THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.

Slides:



Advertisements
Similar presentations
2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
Advertisements

Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
Polar – THEMIS Collaboration Opportunities Spacecraft Locations post launch Magnetopause campaign? Conjugate studies with THEMIS Ground Stations C. T.
Constellation Orion Visible Light Constellation Orion Infrared Light.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Current status of A. Matsuoka, Y. Miyoshi, I. Shinohara, T. Takashima, K. Asamura, and ERG project team ERG project ERG project Van Allen Probes SWG 2014/09.
THEMIS Mission Readiness Review
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
GSFC 5 Space Technology “Tomorrow’s Technology Today” ST5 PDR June 19-20, 2001 Launch Vehicle Services Section 18.0 Clyde Woodall Launch Vehicle Manager.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS FDMO CDR Peer Review − Pre-Launch Operations 1June 1-2, 2004 Pre-Launch Operations Mark Lewis.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
THEMIS and ARTEMIS David G. Sibeck THEMIS Project Scientist NASA/GSFC 2/17/2007 Cape Canaveral.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS : RESOLVING THE PHYSICS OF ONSET AND EVOLUTION OF SUBSTORMS OBJECTIVE: Study energy releases from Earth’s magnetosphere known as substorms (magnetic.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
THEMIS FDMO CDR Peer Review − FOT Activities 1June 1-2, 2004 FOT Activities Mark Lewis.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
Magnetospheric MultiScale Mission (MMS) Overview
THEMIS FDMO CDR Peer Review − L&EO and Normal Operations 1June 1-2, 2004 L&EO and Normal Operations Manfred Bester.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS FDMO Review Propellant Budget Update − 1 October 5, 2004 PROPELLANT BUDGET UPDATE Vassilis Angelopoulos Covered in this presentation: Allocations.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
THEMIS SOCScience Data Products − 1March 29, 2006 Science Data Products Timothy Quinn.
THEMIS/ GBO SciRR splinter 1 UCB/SSL, 06/02/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Telemetry Processing and Archiving − 1 Telemetry Flows, Processing and Archiving.
THEMIS FDMO Review Mission Design Update − 1 October 5, 2004 Mission Design Update Sabine Frey.
GOES Data Status Mutual Benefits of NASA THEMIS and NOAA GOES
FDMO Peer Review RFA Summary
Solar Probe Plus FIELDS
THEMIS MISSION PRE-SHIP REVIEW
Mission overview: two spacecraft that target key radiation belt regions with variable spacing
University of California - Berkeley
Mission Operations Requirements
THEMIS program: an Overview
THEMIS MISSION PRE-SHIP REVIEW
Significant results from 2 years of operations
SDO Flight Dynamics Subsystem
Launch and On-orbit Checkout
The Deorbiting of GOCE – A Spacecraft Operations Perspective
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager

THEMIS FRRSC - 2 KSC, Feb 12, 2007 Mission Overview Flight Systems Processing Ground Systems Reviews Summary Agenda

THEMIS FRRSC - 3 KSC, Feb 12, 2007 Probe conjunctions along Sun-Earth line recur once per 4 days over North America. Ground based observatories completely cover North American sector; can determine auroral breakup within 1-5s … … while THEMIS’s space-based probes determine onset of Current Disruption and Reconnection each within <10s. : Ground Based Observatory Mission Science

THEMIS FRRSC - 4 KSC, Feb 12, 2007 Launch Vehicle:Delta II, Eastern Range Apogee: km ± 9567 km Perigee:435 km ± 10 km (500 km ± 7 km on or after 3/1/2007) Inclination:16.0 deg ± 0.5 deg Date:February 15, 2007 Space Segment Spacecraft:5 Spinning Probes with Fuel for Orbit & Attitude Adjust Instruments:3-Axis Electric Field, Magnetic Field 3-D Ion & Electron Particle Detectors Spin Rate:20 RPM Orbit Period(s):1, 2 and 4 days Orientation:Ecliptic Normal Ground Segment Observatories:20 Northern with All Sky Imagers and Magnetometers Control Facilities:Mission and Science Operations Centers Operations Phases:L&EO, Cruise, Ascent, Campaigns, De-orbit Lifetime:2.3 years Mission Summary

THEMIS FRRSC - 5 KSC, Feb 12, 2007 Instrument Configuration IDPU: Instrument Data Processor Unit SPB : Spin Plane Booms (4x) AXB : Axial Booms (2x) SST : Solid State Telescope (2x) ESA : Electrostatic Analyzer FGM : Fluxgate Magnetometer SCM : Search Coil Magnetometer

THEMIS FRRSC - 6 KSC, Feb 12, 2007 Fuel Tank ESA EFI SPB Thruster T1 EFI Axial Booms (2, Stowed) Battery BAU Repress Tank Miniature Sun Sensor Transponder Thruster T2 IDPU Fuel Tank Antenna EFI SPB Thruster A1 Thruster A2 AEB Gyros Probe Configuration

