CFLRP MONITORING Pike & San Isabel National Forests & Cimarron & Comanche National Grasslands 2013 FIELD TRIP September 13, 2013 Front Range Round Table.

Slides:



Advertisements
Similar presentations
Dry-conifer Ecology and Silviculture in Western Oregon John D. Bailey Oregon State University.
Advertisements

Temporal and Spatial Invasion. Time Generation and ‘a half’ Field invasion Large fires First generation poor wood quality – “wolf trees”
Thinning intensity studies and growth modeling of Montana mixed conifer forests at the University of Montana’s Lubrecht Experimental Forest Thomas Perry.
Fuels Reduction and Wildlife Habitat Restoration in a Late Successional Reserve Klamath National Forest, Goosenest Ranger District.
Sustainable Landowner Options for Aspen Forests Charly Ray, Northern Ecosystem Services Jason Fischbach, UW-Extension June 8, 2013.
Management of Loblolly Pine By Don Handley, Handley Forestry Associates Slideshow of loblolly management in North and South Carolina as practiced by Handley.
SPATIAL HETEROGENEITY SUB-GROUP UPDATE THURSDAY 23 RD JANUARY 2014 YVETTE DICKINSON.
Overstory and understory vegetation management to meet fire resilience and wildlife habitat objectives Eric Knapp, Becky Estes, and Carl Skinner U.S. Forest.
Silvicultural experiments exploring linkages between stand structural diversity and ecological variables in California Carl Skinner, Martin Ritchie, Eric.
Fuel Management Objectives within Dry Forest Landscapes on the Okanogan-Wenatchee NF Dr. Richy J. Harrod Okanogan-Wenatchee National Forest.
FVS Regeneration Imputation Don Vandendriesche USDA Forest Service Forest Management Service Center Growth and Yield Group.
By: Rachel. Where the park is located The Great Sand Dunes National Park is located in parts of Alamosa County and Saguache County in Colorado, in the.
Mixed Conifer Forests. * ~8,000-10,000 ft elevation * inches of precipitation/annually * very complex and heterogeneous in structure, composition,
Forest Pests and Diseases near Lewistown, MT Amy Eckert Forest Pathologist.
Using FIA Data to Strategically Assess Fire Hazard and Management Opportunities in Montana and New Mexico Charles E. Keegan III The University of Montana.
Mapping of stress on native tree species across western U.S.A. & Canada: interpretation of climatically-induced changes using a physiologically-based approach.
Delleker North Hazardous Fuel Reduction Fuels & Fire Behavior Assessment Project Funded by the Plumas NF with USDA Forest Service’s “Community Protection”
Use of FVS for a Forest-wide Inventory SPOKANE INDIAN RESERVATION.
Growth and yield Harvesting Regeneration Thinning Fire and fuels.
Sustainable Forest Management on the Yakama Reservation.
Cruise Design Measurement Computations. Determined by 1.Value of product(s) 2.Variability within the stand 3.Budget limitations Sampling Intensity.
CLASS UPDATES Office hours: Fridays 9AM-12noon (or me for an appointment) Powerpoints – on class website Schedule changes: thesis statement, outline,
FRONT RANGE ROUNDTABLE Q2-13 QUARTERLY MEETING Pike & San Isabel National Forests & Cimarron & Comanche National Grasslands IMPLEMENTATION UPDATE 2010.
 Discuss silvicultural principles related to restoration/fuels treatments  Compare conditions from the 1900 Cheesman Lake reconstruction to current.
DFC: Desired Future Condition Forest Practices Board March 31, 2009 Chuck Turley/Lenny Young.
A Scientific Basis for Ecological Restoration and Management of Ponderosa Pine and Dry Mixed-Conifer Forests of the Colorado Front Range Context Need for.
Impact of Aspect on Stand Density and Species Frequency in Gordon Gulch Brian Owens II University of Colorado, Boulder.
Comparing Pre-settlement, Pre-treatment and Post-treatment Stand Structure at Lonetree Restoration Site: Incorporating GIS into Restoration By Christine.
The Ecology of Planting Design The North American Deciduous Forests.
Prosperity Through Unity Research Project Healing the Land – An Elders Prospective.
Bringing stand level fire risk to the landscape level: Fire risk assessment using FFE-FVS with the Landscape Management System. Kevin Ceder And James McCarter.
