Permitting Offshore Wind Projects Bonnie Ram Energetics Incorporated Southeast and Mid-Atlantic Regional Wind Summit Raleigh, NC September 20, 2005 Research.

Slides:



Advertisements
Similar presentations
Massachusetts Ocean Management Plan SeaWeb/National Press Club MA Executive Office of Energy and Environmental Affairs Ian A. Bowles, Secretary Deerin.
Advertisements

Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
Overview of the Environmental Assessment for Lease Issuance and Site Assessment Activities off Rhode Island and Massachusetts July 16-17, 2012July 16-17,
How to Grow the U.S. Offshore Wind Industry Presented By Katherine A. Roek STOEL RIVES LLP February 24, 2010.
Sections 10 and 404: NMFS’ Oversight, Concerns and Actions
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Major Federal & State Approvals Environmental Business Council of New England Land-Based Wind Energy May 29, 2008 Ruth H. Silman, Esq.
Tidal Energy in Alaska Permitting Issues Michael Murphy Devine Tarbell & Associates.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
USDA Forest Service Agency Mission and Habitat Management
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
Coastal Zone Federal Consistency The most powerful permitting program you’ve probably never heard of…
Ocean and Tidal Energy Emerging Technologies: Permitting, Generation and Transmission Cherise M. Oram 2009 Environmental and Land Use Law Section Midyear.
Multi-Sector Ocean Use: Traditional and Alternative Energy MAFAC Meeting May 13, 2009.
1 Offshore Renewable Energy Leasing: Rhode Island March 2011 Maureen A. Bornholdt Program Manager Offshore Alternative Energy Programs Bureau of Ocean.
Harnessing the Power of Waves and Tides
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
Connecticut Department of Transportation Bureau of Policy & Planning.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Office of Renewable Energy Programs NAC-CESU Annual Meeting June 12, 2013 Mary C. Boatman, Ph.D. Environmental Studies Chief.
Regulation of Pipelines
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Environmental & Siting R&D Program Peer Review Meeting Bob Thresher & Karin Sinclair, NREL Laura Miner, DOE Bonnie Ram, Energetics Incorporated Golden,
Georgia’s Off-shore Wind Opportunities Presented by Bill Bulpitt and Rita Kilpatrick for Tybee Island City Council March 27, 2008.
Permitting & Policies of Wind on the Water – Great Lakes – Presented By Katherine A. Roek STOEL RIVES LLP June 16, 2009.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
FEDERAL OFFSHORE WIND “The Role of Planning in Federal Land Management” Shapiro Conference GW Law School, Univ. of Houston, and ELI March 14, 2014 Ned.
Chapter 45 Environmental Protection and Global Warming.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
The Multipurpose Marine Cadastre A Tool for Planning & Decision Making in the Marine Environment Christine Taylor Minerals Management Service (MMS) David.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
States’ Roles in U.S. Offshore Wind Development Presented By Katherine A. Roek STOEL RIVES LLP September 22, 2009.
Massachusetts Ocean Planning Process MREC Conference October 6, 2008.
= Yr NG price high point Data Source - AFDC. Natural gas prices historically have remained, in general, below crude oil prices, except during the winter.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1.  Offshore Siting Process / Guidelines – Macro View  Offshore Siting Example – VA  Offshore Development Example – VA Virginia Offshore Wind Technology.
1 Bureau of Ocean Energy Management Assessing Historic Properties and Cultural Resources in the Main Hawaiian Islands Dave Ball, MA, RPA Pacific Region.
Marine Spatial Planning for Wave Energy Development in Oregon Kate Sherman, M.S. Candidate Marine Resource Management College of Earth, Ocean, and Atmospheric.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
MMS Alternative Energy Program November 28, 2007.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
17 October 2015www.CapeWind.org1 Project UPDATE March 25, 2009.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
WIND ENERGY SITING REFORM LEGISLATION Kenneth Kimmell, General Counsel, Executive Office of Energy and Environmental Affairs.
Coastal Management Issues and Strategies: State and Municipal
Multiple Use Issues on the Outer Continental Shelf Walter Cruickshank, Deputy Director Minerals Management Service, Department of the Interior Capitol.
1 Overview of Minerals Management Service’s Alternative Energy Program Ocean Law Conference May 22, 2008 Seattle, WA Walter D. Cruickshank Deputy Director.
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
Department of Commerce Workshop San Juan, Puerto Rico 17 November 2009 Laura Furgione Assistant Administrator for Program Planning and Integration National.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Siting Ocean and Tidal Energy Projects Cherise M. Oram STOEL RIVES LLP Oregon Law Institute Going Green: Advising Clients in the New World of Sustainability.
Managing Through Partnerships Ralph Cantral NOAA’s Ocean Service September 5, 2003.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
A Presentation By Student Ocean Advocates. The New York/New Jersey Bight: Our Little Sea in the Big Ocean The NY/NJ Bight NY/NJ Bight - Waters from Montauk.
1 Energy Policy Act of 2005 Amended Section 8 of OCSLA Amended Section 8 of OCSLA Gave MMS authority over offshore renewable energy leasing Gave MMS authority.
Isis Johnson Environmental Protection Specialist Bureau of Ocean Energy Management Office of Renewable Energy Programs April 28, 2016.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
COSA Committee Meeting
Barriers and Challenges to Developing Renewable Energy Projects
Offshore Oil and Gas Environmental Issues
COSA Committee Meeting
Michigan Dept. of Environmental Quality Water Resources Division
SEQRA as a Tool to Review Energy Projects
Application of Natural Resource Laws
WIND ENERGY SITING REFORM LEGISLATION
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Chapter 45 Environmental Protection and Global Warming
Presentation transcript:

Permitting Offshore Wind Projects Bonnie Ram Energetics Incorporated Southeast and Mid-Atlantic Regional Wind Summit Raleigh, NC September 20, 2005 Research sponsored by the National Renewable Energy Laboratory

Energetics Role Assist NREL in supporting the Department of Energy Office of Wind Assist NREL in supporting the Department of Energy Office of Wind Track environmental policies and laws in the U.S. and Europe Track environmental policies and laws in the U.S. and Europe Review existing marine research Review existing marine research Assist in organizing technical workshops Assist in organizing technical workshops Collaborate with U.S. Army Corp of Engineers & Minerals Management Service Collaborate with U.S. Army Corp of Engineers & Minerals Management Service Track local permit applications & projects Track local permit applications & projects

Results to Date Literature review Literature review Review of environmental regulations & permits Review of environmental regulations & permits Summary of European environmental studies Summary of European environmental studies Technical Workshops Technical Workshops Stakeholder Dialogue Meeting (2003)Stakeholder Dialogue Meeting (2003) Boston Technical Tutorial Meeting (September 2003)Boston Technical Tutorial Meeting (September 2003) Deep Water Technologies Workshop (2003/2004)Deep Water Technologies Workshop (2003/2004) MMS Wind Tutorial (August 2005)MMS Wind Tutorial (August 2005)

Factors Determining Applicable Regulations Project Size, Location and Construction State/Federal Ocean Boundaries Landfall Grid Connection Sensitive Marine/Land Areas Avian and Marine Species Activities and Uses of Project Area

Ocean Jurisdictions S h o r e l i n e 24nm Contiguous Zone Not to Scale 12nm Territorial Sea 12nm Federal Boundary 3nm State Boundary Note: TX & Gulf coast of FL state boundaries are 9 nm 200 nm Exclusive Economic Zone International boundaries

Primary Jurisdictions in the Ocean U.S. Army Corp of Engineers (USACOE) Department of Defense –Navigational obstructions in federal waters (Section 10) –No longer the lead agency for offshore wind permits –Approvals for transmission lines Minerals Management Service Department of Interior –Oil and gas leasing –Sand and gravel program –Energy Policy Act of 2005 gave MMS lead agency status for permitting of non-extractive energy facilities on the OCS 270 days to develop new regulations Interim guidance for new projects

