Module Shown during test-assembly above ground July 4, Nufact’08, Valencia, Spain

Tritium First seen at NuMI - Tritium levels were greater than expected in water pumped from NuMI tunnel. Measured up to ~30 pCi/ml in Nov FYI – surface water limit in the US is 2000 pCi/ml and drinking water limit is 20 pCi/ml. Task Force established and mitigation implemented  condensate from an air conditioning unit in the target area was collected and disposed separately.  Installation of two dehumidification systems. One for target hall and one for target chase air. They prevent tritiated humidity from passing through the decay hall and mixing with the tunnel water  These measure reduce the amount of tritium that otherwise could reach the Fermilab surface waters by about a factor of seven. In addition, Fermilab started an investigation together with help from the Lawrence Berkeley National Laboratory (LBNL) to understand the tritium origin and transport Progress Report: Mobility of Tritium in Engineered and Earth Materials at the NuMI Facility, Fermilab - LBNL July 4, Nufact’08, Valencia, Spain

Major findings from the report “….. movement of tritium through the facility is dominated by vapor transport”. “In addition to the tritium directly produced in the humid air during beamline operation, tritium is expected to enter the airstream by diffusion of tritium produced in the shielding materials close to the Target Pile and absorber. “ “Production of tritium in the concrete and fractured rock along the Decay Pipe may provide another source of tritium that is slowly released by diffusive processes. “ “Once in the air phase, tritiated vapor is transported by the ventilation system to other parts of the facility, where it may condense, diffuse into the concrete and rock, and—if conditions change—diffuse back from these materials. These transport, exchange, and phase partitioning processes explain why high tritium concentrations persist even when the beam is shut off.” “Increased concentrations of other radionuclides produced at the NuMI facility, such as Na-22, could also have a significant environmental impact; therefore, in addition to tritium, transport of these radionuclides should be investigated.” July 4, Nufact’08, Valencia, Spain

At CNGS similar findings July 4, Nufact’08, Valencia, Spain

Tritium in CNGS sumps Service gallery I st muon chamber July 4, Nufact’08, Valencia, Spain Calculation of H-3 in the air of the target chamber for the 2006 run: 65 MBq Release of H-3 via TSG4 sump water until July 2007: 410 MBq Calculated H-3 in target chamber for the 2006 run - in addition to air ~ 13 GBq. ▫ in shielding components 48 % ▫ in aluminum of horn/reflector & helium tube 33 % ▫ in concrete walls 13 % ▫ in molasse rock 4.5 % ▫ in horn reflector cooling water 1.0 %

Predictive ‘power’ of Monte Carlo particle transport codes  Whereas the predication of prompt dose rates was rather good in the past also the estimates of induced dose rate is now a days remarkable  Monte-Carlo Programs can predict residual dose rates and specific radioactivity (for most of the isotopes) within % of errors. This allows much better design studies, optimizing of maintenance and repair work and better studies of waste management.  However, chemical composition of components must be known - sometimes to trace element level.  Do not design to regulatory RP limits, always keep a safety factor Dose rate as function of cooling time for different distances between sample and detector Reference: M. Brugger et al., Radiat. Prot. Dosim. 116 (2005) July 4, Nufact’08, Valencia, Spain

Thank you Special thanks to Sam Childress, Nancy Grossman, Jim Hylen, Takashi Kobayashi, Yuichi Oyama, Stefan Roesler, Kazuhiro Tanaka, and Kamran Vaziri for contributing material/information for this presentation. July 4, Nufact’08, Valencia, Spain