Wolf Creek Community Alliance Wolf Creek is Special! It’s all about diversity: Geography Geology Biodiversity History Human Impacts.
1 America’s Longleaf Restoration Initiative Longleaf Maintenance Condition Class Definitions Update Clay Ware US Fish and Wildlife Service April 25, 2013.
© All rights reserved. Front Range Roundtable Project Outline: Wildlife Working Team 1 Rick & Lynne to edit by may meeting Team Scope Roundtable.
Colorado Front Range Collaborative Forest Landscape Restoration Project : Initial Pre and Post-Treatment Stand Structure Analysis for the Pike and San.
North Coast Forest Conservation Program Northern Spotted Owl Status Overview Madison Thomson (707)
UPPER MONUMENT CREEK LANDSCAPE RESTORATION Allan Hahn – District Ranger Mike Picard – ID Team Leader.
Tree distribution patterns in the southwest Jemez Mountains Kamal Humagain 1, Robert Cox 1, and James Cain 2 1 Texas Tech University 2 New Mexico State.
4 Forest Restoration Initiative Overview of Vegetation Data, Modeling and Strategies Used to Develop the Proposed Action Neil McCusker Silviculturist 4FRI.
Forests For Tomorrow Species and sowing Provincial Meeting September 18, 2013 Allan Powelson Photo by Leon Duncan.
© All rights reserved. Front Range Roundtable Project Outline: Landscape Restoration Team CY 2014 Goals CY 2014 Deliverables Scope Why this? Why.
Clearwater Basin Collaborative Restoring America’s Forests Oct. 3-5, 2011, Truckee, CA Photo: William H. Mullins Kelly Creek CBC Landscape Assessment Preliminary.
Effects of Regeneration Abundance on Predicted Development of Interior Douglas-fir Stands By Cornel Lencar Graduate Student, Faculty of Forestry University.
Do stem form differences mask responses to silvicultural treatment? Doug Maguire Department of Forest Science Oregon State University.
Dead/Dying Douglas-fir Granite Creek area Dead/Dying Douglas-fir Harvest up to 95% of dead/dying trees
Stand initiation: South facing hillside, kept open by moisture limitations + repeated fires, Douglas-fir slowly invading (Kalamopsis.
Thinning mixed-species stands of Douglas-fir and western hemlock in the presence of Swiss needle cast Junhui Zhao, Douglas A. Maguire, Douglas B. Mainwaring,
 Tier 1: Monitoring that will be done regardless of funding received:  Forest Service Preference is to focus on vegetation, e.g. Stand Structure including.
Southern Interior Forest Region Soils Plant Ecology Hydrology Geomorphology Silvicultural Systems Wildlife Ecology Forest Science Program Research, Consultation,
Sustaining Front Range Forests & Communities February 26, 2010.
Front Range Roundtable Quarterly Meeting Jill Alexander Wildfire Mitigation Specialist Douglas County Building Division.
The following sentences provides examples of poor writing, why they may not meet landowner needs, and alternative ways to present the same information.
Fairy Lake Rx Burn Monitoring Stated objectives:  Mimic light to moderate ground fire  To minimize the mortality of mature whitebark pine (
Forest Succession.
1 Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 1: Vegetation Communities and Wildlife.
Gary W. Miller USDA Forest Service Northern Research Station Morgantown, West Virginia Intermediate Stand Management – The Crop Tree Approach.
Plantation Forestry: A Global Look. Forest Area: 3,952,025,000 ha Woodland Area: 1,375,829,000 ha.
Potential Biomass Volumes From Forest Treatments in the West Bryce Stokes National Program Leader Washington, DC ______ USDA Forest Service R&D.
Karen Honeycutt, CFLR Coordinator, Natural Resource Program Manager LiDAR and the Northeast Washington Forest Vision 2020.
MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.
Sand Dunes State Forest
WDFW Forest Management Mission
Manipulate broadleaf density Tend individual Sw
Cold Springs Fire Project
Phases 1 & 2 Units ACTIVITY PLANNED IMPLEMENTING COMMENTS
Kirk Hanson (360)
By: Philip W. Williams Bachelor of Science in Forestry Student
Poster Session: 260, 3:05 PM  on Monday, 7/29/2019, 
Angela Gee, US Forest Service July 22, 2019
Designation by Prescription (DxP)
Presentation transcript:

CFLRP MONITORING Pike & San Isabel National Forests & Cimarron & Comanche National Grasslands 2013 FIELD TRIP September 13, 2013 Front Range Round Table

FIELD TRIP AGENDA 2 STOP 1. Messenger Gulch 2: Review a post-treatment ponderosa pine site. Clumpiness was a component of the prescriptions. STOP 2. Long John Project: Review a post-treatment ponderosa pine & dry mixed conifer site that included “clumpy” demo areas. STOP 3. Catamount 1: Review a post-treatment dry mixed conifer & mesic mixed conifer site to look at openings and variable residual density. STOP 4. Upper Monument Creek Project: Review an untreated ponderosa pine, dry mixed conifer, & mesic mixed conifers sites to discuss openings and wildlife objectives.

FIELD TRIP AGENDA 3

4 STOP #1 – MESSENGER GULCH 2 Post Treatment variable spacing “clumpy” in ponderosa pine.

STOP #1 – MESSENGER GULCH 2 5 PROJECT SPECIFICATIONS 425 total acres (mix of mechanical and hand treatments). Treatment in mechanized was designed to achieve “clumpy” residual conditions and serve as a demo treatment area. RX:  Retain square feet of live basal area.  Cut, spruce and Douglas-fir first.  Within stand density should be highly variable, ranging from 10 – 80 sq. ft. of basal area.

STOP #2 LONG JOHN 6 Leave Tree marking Ponderosa Pine Site

Target residual Basal Area is 40–60 sq. ft. Vary residual basal area within a 20–80 sq. ft. range. Favor removal of Douglas-fir and spruce. Retain legacy trees. Remove live conifers within aspen clones where feasible. Retain legacy trees. 7 RX GUIDELINES STOP #2 LONG JOHN RESULTS (Sale Admin Inspection) Residual BA for Entire Project = 52 sq. ft. Variation at the plot level = sq. ft.

STOP #2 LONG JOHN PRE & POST TREATMENT: DRY MIXED CONIFER SITE 8

STOP #2 LONG JOHN PRE & POST TREATMENT: ASPEN ENHANCEMENT 9

STOP #3 CATAMOUNT 1 10 Openings on north aspects.

STOP #3 CATAMOUNT 1 PROJECT SPECIFICATIONS 351 total acres (mix of mechanical and hand treatments) IMPLEMENTATION Establish Groups /Clumps of trees and Openings Opening primarily located on north facing aspects ½ to 2 acres in size; centered on/adjacent to: insect and disease pockets, aspen pockets; where five needle and ponderosa pine regeneration will be enhanced. 11

STOP #4 – UPPER MONUMENT CREEK RESTORATION INITIATIVE PROJECT 12 Major Forest Vegetation of the Project Area: BIOPHYSICAL SETTINGACRES Ponderosa Pine/Douglas-fir Woodland 20,472 Dry-Mesic Montane Mixed Conifer Forest & Woodland 18,681 Mesic Montane Mixed Conifer Forest & Woodland 15,656 Lodgepole Pine Forest 2,361 Gambel Oak-Mixed Montane Shrubland 2,142 59,312

STOP #4 – UPPER MONUMENT CREEK PROJECT 13 South facing aspect, ponderosa pine site: Consideration for opening expansion/treatment of conifer encroachment.

STOP #4 – UPPER MONUMENT CREEK PROJECT 14 West facing aspect, dry mixed conifer site: Consideration for opening expansion/expansion of aspen.