ATLAS/CARIBU Status Guy Savard Scientific Director of ATLAS Argonne National Laboratory & University of Chicago Workshop on Future GRETINA Science Campaigns.

Slides:



Advertisements
Similar presentations
ATLAS Users Workshop August CARIBU: early science program Guy Savard Argonne National Laboratory and University of Chicago.
Advertisements

Initial Results of the ECR Charge Breeder for the 252 Cf Fission Source Project at ATLAS Richard Vondrasek, John Carr, Richard Pardo, Robert Scott.
Initial Science Case For GRETINA at ATLAS M.P. Carpenter Physics Division, Argonne National Laboratory ANL Gretina Workshop March 1, 2013.
March 1, 2013GRETINA workshop Coulomb excitation of even Ru and Mo isotopes Juho Rissanen Nuclear Structure Group, Lawrence Berkeley.
GEANT4 Simulations of TIGRESS
Operation of the ATLAS Superconducting Accelerator for Heavy Ions Matthew Hendricks ATLAS Operations Supervisor October 27, 2014.
GRETINA at ATLAS C.J. (Kim) Lister ATLAS Users Workshop 8-9 th October 2009 GRETINA ATLAS GAMMASPHERE.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
D. Leitner, D. Alt, T. M.Baumann, C. Benatti, B. Durickovich, K. Kittimanapun, A. Lapierre, L. Ling-Ying, S. Krause, F. Montes, D. Morrissey, S. Nash,
ATLAS Capabilities Today May 15, 2014 Richard Pardo May 15, 2014 ATLAS USERS MEETING: ATLAS Today R. Pardo 1.
Mass measurements on neutron-rich nuclei with the CPT mass CARIBU Kumar S. Sharma Department of Physics and Astronomy Winnipeg MB.
Direct measurement of 4 He( 12 C, 16 O)  reaction near stellar energy Kunihiro FUJITA K. Sagara, T. Teranishi, T. Goto, R. Iwabuchi, S. Matsuda, K. Nakano,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
An Updated Strategic Plan: Why? Robert V. F. Janssens Scientific Director of the ATLAS Facility Physics Division Director 2009 ATLAS Users Workshop, August.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
Progress and Plan for Superconducting RF Cavity RF Group.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
The CARIBU facility Guy Savard Argonne National Laboratory & University of Chicago ATLAS Users Meeting May
Spectroscopy and lifetime measurements at ReA12 Hiro IWASAKI (NSCL/MSU) 7/12/2014Recoil Separator for ReA12 workshop1.
Superheavy Element Studies Sub-task members: Paul GreenleesJyväskylä Rodi Herzberg, Peter Butler, RDPLiverpool Christophe TheisenCEA Saclay Fritz HessbergerGSI.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 106 nd Session, 24 September 2009, Dubna.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
GRETINA experiments with fast beams at NSCL Dirk Weisshaar,  GRETINA and fast-beam experiments  Some details on implementation at NSCL  Performance.
Richard Pardo Argonne National Laboratory ATLAS Operations ATLAS User’s Meeting August 14, 2009.
AGFA – the Argonne Gas-Filled Analyzer Presentation at the 2014 ATLAS User’s Meeting May 15-16, 2014 Birger B. Back.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Gamma-Ray Energy Tracking Array GRETINA The 11 th International Conference on Nucleus-Nucleus Collisions May 27- June1, 2012, San Antonio TX I-Yang Lee.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Technical aspects of the ATLAS efficiency & intensity upgrade Peter N. Ostroumov ATLAS Users Workshop, August 8-9, 2009.
N=126 factory Guy Savard Scientific Director of ATLAS Argonne National Laboratory & University of Chicago ATLAS Users Meeting ANL, May 15-16, 2014.
Direct Reactions with ORRUBA and GRETINA Steven D. Pain Oak Ridge National Laboratory GRETINA Workshop, ANL, February 2013.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
First application of ranging-out method and hybrid 3Hen counter at ISAC-1: measurement of absolute beta-delayed neutron rates (I βn ) for Ga and Ge isotopes.
Status of the ion traps at ATLAS Jason Clark ATLAS users workshop August 8, 2009.
106 th Session of the JINR Scientific Council September 24-25, 2009, Dubna Perspectives of JINR – ORNL Collaboration in the Studies of Superheavy Elements.
Yu. Oganessian FLNR (JINR) PAC–meeting, June 22, 2009, Dubna Experimental activities and main results of the researches at FLNR (JINR) Theme: Synthesis.
Fundamental Interactions Physics & Instrumentation Conclusions Conveners: P. Mueller, J. Clark G. Savard, N. Scielzo.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
W. Nazarewicz. Limit of stability for heavy nuclei Meitner & Frisch (1939): Nucleus is like liquid drop For Z>100: repulsive Coulomb force stronger than.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Direct measurement of the 4 He( 12 C, 16 O)  cross section near stellar energy Kunihiro FUJITA K. Sagara, T. Teranishi, T. Goto, R. Iwabuchi, S. Matsuda,
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
CHICO-II; a 4π heavy-ion detector LLNL-Rochester CHICO2 collaboration LLNL:C-Y. Wu U. Rochester:A.B. Hayes, D. Cline, R. Flight, A. Melchionna, C. Zhou.
Low-contamination Rare and Exotic Beams (at CARIBU) Sergey Kondrashev October 16, 2012.
Introduction to the Working Groups: Preparing the Strategic Plan Robert V. F. Janssens Scientific Director of the ATLAS Facility Physics Division Director.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Laboratori Nazionali del Sud Start EXCYT status and perspectives L. CELONA on behalf the EXCYT collaboration Istituto Nazionale di Fisica Nucleare-Laboratori.
How can one produce rare isotopes? Question Slid 3 Hendrik Schatz NNPSS 2012, Slide 3 Rare Isotope Production Techniques: Uniqueness of FRIB Target spallation.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Ion Accelerator Activities at VECC
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Muon Ionisation Cooling Experiment Overview
A. Martynov on behalf of accelerator division.
How to run ions in the future?
EffiCAS Efficient Facility for Ions at CAS
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
HIE-LINAC status report
Pulsed Ion Linac for EIC
Status of the JLEIC Injector Linac Design
ACCSYS Collaboration Board Triestre, 3rd october 2017
Presentation transcript:

