Price Responsive Load / Retail DR Data Collection Project and Lessons Learned Paul Wattles Karen Farley DSWG March 2014.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Time-of-Use and Critical Peak Pricing
Results from the 2013 Survey of LSEs to Obtain Retail DR and Dynamic Pricing information Public Summary Frontier Associates LLC June
Retail DR and Price Response 2014 Product Headcounts Paul Wattles, ERCOT Market Design & Development DSWG Feb. 3, 2015.
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 9, 2014.
The Benefits of Dynamic Pricing of Default Electricity Service Bernie Neenan UtiliPoint International Prepared for Assessing the Potential for Demand Response.
California Statewide Pricing Pilot Lessons Learned Roger Levy Demand Response Research Center NARUC Joint Meeting Committee on Energy.
RMS Update December 14,  Advanced Meter Settlement Impacts  January 2012 – ERCOT settling 4.4M ESIIDs using Advanced Meter data  January 2012–
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
Retail Smart Grid Trends Paul Wattles Senior Analyst, Market Design & Development UT Energy Week: “How Smart Grids Enable Consumers” Feb. 18, 2015.
Price Responsive Load / Retail DR Update to RMS Karen Farley June 3, 2014.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 2014.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Price Responsive Load Survey Draft Results Paul Wattles Karen Farley DSWG and RMS Aug. 22, 2012.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
ERCOT MARKET EDUCATION
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Retail Market Subcommittee Update to COPS Kathy Scott July 16,
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Advanced Metering’s Next Frontier: Demand Response Interim Report Advanced Metering Implementation Team/ ERCOT Demand Side Working Group February 2012.
10/13/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
Demand Response Status Report Calvin Opheim October 9, 2007.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
DSWG – March 9, 2015 Four-CP Response in ERCOT Competitive Area Carl L Raish.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish October 6, 2015.
Sept. 28, 2007 Interim Update Load Response Survey.
Price Responsive Load / Retail DR Workshop Paul Wattles Carl Raish Karen Farley REP Roundtable August 5, 2015 – Updates in RED.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
ERS Update – DSWG Presentation September 21, 2012.
Retail DR and Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley Updates to DSWG & RMS January 2013.
An Overview of Demand Response in California July 2011.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Price Responsive Load / Retail DR DSWG Update Paul Wattles Carl Raish September 17, 2015.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Price Responsive Load / Retail Demand Response 2013 Analysis Report Overview ERCOT Staff & Frontier Associates RMS Meeting August 5, 2014.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Status Report on DSWG Task 11: Retail DR/Dynamic Pricing Project Presentation to the ERCOT Demand Side Working Group Jay Zarnikau Frontier Associates LLC.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus 1SCED Load Participation Complete analysis.
RMS Update to TAC September 4, RMS Update to TAC August 13 RMS Meeting Summary: August 13 RMS Meeting Summary:
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
CEC Load Management Standards Workshop March 3, Update on the CPUC’s Demand Response and Advanced Metering Proceedings Bruce Kaneshiro Energy Division.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish September 1, 2015.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
1 City of Palo Alto Utilities Large Commercial Customer Pilot Demand Response Program Customer Meeting March 8, 2012.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
AMIT-DSWG Workshop ‘AMI’s Next Frontier: Demand Response Part 2’
Analysis of Load Reductions Associated with 4-CP Transmission Charges in ERCOT Carl L Raish Principal Load Profiling and Modeling Demand Side Working Group.
1 BGE Smart Energy Pricing Program: Update to Maryland Public Service Commission April 23, 2008 Wayne Harbaugh VP – Pricing & Regulatory Services.
Principal Load Profiling and Modeling
Reflecting Losses in DR within ERCOT August 22, 2012
Presentation transcript:

Price Responsive Load / Retail DR Data Collection Project and Lessons Learned Paul Wattles Karen Farley DSWG March 2014

2 Why it’s important to understand retail DR & price response Impacts of retail demand response and price response on the long term load forecast Advanced metering –Enablement of DR is an important element in the return on the AMI investment There are limits on the amount of DR that the ISO can contract for (e.g., Ancillary Services and ERS). –Also true of TDSP load management programs The bulk of new DR will likely need to be enabled by LSEs: –Price and 4CP-responsive Load –Other retail DR incentives and technologies Ability to track growth of these products is a key metric in measuring the success of the ERCOT retail market DR/Price Response

3 The need to dig deeper Phase 1 – Survey –Results shared with market in Aug 2013 (RMS and DSWG) Phase 2 – Data collection –Collected ESIID information from REPs Oct 2013 –Additional survey used to collect events from REPS –Phone calls with NOIEs Phase 3 – Analysis –After data collection, evaluation of price elasticity and how it affects: Load forecasting Wholesale market price formation Resource adequacy –Analysis will be at the aggregate, no specific market participant information will be shared DR/Price Response We are here!