Selected Federal Regulations Legislative Authority Major Program/PermitLead Agencies Energy Policy Act of 2005 amended Outer Continental Shelf Lands Act Designated MMS as lead authority for alternative uses of the OCS. Jurisdiction over leasing rights for minerals production. Minerals Management Service of the Department of the Interior Federal Power Act Issues license for any type of electric power generation within/or on navigable waters; interconnection is parallel process FERC Rivers And Harbors Act - Section 10 Regulates all structures and work in navigable water of the U.S Extended out to 200 nm under the OCSLA for fixed structures/artificial islands U.S. Army Corps of Engineers (District Office) National Environmental Policy Act (NEPA) Requires submission of an environmental review for all major federal actions that may significantly affect the quality of the human environment U.S. Army Corps of Engineers (District) Council on Environmental Quality Coastal Zone Management Act Jurisdictional rights to states to review activities that may affect the state’s coastal resources State Coastal Zone Management Agencies Navigation and Navigable Waters Navigation aid permit (requirements for markings and lighting) U.S. Coast Guard

Selected Federal Regulations Legislative Authority Major Program/PermitLead Agencies Navigational Hazard to Air Traffic Determination of the safe use of airspace from construction start (requirements for lighting) U.S Federal Aviation Administration (Regional Administrator) Migratory Bird Treaty Act No “taking” or harming of birds determination Fish and Wildlife Service Migratory Bird Conservation Commission National Historic Preservation Act Consultation on the protection of historic resources — places, properties, shipwrecks Department of the Interior State Historic Preservation Offices Magnuson-Stevens Fishery Conservation & Management Act Conserves & manages fish stocks to a 200-mile fishery conservation zone & designates essential fish habitat National Marine Fisheries Service (Commerce) National Marine Sanctuary Act (Title III) Designates marine protected areas National Ocean Service (within NOAA) Endangered Species Act Consultation on action that may jeopardize threatened & endangered (listed) species or adversely modify critical habitat. Fish & Wildlife Service (Interior) National Marine Fisheries Service

Selected Federal Regulations Legislative Authority Major Program/PermitLead Agency Clean Water Act Regulates discharges of pollutants into the waters of the United States U.S. Environmental Protection Agency Marine Mammal Protection Act Prohibits or strictly limits the direct of indirect taking or harassment (Permits may be sought for “incidental take”) Fish & Wildlife National Marine Fisheries Service Submerged Lands Act Granting states a title for public lands/natural resources held in trust by the government Minerals Management Service Estuary Protection Act Conserves estuarine areasFish and Wildlife Service

Significant Role for State and Local Authorities Selected State Permits & Approvals Selected State Permits & Approvals –Environmental Quality Review Boards (NEPA analysis) –Coastal Zone Management Programs –Siting Boards for Energy Facilities and Transmission Lines –State Parks, Forests, and Cultural & Historic Resources –Tidal Wetlands, Coastal Erosion Hazard, Water Quality Assessing Environmental and Health Benefits Assessing Environmental and Health Benefits –Renewable Portfolio Standards requirements –Clean Air Act Local Land Use Entities Local Land Use Entities –Town Planning Boards –Zoning Boards –By-laws (e.g., setbacks)

U.S. Army Corps of Engineers Section 10 Permit Process Day Public Notice Complete For Processing Application Submitted Final Decisions by District Issued Denied May be Appealed to Division May Need Public Hearing Comments By Agencies, Interested Groups, Public Full Public Interest Review Environmental Regulatory Review and Project Evaluation Reference: Adapted from USACE presentation, Christine Godfrey

U.S. Army Corp of Engineers Permit and NEPA Process Reference: Adapted from USACE presentation, Karen Adams

