Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop 2010 12-15.

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
How e-cloud effect affects the ILC DR Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
18-20/12/2007 ILC Damping Ring R&D Mini-workshop, KEK, Japan Vacuum Design vs. e-cloud Oleg B. Malyshev ASTeC Daresbury Laboratory.
20-21 January 2009, RAL Joint DL-RAL Accelerator Workshop 1 INVESTIGATION OF NON- EVAPORABLE GETTER FILMS O. B. Malyshev, K.J. Middleman, A. Hannah and.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
SR Vacuum Systems and Front Ends
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Beam screens in IT phase 1
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
1 of 30 rjrALBA Workshop, Barcelona, th Sept 2005 The Evolution of Vacuum System Design for Accelerators over 30 years at Daresbury Lab Ron Reid.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
1 Vacuum in LER and HER. First estimation for the pumping system requirements (part II) A.Variola for B.Mercier, C.Prevost Annecy - Mars 2010.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
5-7/11/2007 DR KOM ILC2007,CI, Daresbury, UK Vacuum Design Oleg B. Malyshev ASTeC Daresbury Laboratory.
INVESTIGATION OF NON-EVAPORABLE GETTER FILMS
Vacuum Problems in the ILC Damping Ring
Dr. Oleg B. Malyshev Senior Scientist ASTeC Vacuum Science Group
CEPC Vacuum System Dong Haiyi 2017/11/5.
Electron cloud and collective effects in the FCC-ee Interaction Region
RECENT DEVELOPMENTS IN MODELING
SuperB General Meeting June , Perugia (Italy)
Electron Clouds at SLAC
Status of CTC activities for the Damping rings
CEPC Vacuum Systems Design Consideration
Presentation transcript:

Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop January 2010

Integration design: usual consideration fieldparameterimplication Beam dynamics Beam aperture Impedance/wake field BPM Vacuum chamber aperture, Shape, material, coatings BPM design SR powerPower, photon reflectivity SR power absorber design, cooling Vacuum designSR induced gas desorption Pumping scheme, vacuum chamber material, coatings Fast ions (in e - DR) Gas density specification Ion collection UHV pumping scheme Mechanical design Mechanical solutions Mechanical design, component integration, mechanical stability, etc. Shape, material, supports, cooling, welding, brazing, feedthroughs, etc. CostCost optimisationAll systems th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Integration design: specific problems in e + rings fieldparameterimplication Ion induced pressure instability Rapid gas density grow Residual gas ionisation Ion energy, ISD yield Vacuum design: Requires greater pumping speed and low outgassing walls E-cloud mitigation PEY (minimising a number of photoelectrons in beam pipe) Shape, antechamber, SR absorbers, coatings, low photon reflectivity SEY (minimising) Wall material, Coating, Grooves, electrodes Residual gas ionisationUHV pumping scheme Electron simulated gas desorption Low outgassing walls Mechanical solutions More complicate integration Cost Guaranteed performance at the lowest cost Challenging th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Vacuum required for ILC DRs The need to avoid the fast ion instability leads to very demanding specifications for the vacuum in the electron damping ring [Lanfa Wang, private communication] : < 0.5 nTorr CO in the arc cell, < 2 nTorr CO in the wiggler cell and < 0.1 nTorr CO in the straight section In the positron damping ring required vacuum level was not specified and assumed as 1 nTorr (common figure for storage rings) th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Ideal vacuum chamber for vacuum design for the electron ring and, where possible, for the positron ring: Round or elliptical tube Cheapest from technological point of view No antechamber if SR power can absorbed with vacuum chamber wall cooling Beam conditioning is most efficient Easy geometry for NEG coating NEG coated Requires less number of pumps with less pumping speed 160C for NEG coating activation instead of C bakeout Choice of vacuum chamber material (stainless steel, copper and aluminium ) does not affect vacuum in this case Residual gas CH 4 and H 2 (almost no CO and CO 2 ) th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