4 Phase 2 – Data collection - REPs Thanks to the data collection & survey, now we know: –The number of premises on retail contracts for dynamic pricing and/or demand response Details collected in snapshot file received Aug 2013 –ESIID –Category –Direct Load Control Y/N Details collected in targeted surveys received Dec 2013 –List of dates and start/stop times for DR events –What type of notification (if any) Lessons Learned –Just a few (kidding) – please see slides DR/Price Response

5 Phase 2 – Data collection - NOIEs Each MOU/COOP has different programs, different reporting methods and different event analysis methodologies Challenge to quantify impacts and align with REP findings DR/Price Response

6 Pricing Events -- June DR/Price Response June 2013, North Load Zone

7 Pricing Events – July DR/Price Response 3000 July 2013, North Load Zone

8 Pricing Events – August DR/Price Response 3000 Aug. 2013, North Load Zone

9 Pricing Events – September DR/Price Response Sept. 2013, North Load Zone

10 Phase 3 – Analysis Part 1 ERCOT working with vendor for analysis –Defined approach, data requirements and deliverables for each category Other Load Control Real Time Pricing Block & Index Four Coincident Peak Peak Rebate –Short report with findings for each type of program analyzed –Final report on findings and results –Presentations to stakeholders –All data is anonymized and vendor signed NDA DR/Price Response

11 Phase 3 – Analysis Part 2 ERCOT analysis –Time of Use price offerings are designed to promote a behavioral shift in customers -- not considered event-driven DR Evaluation (currently deferred) would look at TOU premise usage vs. a non-TOU control group Need additional details (what are the hour blocks?) from REPs in order to analyze With 117,000 ESIIDs reported, statistical sampling likely needed –Other Voluntary Demand Response Product ERCOT will contact the REPs reporting ‘OTH’ products to better define the product types in future data collection exercises. Low volume of ESIIDs reported, but vast majority were C&I –Provide periodic progress reports to the market on an aggregated basis In future years, chart market growth in participation for each product type DR/Price Response

12 Lessons Learned –Did we have the right categories identified? No ESIIDs reported in the following categories –Critical Peak Pricing (CPP) –Financial Option (FO) Other Direct Load Control (OLC) –~ 10,000 ESIIDs reported in this category. Is this the correct definition? –OLC – Other Direct Load Control – contracts that allow the LSE or a third party to control the customer’s load remotely for economic or grid reliability purposes. This category applies to Direct Load Control (DLC) with different deployment criteria than described elsewhere. (Avoid double counting if DLC data was reported in other categories.) Did the yes/no flag of Direct Load Control create confusion when considered alongside OLC? DR/Price Response

13 Lessons Learned Lessons Learned - continued –Follow-up survey for event identification REPs were great in getting these back, but it would have helped to let them know in advance that the request was coming so they could plan workload What is the best way to collect this info in the future? –File management Some REPs contract with NAESB service providers -- submission of their files may have been delayed as service providers were not aware of need to transmit to ERCOT Resubmission to address errors in REP files –Example – 105 errors, 54 needed to be resubmitted – the others should not have been sent –What’s the best way to handle? Response file vs. validation file –Confusion on the difference between the two files -- are there improvements we can make in the technical specification file? DR/Price Response

14 Data Collection for 2014 – April Workshop Questions When is the right time to start receiving data for Summer 2014? –Is a June 15 snapshot still the right approach? –Or should we receive files more frequently? –Should a different schedule be considered to address error handling and customer churn? What category changes are needed? The event-related questions from Survey Monkey – would it work better to incorporate this into the data collection file? What error handling process improvements are needed? Do we need Protocol or Guide language? DR/Price Response

15 Data Collection for 2014 – April Workshop Questions What additional questions should be considered? Workshop –April 9 th or 10 th –MET Center and WebEx DR/Price Response

16 Questions? ON OFF DR/Price Response

17 Appendix - Definitions RTP – Real Time Pricing - retail prices based on ERCOT Real-Time Settlement Point Prices for the premise Load Zone, calculated every 15 minutes, or other real-time wholesale price indicator(s). B&I – Block & Index – fixed pricing for a defined volume of usage, coupled with pricing indexed to the wholesale market for usage exceeding the block. Block prices and volumes may vary by time of day/week. CPP – Critical Peak Pricing – contracts that call for prices to rise dramatically during critical peaks: limited duration, dynamically set periods of time that usually correlate to high prices in the real-time wholesale market. Critical peak events typically occur a limited number of times per year and typically are communicated in advance to participants. CPR – Critical Peak Rebates - contracts that pay rebates to customers for load reductions taken during defined during critical peaks (see above). DR/Price Response

18 Appendix - Definitions 4CP – Four Coincident Peak – predictor signals or direct load control provided to customers in advance of potential Four Coincident Peak (4CP) intervals during summer months (June through September). Reducing load during such intervals lowers transmission charges. –4CP charges apply to large customers (peak demand ≥700 kW) in competitive choice areas, and also to NOIEs at the boundary meter level. TOU – Time of Use - charges based on usage across defined blocks of hours, with prices and schedules known in advance. (As used here, does not apply to seasonal fuel factor-related rate adjustments). OLC – Other Direct Load Control – contracts that allow the LSE or a third party to control the customer’s load remotely for economic or grid reliability purposes. This category applies to Direct Load Control (DLC) with different deployment criteria than described elsewhere. (Avoid double counting if DLC data was reported in other categories.) OTH – Other Voluntary Demand Response Product – any retail product that includes a demand response incentive or signal not covered in the other categories. DR/Price Response