ATLAS/CARIBU Status Guy Savard Scientific Director of ATLAS Argonne National Laboratory & University of Chicago Workshop on Future GRETINA Science Campaigns Argonne National Laboratory, March 1, 2013

2 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 Existing ATLAS facility  Stable beams at high intensity and energy up to MeV/u  Light in-flight radioactive beams –light beams, no chemical limitations, close to stability, acceptable beam properties  CARIBU beams –heavy n-rich from Cf fission, no chemical limitations, low intensity, ATLAS beam quality, energies up to 15 MeV/u  State-of-the-art instrumentation for Coulomb barrier and low-energy experiments  Operating over 5000 hrs/yr at about 95% efficiency –Users performing experiments at ATLAS: FY10: 390 FY11: 326 FY12: 394 –About 10 Ph.D. theses per year (16 in FY12) Suite of experimental equipment 3 injectors

3 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 Neutron-rich beam source for ATLAS: CARIBU “front end” layout Main components of CARIBU –PRODUCTION: “ion source” is 252 Cf source inside gas catcher Thermalizes fission fragments Extracts all species quickly Forms low emittance beam –SELECTION: Isobar separator Purifies beam –DELIVERY: beamlines and preparation Switchyard Low-energy buncher and beamlines Charge breeder to Increase charge state for post- acceleration Post-accelerator ATLAS and weak-beam diagnostics

4 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 CARIBU gas catcher: transforms fission recoils into a beam with good optical properties  Based on smaller devices developed at ANL –Radioactive recoils stop in sub-ppb level impurity Helium gas – Radioactive ion transport by RF field + DC field + gas flow –Stainless steel and ceramics construction (1.2 m length, 50 cm inner diameter) –Fast and essentially universally applicable –Extraction in 2 RFQ sections with μRFQs for differential pumping He gas DC gradient To acceleration and mass separator RF (cone) RF (body) 252 Cf

5 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 CARIBU building with first experiment (CPT mass spectrometer) April 2011

6 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013  1 Ci 252 Cf source  about 20% of total activity extracted as ions  works for all species  complementary to uranium fission Extracted isotope yield at low energy (50 keV) > than 500 neutron-rich species extracted at > 1/s > 150 whose masses have never been measured

7 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 CPT Measurement campaigns

8 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 Atomic Mass Evaluation comparison Trend: more neutron-rich nuclei are found to be less bound than expected away from stability In Sn Sb Te I Xe Cs Pr Nd Pm Sm Eu Gd Higher N

9 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 CPT Measurement campaigns

10 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 CPT Measurement campaigns Being completed from previous PAC measurements for r-process studies measurements for new isotope discovery Ongoing heavy-peak measurements

11 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 First Coulex with 141 Cs – two goals: 1. Demonstrate feasibility & study backgrounds from stable beam contamination and  decay with 850 MeV beam on Pb; i.e., “unsafe” Coulomb excitation; 4300 part/sec for 14.5 hours run. 2. Measure B(E2) of the 11/2 + state in 141 Cs, via “safe Coulex” at 601 MeV for ~62 hours with ~3360 part/sec. B(E2) = 20(5) W.u., smaller than the 2 + level in 142 Ba (32(1) W.u.), but similar to the value for the 2 + state in 140 Xe (25.6(8) W.u). Figure: Gamma-ray spectra from 601- & 850- MeV 141 Cs with the Coulomb excitation line at keV. S. Zhu et al., to be published First Coulomb excitation measurement with a CARIBU beam