12-15 th January 2010 LER2010, CERN, Geneva, Switzerland O.B. Malyshev Pumping scheme along the ILC DR arc An aluminium tube after bakeout at 220  C for 24 hrs and 100 Ahr beam conditioning: a pump with S eff = 200 l/s every 5 m H 2, CO and CO 2 Inside a NEG coated tube after activation at 160  C for 24 hrs and 100 Ahr beam conditioning: a pump with S eff = 20 l/s every 30 m H 2 and CH 4 O. Malyshev. Vacuum Systems for the ILC Damping Rings. EUROTeV Report

Ion induced pressure instability in ILC positron DR th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev H2+H2+ CO H2H2 CH 4 CO 2 e + beam where Q = gas desorption, S eff = effective pumping speed,  = ion induced desorption yield  = ionisation cross section, I = beam current.

Critical current th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev IcIc Critical current, I c, is a current when pressure (or gas density) increases dramatically. Mathematically, if

The ion stability for different vacuum chamber materials, I max =0.4 A th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev Vacuum chamberI c, (A)I c / I max Domin. gasStable or not Distance between pumps L = 6 m, ID = 50 mm 316LN1.02.5COYes Pure Al CONo Ti alloy1.12.8COYes Distance between pumps L = 6 m, ID = 60 mm 316LN COYes Pure Al CONo Ti alloy1.43.5COYes Distance between pumps L = 10 m, ID = 50 mm 316LN CONo Pure Al CONo Ti alloy CONo Distance between pumps L = 40 m, ID = 50 mm NEG coated512.5CH 4 Yes

Pressure instability conclusions: Ion energy = ~300 eV, but could be larger for a smaller beam For given parameters and large uncertainties, there is a possibility of ion induced pressure increase and even ion induced pressure instability in positron damping ring if pumping is insufficient. Use of NEG coating fully eliminates the probability of the ion induced pressure instability. O.B. Malyshev. Study of Ion Induced Pressure Instability in the ILC Positron Damping ring. EUROTeV Report th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Electron cloud Three sources of electrons: Photoelectrons Secondary electrons Gas ionisation th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Photoelectrons Photoelectrons: PEY = F R, where is a total SR flux. A photon flux absorbed in beam chamber can be minimised with an antechamber, F is an antechamber efficiency Lower photon reflectivity, R, helps as well Choice of material, surface treatment, conditioning, coating (ex.: TiZrV) allows to reduce photo-electron emission yield,  O.B. Malyshev and W. Bruns. ILC DR vacuum design and e-cloud. Proc. of EPAC08, p.673, and references with in the paper th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

PEY for different types of vacuum chamber Beam pipe Inside magnets, B ≠ 0 Downstream straights near the magnet, B = 0 TubeAntechamberTubeSolenoidAntechamber Estimated achievable PEY Dipole SR 3 ⋅ – ⋅ – 6.5 ⋅ – – 0.01 Wiggler SR 3 ⋅ – ⋅ – 6.5 ⋅ – – 0.1 Required maximum PEY from e-cloud modelling Dipole~10 -4 ? Wiggler~10 -4 ? th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Secondary electrons Secondary electron yields, e-cloud and mitigation techniques are intensively studied in many places, see all other talks on this session. Secondary electron Choice of material (intrinsic SEY for flat and dense surface) Surface treatment to modify surface micro-structure (air bake, anodisation, ion bombardment, etc.) Low SEY coatings: material and its surface micro-structure: TiZrV or TiN or Amorphous C coatings Geometrical electron traps (ex.: grooves) Field suppression: Magnetic material coatings Biased electrodes Solenoid field th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

17 th June 2009Outgassing in vacuum systems, DLS, Didcot O.B. Malyshev Gas ionisation Ionisation cross section of heavy molecules is higher: (CO 2 )=12 (H 2 ) Ionisation in ILC DR can be neglected when CO pressure is below Torr Surface treatment and conditioning Low outgassing coating (ex.: TiZrV coating) Better pumping (ex.: TiZrV coating or more pumps) O.B. Malyshev and W. Bruns. ILC DR vacuum design and e-cloud. Proc. of EPAC08, p.673.

