Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Harkness Career Center
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Mini Jet Sample Dyeing M/C Daelim Starlet Co., Ltd.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
GERDA: GERmanium Detector Array
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Status of EXO-200 Carter Hall, University of Maryland DUSEL town meeting November 4, 2007.
GD150 Liquid bulk contactless compressor. GD150 Compressors.
Platzhalter Bild Vacuum Transfer System for loading the Sartorius Prototype Mass Comparator CCL1007 Thomas Fehling, NCSLI-Conference, Washington D.C.,
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
GERDA General meeting, Krakow, Poland 222 Rn measurements H. Richter, H. Simgen, G. Zuzel Max-Planck-Institut für Kernphysik, Heidelberg.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Some technical aspects of testing and adaptation of existing detectors.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Task Group 2 Iris Abt, Michael Altmann, Kevin Kroeninger, Bela Majorovits, Franz Stelzer, Xiang Liu 1.Detector Development 2.Suspension & Cabling 3.MC.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Mechanical Designs of The Central Detector Jinyu Fu
Ge Test-stands at MPI Munich Xiang Liu 1.General 2.Crystals, Test-stands & Results 3.Outlook.
Cracow Epiphany Conference on Physics in Underground Laboratories and its Connection with LHC Cracow, Poland The GERDA Experiment at Gran.
TG 11 overview / Material screening Hardy Simgen MPI für Kernphysik for Task Group 11.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Vicon subsoiler - Terra PL Product Information 2013.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Concept Design for LBNF Far detector (LAr single phase)
GERDA – a Search for Neutrinoless Double Beta Decay MPI für Physik, München Neutrinoless double beta decay and the GERDA experimentThe detector array and.
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Phase I: Use available 76 Ge diodes from Heidelberg- Moscow and IGEX experiments (~18 kg). Scrutinize with high siginificance current evidence. Phase II:
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
MPI für Physik, Fachbeirat, Béla Majorovits The GERDA experiment Béla Majorovits.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
6/27/2007 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Final Design Cryogenic and mechanical configurations
SPL RF coupler: integration aspects
NA62 LAV Anti1 REMOVAL & TESTS
HFM Test Station Main Cryostat
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Proximity Cryogenics P&IDs meeting
GERDA Collaboration Meeting,
Test box for ProtoDUNE SP – Integration Test
Challenges for FCC-ee MDI mechanical design
Transmission system of Automobile
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Enrobing+ wheelmachine 50Kg
GERDA Test Stands for Segmented Germanium Detectors
Presentation transcript:

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector Handling and Transport Infrastructure Clean Room Lock System Functionality Pogo Pin Contacts OUTLINE: Béla Majorovits Max Planck Institut für Physik, München, Germany

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 2 GERDA Mission Statement Popularity of the name GERDA in norway Taken from

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 3 GERDA detector holder: phase I

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 4 GERDA detector holder: phase II Material balance: 31g Cu, 7g Teflon, 2.5 g Kapton cable Novel low mass contacting scheme with Cu on Kapton. Low mass holder is suitable for 20 kg load at LN temperature I. Abt. et al, NIM A 577(2007)574, nucl- ex/ Immersing of string into lN without substantial movement within reasonable time

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 5 GERDA detector handling Minimize risk of damage by touching: Design allows for touch free transport, mounting and dimounting into test stands and into experiment Easy to move: just like drinking coffee Easy to store: just like cooking your goulash

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 6 GERDA Detector Transport Maximum safety for necessary journeys envisioned  Use same system as for most precious thing transported in cars: System successfully tested: prototype-detector safely transported from Mainz to Munich

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 7 Detector array Liquid argon Cryostat (steel + Cu) Water tank (steel) Muon veto (Č) GERDA Lock systemClean-room  Load detectors from top of the tank through clean room area

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 8 GERDA: the clean room Class clean room Underneath flow boxes class 100 Detector storage Test stand Air shower Material lock Mounting station

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 9 Cable Arms Service Flanges Space for pumping stations Circular shutter body Magnetic transfer arms The Clean Room and the Lock Inner lock

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 10 The Lock Rectangular shutters Signal Feedthroughs as close to the cable arms as possible. Outer lock Magnetic transfer arms

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 11 Detector Integration: Rail system Magnetic transfer arm Wheel gear Cable car Rail toward outer lock

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 12 Loose pulley sliding on a guiding rail Cable winch Overhead pulley Strain relief HV and signal cables, Steel cables holding the detectors Ge-crystals Side view Total length between overhead pulley and final crystal position: ~7m Two steel cables to have a fixed angle position of crystal relative to vertical axis 33mm Detector Integration: Rail system

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 13 Detector Integration: String Pulley It is tricky to bring down strings without any torsion --> use torsion resistent guide chain (Kabelschlepp) made of stainless steel Electrical motor drives the winch

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 14 Towards overhead pulley Towards crystal Contacting Within the Lock Pogo pin contacts NiAu plated copper pad surface Laser welded connection to cables to outside world Kapton cable towards front end electronics

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 15 Conclusion Due to external requirements: very tricky mechanisms Technical solutions for all processes exist Technical realization well under way Only little and only screened materials used (stainless steel and Teflon) There will come a time when we can relax and the name GERDA will be popular again

Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 16 Phase II storage infrastructure Pressure gauge Safety valve Flow controller to exhaust line Exhaust line Flushing line Towards Pumping line Detector storage system built at MPI Munich for our prototype detectors.