ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 SC4 Opening Plenary WG12 Report San Francisco, CA, USA TC184/SC4/WG Meeting 2001/06/11 Greg A. Paul WG12 Convener.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

STEP and related approaches to Long Term Knowledge Retention Mike Pratt, LMR Systems, UK Atlantic Workshop on Long Term Knowledge Retention Bath, UK 12.
C O P Y R I G H T E U R O S T E P G R O U P Changes to ISO Rob Bodington, Phil Spiby.
1 April 18 th, 2002 Electronic Commerce Promotion Council of Japan (ECOM) 5 th ebXML Asia Committee Taipei meeting Current Status of OASIS ebXML CPPA TC.
ISO TC 184/SC San Francisco Opening plenary1 ISO TC184/SC4-SC5 JWG8 N249 SAN FRANCISCO OPENPLENARY.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Verification Planning and Compliance Matrices Brian Selvy Wednesday, August 13, :30 – 5:00 p.m. Phoenix West Conference Room.
DEX Publication Project OASIS PLCS TC Telecon 29 April 2008 Trine Hansen.
© 2012 The MITRE Corporation. All rights reserved. For internal MITRE use 11 July 2013 Meeting #6 hData Record Format Task Force 1 © 2012 The MITRE Corporation.
1 Software Requirement Analysis Deployment Package for the Basic Profile Version 0.1, January 11th 2008.
The Quiet Revolution in Building Design and Construction: BIM.
Systems Engineering Management
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Configuration Management
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
G. Cosmo & M.G. Pia. The Training Kit Project Gabriele Cosmo & Maria Grazia Pia Geant4 Workshop Paris, October 2000
ISO Standards: Status, Tools, Implementations, and Training Standards/David Danko.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
EULITA / Liese Katschinka Copyright (c) An ISO Standard for Interpreting Services in Judicial Settings Opatija, 20 March
Copyright LKSoftWare GmbH About STEP A rough overview on ISO Lothar Klein, LKSoftWare GmbH This work is done as part of the European.
ISO TC 184/SC4 1/12 Opening Plenary: QC Report Thomas L. Warren Technical Writing Program Ok.State U.
S oftware Q uality A ssurance Part One Reviews and Inspections.
Software Quality Assurance Activities
COMP-14: Automating your deployments using ANT Gary S Clink Business Consultant.
ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC.
Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Capstone Design Mechanical, Industrial, and Manufacturing Engineering.
Ted Vorburger Simon Frechette, Son Manufacturing Engineering Laboratory, NIST Len Slovensky Northrop Grumman TC213 Meeting.
Doc.: IEEE /1341r0 Submission September 2011 Andrew Myles, CiscoSlide 1 JTC1 SC September Closing Report 22 Sept 2011 Authors: Meeting.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October, 2009 ESTEC, The Netherlands Takahiro Yamada, JAXA/ISAS.
Interim Solution What it is and how to to use it 21 June 2012.
Sunflower Project Data Conversion Workshop May 5, 2009.
ISO edition 2 Publication plan R. Bodington Eurostep Limited ISO edition 2.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
- Sponsored by UK MOD ISO edition 2 Rob Bodington, Phil Spiby.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Paul van Exel, Director USPI Standards association Oil, Gas, Process & Power Industry Paul van Exel, Director USPI Standards association Oil, Gas, Process.
Joint Meeting Report on Standards 8 July Recent Accomplishments Systems Modeling Language (SysML) specification accepted for adoption by OMG AP233.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Query Health Technical WG 5/31/2012. Agenda TopicTime Slot Announcements2:05 – 2:10 pm RI and Spec Updates2:05 – 2:10 pm HQMF Schema and Sample Changes2:10.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
WG9 Report ISO/TC211 Plenary Meeting Montreal, Canada
1 Industrial Data Implementors Forum Martin Hardwick STEP Tools, Inc. June 13, 2001 San Francisco, USA.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 29 Slide 1 Configuration management.
Critical Design Review (CDR)
® A Proposed UML Profile For EXPRESS David Price Seattle ISO STEP Meeting October 2004.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
1 ISO TC184/SC4 Wg3/T24 STEP Manufacturing Martin Hardwick STEP Tools, Inc. June 11-15, 2001 San Francisco, USA.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
WG3 Presentation to TC184/SC 4 Closing Plenary Baltimore, USA 23 Oct 2015 WG3 Oil, Gas, Process and Power Paul van Exel, Convener Nils Sandsmark, Deputy.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
Certification and Validation Process NPIVP Workshop - March 03, 2006.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
ISO TC 184/SC4 ISO TC184/SC4/WG3 San Francisco N T24 - Schedule (1/4) Monday Afternoon - Joint meeting with SC1/Wg7 and Manufacturing Task.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Doc.: IEEE /147r0 Submission November 1999 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Doc.: IEEE /030r0 Submission 19 January 2001 James P. K. Gilb, MobilianSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
North American Profile Briefing FGDC Coordination Group May 1, 2007 Sharon Shin, FGDC Metadata Coordinator.
SysML/AP233 Mapping Status INCOSE IW MSDS Report Phil Spiby and Allison Feeney 1.
SSG meeting N°27 on the 5th and 6th of July 2016
James W. Moore Liaison Representative IEEE Computer Society June 2004
ISO/TC 204 WG 3-Database Technologies
43rd Session GRB 21 February 2006 Geneva, Switzerland
Geometry Services for ISO – STEP standards linking product definition, management and visualization in the value chain Jean Brangé :
S-127 – Marine Traffic Management Release Candidate NIPWG 6 30 January 2019 Raphael Malyankar Eivind Mong Sponsored by IHO.
ESS.VIP VALIDATION An ESS.VIP project for mutual benefits
Rob Bodington, Phil Spiby
Presentation transcript:

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 SC4 Opening Plenary WG12 Report San Francisco, CA, USA TC184/SC4/WG Meeting 2001/06/11 Greg A. Paul WG12 Convener

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 WG12 Progress Since Funchal Signed Off by Convener –ISO/IS (Finite element analysis definition relationships) –ISO/CD (Mathematical description) –ISO :1994/Cor.3:2000 – Cumulative of previous ISO/DIS Passed DIS w/100% - In for preliminary Convener review for IS distribution EXPRESS defects technical corrigendum for /100/500 series IS parts –41, 42tc1,42tc2, 42tc3, 42e2tc1, 43tc1, 43tc2, 44, 45, 46tc1, 47, 101, 105tc1, 105tc1, 519 –Additional 46tc2 issues identified – plan to finalize document at this meeting –Future TCx will probably incorporate previous TC changes (cumulative)

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 WG12 Progress Since Funchal Submitted to Convener for Preliminary Review (NWI/CD) –ISO/CD TS PDM suite of modules product identification (Ballot Package 1 ProdID) product structure (Ballot Package 2 ProdStr) engineering change (Ballot Package 3 EngChg) configuration and effectivity (Ballot Package 4 ConfEff) document and file management (Ballot Package 5 DocFile) validation properties (Ballot Package 6 ValProp) properties (Ballot Package 7 Props) shape representation (Ballot Package 8 Rep) Available for review for ISO –WD (Parameterization and constraints for explicit geometric product models) –WD (Mesh Based Topology) –WD (Numerical Analysis)

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 WG12 Progress Since Funchal Unique Name Verification Tool for ISO Parts –STEP Tools, Inc. ( –Take NOTE! It works! –Will work with STI/SC4 Sec to ensure correct schema are being used –Identified and corrected errors prior to current ballots

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 WG12 Progress Since Funchal SEDS (10303) –SC4 Sec is working this Great Progress –May have duplicates* –Should be closed** –Lot of cleanup in interim –Appears that process is starting to work for identification of new SEDS and working old/new SEDS –Identified new ISO issues for TC

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 Issues for Week ISO TC2 Technical Issues Short to Long Generation for EXPRESS Extensible Selects – Modules Module numbering procedures within SC4 and WG12 Synchronizing of EXPRESS, Short Name Registry, and SOLIS for Common Resources Supplementary Directives for HTML publication of SC4 documents

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 Goals of Week Review progress of WG12 projects New WG12 Deputy Convener – closed 1 June Address WG12 SEDS issues Review integration efforts of ISO /53/108/109 and other projects Module Team efforts within SC4 and WG12 Future ISO deliverables –2nd Edition of ISO –2nd Edition and/or Minor Revision of ISO

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 WG12 Plenary - Week Schedule Monday 1:00 - 3:00 WG12 Parametrics Meeting –Sixth (Final) Integration Workshop for Project Deliverables Tuesday 1:00 - 5:00 ISO /51/52/53 (EACM) –Integration and Review Workshop Wednesday 10:30 - 3:00 WG12 Plenary –Document Status & AIC/Module Coordination –SEDS Issues –Definition of Common Resources Wednesday 3:30 - 5:00 WG12/WG10 Modularization –Status and Actions Thursday 8: :00 WG8/WG12 Common Resource Items –ISO –Common Resources

ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 WG12 Plenary - Week Schedule Many Project Leaders will have meetings this week Check on-site agenda for meeting times