17 th June 2009Outgassing in vacuum systems, DLS, Didcot O.B. Malyshev Selecting an e-cloud mitigation A complex solution required: Good solution against Photo-electrons or Secondary electrons might lead to higher gas density and higher gas ionisation, and vice versa, best pumping solution might compromise PEY and SEY mitigation. NEG coating is the best choice for UHV systems. NEG coating + grooves might be sufficient in many places Using other coatings and other mitigation techniques increases a cost of DR and should be only used where it is essential.

Engineering Model Work by J. Lucas, N. Collomb and S. Postlethwaite (STFC Technology) Developing a CAD model for mechanical integration of vacuum system, BPMs, magnets and supports. Goals: to demonstrate engineering feasibility of both the Electron & Positron Damping Ring Periodic Arc Cells; to provide a basis for further design and beam dynamics studies and costing of vacuum, magnets, conventional facilities, etc th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

e + injection e + extraction e - extraction e - injection Quick print layout (Positron Ring off-set for clarity). Electron Wiggler Section Positron Wiggler Section Electron RF Section Positron RF Section DC04 Overall Layout (simplified)

Arc Cell Components Gate Valves Electron Vessel Positron Vessel Work has focused on developing the model for a Single Arc Cell (Linear) One Gate Valve per 5 Arc Cells Gate Valve supports consist of one fixed and one sliding Bellows allow for 4.5 mm/meter thermal expansion (NEG activation at °C). Typical Gate Valve Supports FixedSliding Straight Cylindrical Vessel Tapered Vessel Ante-Chambered Vessel Tapered Vessel Pumping Port BPM Station (Electron) BPM Station (Positron) Gate Valves

Magnet & Supports – (Electron) Magnet & Supports Quadrupole Sextupole Skew Quad Steering Magnet Dipoles Dipoles & Supports Positron Vessel Support Electron Two-Piece Vessel Support Vessel Pumping Supports Electron Two-Piece Vessel Pump Support Positron Vessel Support Arc Cell Components Cont’d BPM Station

Vacuum system: key features Vacuum chamber mostly consists of straight cylindrical tube. Internal diameter 60 mm, wall thickness 2 mm. Antechamber and cooling provided in dipoles and a few meters downstream. Intended to reduce build-up of electron cloud by reducing the number of photons in the beam chamber. Dipole chamber will consist of extruded vessel with antechamber, welded to machined "taper" sections. A pumping port is included in antechamber downstream of dipole. All vacuum chambers are NEG coated th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev

Vacuum Vessel Profiles Cylindrical Vessel Ante-Chamber Vessel A.C. Tapered Vessel

Vacuum Vessel BPM Stations BPM Reference Pillars Positron End ViewElectron End View BPM Bellows Arrangement Fitted on all BPM Blocks Reference Pillar provides reference points for the beam orbit. Position Encoders monitor any motion of BPMs from thermal or mech effects Position Encoders Digital Length Gauges 0.5 um Resolution Ground Surfaces

Challenges in a wiggler section design: SR power absorption – up to ~40 kW per wiggler Power dissipation calculation by K. Zolotarev (BINP) Minimising a number of SR photons hitting beam chamber inside a wiggler to provide low PEY Antechamber and shadow Grooved top and bottom and TiN coating to provide low SEY Sufficient pimping (NEG strips + SIPs) Impedance calculation by M. Korostelev (CI and Liverpool University) Big thank to Cornell and LBNL for their information on the CESR-TA wiggler design. Schematic Positron Wiggler BPM with Bellows arrangement Quad Magnet Steering Magnet (could be eliminated by introducing a mover system for the Quad magnet) DC04 Wiggler Section