Community Involvement Primary Objective of the Permit Process is Public Involvement Primary Objective of the Permit Process is Public Involvement –Assessing public interest –Educating broad group of stakeholders –Uncertainty of potential impacts on the human & physical environment  Viewshed  Environmental tradeoffs –Economic benefits

Permitting Unknowns Transition from USACOE to MMS –NEPA documents –Risk assessment –Standards and codes Interim Guidelines for New Projects Designating Planning “Zones” Public Involvement Leases, Fees and Royalties

Status of USACOE Offshore Wind Applications ApplicantProject LocationApplication Filed Status Cape WindNantucket SoundNovember 2001 Draft EIS issued November 2004 Bald Eagle Power Long Island SoundMay 2002Application on hold GreenlightLake ErieMay 2003Project on hold WinergyPlum Island, NYJune 2003Incomplete Application WinergySmith Island, VAJuly 2003Application administratively withdrawn Winergy4 sites in New Jersey NAPre-application meeting Nov 2002 WinergyIndian River, Delaware NAPre-application meeting Feb 2003 LIPA & Florida Power and Light Long Island SoundJuly 2005Utility awarded the competitive project; joint application filed

Offshore Wind Project Anatomy Site and Feasibility Assessment 1-year Pre- construction and Permitting 1-3 years?? Construction – Installation – Commissioning 1+ years Operation and Maintenance 20-years Decommission or Re-power >1-year

Potential Effects/Benefits Viewshed Sea mammals Fisheries Avian Hydrography & Coastal effects Seabed Artificial Reef Socioeconomics Community ownership Noise/Vibrations Radar/Radio Disturbances (military/commercial uses) Transmission Lines Subsea Cables Electromagnetic Fields Navigation & Risk collision Air Traffic Safety Marine Archaeology Cumulative Effects (e.g., air quality)

Site Assessment – Micro-siting Capewind MET Tower 60-m Capewind Avian Radar Wind/Wave Design Basis

Cape Wind Nantucket Sound 468 MW = MW GE turbines About 24 square miles Two lawsuits Meteorological Tower installed Draft EIS issued (Nov. 04) Lack of political support

Cape Wind Project Status Federal Jurisdiction – ENF/USACOE application filed – fall 2001 – DEIS/DEIR – released November 2004 Currently reviewing 5000 comments State Jurisdiction – Energy Facility Siting Board filing – fall 2002 Decision approving the Cape Wind project was released May 2005 – CZMA determination pending

Long Island Power Authority Long Island Sound  MW  LIPA - a municipal utility Guaranteeing purchase power agreement Substation construction  Early public involvement process  Strong state political support  LIPA selected FPL Energy as the developer May 2004

Long Island Power Authority Jones Beach April 2005 Section 10 permit application –Public comment period ended August 12, 2005 –Imminent NEPA decision 3/2004 – Aerial & boat surveys weekly during migration seasons & monthly in off-season through next spring Marine radar – 9/2005 Onshore and Offshore fall and spring Construction start April 2008

Consistent Policy Needed! Muddled institutional & legal boundaries –Jurisdictional control shifted to MMS August 2005 –New regulations by May 2006 No national offshore wind strategy –Federal agencies setting their own policies –Lead role for States (MA, NY, NJ) –Regional collaboratives

Uncertainties Regulated Species & Habitats –Ecological risk assessment methods –Best available data & standards –Quantified environmental benefits –Cumulative effects No national experience with the technology –Need for education and debate Market-driven development requires due diligence - Land speculators

Learning Curve History of land-based permitting –Siting criteria is critical –Need standardized protocols –Lack of baseline data Need collaborations between industry, government & NGOs to define & fund studies Viewshed is important –Not near my beach! –“Put it further away in deeper water!”

Recommendations for State Agencies  Verify Offshore Wind Resource  Conduct Feasibility Studies Designate development zones & map exclusion areas  Establish Strategic Planning Team  Establish One-stop Shop for Permitting  Leverage Resources for Baseline Studies  Involve Stakeholders Early  Consider Costs and Benefits

THANK YOU