THEMIS FRRSC - 7 KSC, Feb 12, 2007 Standard Delta 10 ft. Fairing Static Envelope 3712 PAF Probe Carrier Assembly (PCA = 5 Probes + Probe Carrier) on L/V Probe Carrier Assembly (PCA = 5 Probes + Probe Carrier) on L/V THEMIS Launch Configuration Probe Carrier Assembly (PCA) on Delta 3 rd Stage Launch Configuration Dedicated launch accommodated within standard Delta vehicle configuration and services 10’ Composite Fairing required to accommodate five Probes on the Probe Carrier in the “Wedding Cake” configuration PC stays attached to Delta 3 rd stage after probe dispense Each probe dispense from the PCA is coordinated with but independent of the other probes No single probe anomaly precludes dispense of remaining probes Star 48 3 rd Stage

THEMIS FRRSC - 8 KSC, Feb 12, 2007 Environments Thermal Vacuum Acoustics Spin Balance EMC Vibration Magnetics

THEMIS FRRSC - 9 KSC, Feb 12, 2007 Probe Processing Bolt Cutter Installation Performance Tests Solar Array Illumination Delivery to ASO

THEMIS FRRSC - 10 KSC, Feb 12, 2007 Probe Fueling Vibration Thermal Vacuum Acoustics Spin Balance Storage Dry Weigh & Pressurize Fueling

THEMIS FRRSC - 11 KSC, Feb 12, 2007 PCA Processing Vibration Acoustics Spin Balance Storage SSS Installation Ready for Probes Final checks Spin Balance PCA Integration Fairing Installation

THEMIS FRRSC - 12 KSC, Feb 12, 2007 Ground System Diagram Ground System Elements Ground Stations Ground Network Space Network Mission Operations Center Science Operations Center Flight Dynamics Center Including Mission Design Orbit & Attitude Determination Maneuver Planning Limit Detection and Notification Network Security

THEMIS FRRSC - 13 KSC, Feb 12, 2007 Mission Operations Center BGS Antenna, Equipment Racks and FOT Workstations at the Mission Operations Center

THEMIS FRRSC - 14 KSC, Feb 12, 2007 Ground Stations Ground Station Station Designator Figure of Merit LocationFunction Berkeley, CABGS 11-m24.0 dB/K ° N ° W Primary TLM/CMD/TRK Wallops Island, VAWGS 11-m23.0 dB/K ° N ° W Secondary TLM/CMD/TRK Merritt Island, FLMILA 9-m 1/221.6 dB/K ° N ° W Secondary TLM/CMD/TRK Santiago, ChileAGO 9-m21.6 dB/K ° S ° W Secondary TLM/CMD/TRK Hartebeesthoek, SAHBK 10-m20.4 dB/K ° S ° E Secondary TLM/CMD/TRK Mission Supported by 5 Ground Stations Ground Stations: BGS, WGS, MILA, AGO, HBK GN, SN and FDF Support Documented in PSLA All Stations Have Successfully Flowed Data with MOC

THEMIS FRRSC - 15 KSC, Feb 12, 2007 LEO Acquistion LEO Acquisition Multiple Ground Assets Have Good View Following Launch Probe Attitude Around 1:30 MET is Poor for Telemetry Probes Contacted at 4Kbps for 5 Minutes each from 1:20 to 1:40

THEMIS FRRSC - 16 KSC, Feb 12, 2007 Mission Profile

THEMIS FRRSC - 17 KSC, Feb 12, 2007 LEO Early Orbit Early Orbit Activities TDRSS Pass to Observe Separation at T+73 min Round-robin Contacts –Starting at T+81min, Each Probe Will Be Contacted for 5 Mins –Expected Battery SOC to Remain > 87% Initial Orbit and Attitude Determination –Record and Process Two-way Doppler Data –Perform Attitude Determination in Real-time –Both UCB and GSFC FDF Function in Parallel Round-Robin Checkout of Key Systems on Each Probe –Reaction Control System Readiness –Attitude Sensors Functionality Perform Attitude Maneuver to Ecliptic Normal Systematic Instrument Power-up and Check-out –Leads to Decision of Probe Orbit Placement in Appx 26 Days

THEMIS FRRSC - 18 KSC, Feb 12, 2007 Ground Based Observatories UCB has Delivered All 20 GBO (GMAG and ASI) units 19 Have Been Installed, 1 Needs Repair Automatic Data Collection and Archiving in Progress Remote Commanding and Diagnostics Working Expect to be Fully Functional at Winter 2008 Courtesy H.Frey, UCB Geographic Longitude 324° Geographic Longitude 195° Geomagnetic North Pole Geographic North Pole

THEMIS FRRSC - 19 KSC, Feb 12, 2007 IIRT RFA Status IIRT Performed 27 Formal Reviews of THEMIS IIRT Issued 308 Requests for Action Project Completed all 308 IIRT Concurred on all 308 Final Two Closed since MRR RCS Proof Launch Window Analysis

THEMIS FRRSC - 20 KSC, Feb 12, 2007 Reviews Ahead

THEMIS FRRSC - 21 KSC, Feb 12, 2007 Summary Issues  Bolt Cutter Taping – Closed  P1115 Connector Demated – Closed  PCA-3 rd Stage CG Offset – Closed Summary Status  Probes and Probe Carrier are Flight Ready  Mission Operations is Complete  Launch Team and Operations Teams are Ready Readiness Statement  THEMIS is Ready to Continue Processing for Launch