Beam direction Superconducting Wiggler Synchrotron Radiation Absorber Quadrupole Vacuum Chamber BPM & Bellows arrangement ILC Damping Ring – Wiggler Section 88 Section repetitions for 6.4km circumference Damping Ring

Beam direction High Power Synchrotron Radiation Absorber ILC Damping Ring - Wiggler Section - Vacuum Chamber cross- section Copper ‘wedges’ – aperture transition from BPM (preceding section) to Wiggler vacuum chamber BPM buttons in shadow – damage prevention

ILC Damping Ring – Wiggler Vacuum Chamber Beam direction Copper ‘wedges’ to provide smooth aperture transition. BPM from preceding Wiggler section fastened to flange mm Wiggler vacuum chamber - Circular aperture with ‘Ante- chamber’ and NEG coated strips.

Copper ‘wedges’ to provide smooth aperture transition

ILC Damping Ring – Wiggler Vacuum Chamber detail 128 mm 110 mm 20mm 60mm 16mm 9mm 2mm 19mm E-cloud suppression groves. Peak to peak pitch 1mm Wiggler vacuum chamber – nominal diameter 52mm Ceramic supports for NEG strips. 4 Cooling chambers Internal Chamber coating: TiN

ILC Damping Ring – Wiggler Vacuum Chamber detail Serrations machined at 2 degree to blend into flange diameter. Absorber flange end Beam direction Ceramic supports. Designed for good vacuum pumping and insulation between chamber and NEG strips. NEG strips.

ILC Damping Ring – SR Absorber detail

ILC Damping Ring – SR Absorber detail 499 mm Open wall design Wiggler flange connection Quadrupole magnet vacuum chamber flange connection Circular aperture (ø52mm) with Ante-chamber Circular aperture (ø46mm) with serrated ramp. Circular aperture (ø52mm)

The ramped (or sow tooth) absorber geometry was originally invented at BINP for SR absorbers designed for Siberia-2 LS (Russia) This geometry was also used for a crotch absorber in the Diamond LS (UK)

ILC Damping Ring – SR Absorber detail Bottom manufactured part Serrated ramp leading from ‘Ante-chamber’ aperture to circular aperture. Circular aperture (ø52mm – ø46mm) with Ante-chamber Circular aperture (ø46mm) with serrated ramp. Circular aperture (ø46mm - ø52mm) Pillar support for top part and Wiggler flange interface Beam direction Ramp Angle optimised for SR absorption and low Wakefield impedance.

ILC Damping Ring – SR Absorber detail Aperture ø46mm Aperture ø52mm 10 mm Serrations for radiation absorption. Peak to peak pitch and depth under investigation. Cooling channels may need optimisation depending on radiation simulation and Finite Element Analysis thermal load results. Smaller aperture provides shadow for BPM

ILC Damping Ring – Quadrupole Magnet Vacuum chamber Simple and cost effective design Beam direction Circular aperture (ø52mm) 454 mm Quadrupole magnet vacuum chamber flange connection BPM Bellow flange connection

ILC Damping Ring – Beam Position Monitor BPM buttons recessed to prevent damage by radiation. Arc Cell RF finger design adopted for Wiggler section. Arc Cell BPM design with corresponding reduction in diameter and length. Beam direction BPM Bellow flange connection to proceeding Wiggler section. BPM Bellow flange connection from Quad vacuum chamber Circular aperture (ø52mm)

Conclusions Mechanical design of ILC DR vacuum vessel includes requirements from Impedance, e-cloud, power absorption and vacuum models Low cost Drawing of vacuum vessel of ILC DR are available to be used for the next run of modelling. Impedance and wake field calculation e-cloud modelling Vacuum system design Although the design is made for 6.4-km ring, most of the components could be used for 3.2-km rings models th January 2010LER2010, CERN, Geneva, Switzerland O.B. Malyshev