1 ‘Ohana Delay Line Installation at the summit Friday, October 13th 06 Pierre Fedou, LESIA.

Slides:



Advertisements
Similar presentations
11 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Current status (Experiments in Toshiba, Susupension model, Sapphire fibers,
Advertisements

Line Efficiency     Percentage Month Today’s Date
MINERvA Module Assembly Prototyping Report Jaewon Park University of Rochester MINERvA Collaboration Meeting, July 29-30, 2005.
MONALISA installation at the ATF2 ATF2 weekly meeting.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
Telescope Integration and Tests Tuesday Afternoon.
Wall Framing Grimsby Secondary School Technology Dept.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Avatar Explore PROPOSAL NUMBERS Not available SCIENCE TEAM Erick Dupuis, Canadian Space Agency RESEARCH OBJECTIVES Demonstrate an operational and technical.
Jan 2016 Solar Lunar Data.
Drive-Laser Commissioning Status and Plans
CLIC module working group
Outline ideas/status K.A. Strain

INSTALLATION SEQUENCE
CMS Area Working Group Meeting
Gingin Advisory Committee Meeting 08 Dec 2009
F. Ronchetti, INFN-LNF, September
HCAL Modules -First Ideas
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Average Monthly Temperature and Rainfall



Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com




Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Area Of Composite Shapes
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Mowrey Hall Renovation
Presentation transcript:

1 ‘Ohana Delay Line Installation at the summit Friday, October 13th 06 Pierre Fedou, LESIA

2 Agenda 1.Background 2.Delay Line Installation 3.Road Map

3 Background ‘Ohana will connect CFHT and Gemini telescopes Via a fiber link Main sub systems: - Injection modules - Optical fiber links - Delay Line,  our topic today - Beam combiner and IR camera

4 Background CFHT Jun and Aug 02, J, H, K band Keck I, Dec 02, K Gemini, Jul 03, H, K Injection modules status

5 Background Keck, installation Aug 04 Tests: Dec 04, Jun 05, K band May 06, H and K Fiber link status

6 Background Jun 03 & Oct 03 on IOTA, H, K band Jun 06, J, H, K Beam combiner & IR camera status

7 Delay Line Designed in 03 and before Built and tested, in France, mid 04 to mid 06 Now ready to be re-installed at CFHT

8 Delay Line Input #1 Input #2 Output #1 Output #2 Central carriage Translating stage Fast scan

9 Delay Line 3 or 4 missions of 3 weeks Oct 06 Hardware Jan 07 Opto-mechanical & first lignment Mar 07 Alignment continued May 07 Optional

10 Delay line subsystem Translating stage Aerotech Translating stage Schneeberger Central carriage Railways 6 metallic frames Fast Scan One computer

11

12 Dec 03 Module #1, version 1.0

13 New Module #1 Stone

14 SchneeBerger end Aerotech end Control command

15 Module #6 Module #5 rails Schneeberger trans. stage Schneeberger end, looking outside Central carriage

16 Central carriage Module #3 rails Schneeberger end, looking inside Module #5 Module #4

17 Aerotech end, looking outside Aerotech translation stage Module #1 Driving belt MeterDrive Stone

18 Aerotech end, looking inside Stone Aerotech Module #1

19 Delay line Our goals for this mission Opening crates Moving “big hardware” in Coude Room Make first alignment of structure Rails positioning 1 mm over m

20 Here is the line just before leaving Delay line

21 Delay line And now at the summit

22 7 crates: metallic frames Aero metallic frame Schnee metallic frame Rails Aerotech on its stone bed The 7 th crate concerns injection modules Delay line Open question: where do we stock this 7th? Closed? Opened?

23 Delay line OK, let’s open crates! Nail draw Hammer

24 Delay line One module weighs ~80 kg and is 210 cm long One crate, two modules

25 Delay line Small parcels

26 Delay line rails Small parcel

27 Delay line wedges Need a (transportable) lifting jack

28 Delay line Thermal soldering Metallic paper

29 Delay line Vacuum cleaner Thermal soldering

30 Delay line Stabilized air Plastic film

31 Delay line In progress Ready to be closed Wedge

32 Delay line Wall of wood Wedge

33 Delay line Need a Nail Puller? Electric Hammer

34 Delay line Plastic film Roof of wood

35 Delay line We did it!

36 Delay line Aerotech side Schnee side Beam combiner Table Total Length = 14390mm Total Width = 930mm

37 Delay line Beam combiner Table

38 Delay line Week #1, Monday 16th : crates opened and all heavy parts moved in the Coude Room, Day Crew and Meudon Week #2, Monday 23rd : small pieces are moved and alignment made by Meudon Week #3, Monday 30th : continued, overturning, extra time just in case…

39 Road map Delay Line installation: Oct 06 -> spring 07 Injection Modules: time has been asked on Keck Fiber Link beetween Gemini and CFHT: summer 07 Beam Combiner installation: spring to summer 07 Determination of length of the base: on going effort with IGN and OCA First light: when ready, fall 07?