12 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 ATLAS layout with ongoing and planned upgrades CARIBU New in-flight separator (AIRIS) EBIS MHB RFQ new cryomodule cryomodule and rebuncher rearranged High-Intensity ECR New low-energy experimental hall Improved instrumentation 12 Novel design from Accelerator R&D group World record performance

13 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 All PMP milestones have been met, beam tune developed, now operational. ParameterRequired ValueDemonstratedDesign Beam Output Energy~220 keV/u293 keV/u Transmission for any test ion beam with input normalized rms emittance 0.1  -mm-mrad  65% 83% Charge-to-mass ratio of a test ion beamQ/A < 1/51/5.71/7 Duty cycle100% ARRA funded upgrade: New RFQ accelerator section of PII linac

14 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 Installation of cryomodule components (liquid helium manifold, helium and nitrogen plumbing, slow tuners, RF coupler warm windows, temperature sensors,…) and alignment of evacuated cavity-solenoid string is in progress Cryomodule vacuum vessel is ready to receive cavity-solenoid string   Plans for FY2013 1)Complete off-line assembly and cold testing 2)Install into the beam line (Jun.-Sept. 2013) and commission with beam ARRA funded upgrade: Replacement of first booster cryostat module and liquid helium upgrade

15 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013  1 st stage of ARRA funded upgrade –Front end reconfiguration (RFQ, PII cavities rearrangement, electrostatic optics) completed –Commissioning completed Total transmission of 80% demonstrated –New tunes have been developed, ready for operation …. actually running today!!!  2 nd stage of ARRA funded upgrade –Construction of cryostat and cavities completed –Mock up assembly completed, final assembly on-going –Preparation for new cryostat installation and booster rearrangement ongoing –Expecting to shut down ATLAS for installation at the end of May for ~ 4 months –Restart in October, facility operational when GRETINA is ready for operation at ATLAS 15 Summary of ongoing intensity and efficiency upgrade

16 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013  Community plan for GRETINA in coming years: –Complete MSU campaign by July ; –Move to ATLAS and installation; –ATLAS/CARIBU campaign from October 2013 to December –Return to MSU  Preparation for campaign: –Site preparation ongoing for stand-alone operation and operation in front of the FMA; –GRETINA WORKSHOP (March 1-2 at Argonne); Day 1: discuss and exchange information with GRETINA users on the detailed science opportunities at ATLAS. Provide guidance for the coming call for proposals, Day 2: discuss science opportunities and future siting of GRETINA beyond the ATLAS campaign. –Call for proposals including ATLAS/CARIBU beams to GRETINA (early March 2013) –ATLAS/GRETINA PAC (May 2013) –GRETINA installation at ATLAS (July-October 2013) –Completion of ATLAS ARRA funded upgrade and installation of new source at CARIBU (September-October 2013) –Start of GRETINA campaign at ATLAS (October 2013) Preparation for GRETINA campaign at ATLAS

17 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 ATLAS next few years running plan  FY2012 ( hrs): –CARIBU started (1542 hrs)  move to stronger Cf source –ATLAS running (6140 hrs) + modifications to prepare RFQ installation  FY2013 ( hrs): –Fall PAC: accepted experiments for ATLAS and low-energy and reaccelerated CARIBU beams –Fall  RFQ installation  ATLAS running tandem beams, CARIBU running low-energy with “1Ci source” –Winter/Spring: ATLAS + low-energy and reaccelerated CARIBU beams available –Spring PAC: accepting GRETINA experiments + all other ATLAS/CARIBU experiments –Summer  booster reconfiguration  low-energy CARIBU beams, no ATLAS beams, GRETINA arrives  FY2014 ( hrs): –GRETINA + CARIBU/ATLAS beams, low-energy CARIBU beams –Deep-inelastic production along N=126 for CPT/X-array, move tandem out, new CARIBU source  FY2015 ( hrs): –Fall  EBIS installation  Low-energy CARIBU beams, ATLAS beams, GRETINA leaves –Winter/Spring/Summer  AGFA installation, large CARIBU experimental area available, all beams available ( hrs)

18 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 Status  ATLAS is preparing for the GRETINA campaign –ARRA funded upgrade being completed by Oct 2013 –Ongoing preparation for GRETINA In “stand alone” mode on APEX beamline In front of FMA –New stronger 252 Cf source requested for the fall –Running a number of CARIBU reaccelerated beam experiments this spring  Need input from the community –What experiments do you want to be able to do with GRETINA at ATLAS? Are the two locations the right ones? Are they enough? Are they both needed? What auxiliary detectors need to be accommodated? –Should we setup campaigns? –What information do we need to provide to users? –What experiments are best done with GRETINA, what experiments are best done with Digital Gammasphere? –How do we handle the data?

19 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013

20 ATLAS\CARIBU Status Guy Savard, Argonne National Laboratory February 15, 2013 Gammasphere  Digital Gammasphere Gammasphere  World-leading  -spectrometer  100 HPGe Compton suppressed  In front of FMA or in stand-alone mode  Ancillary detectors –CHICO: Coulomb Excitation –HERCULES: Evaporation residues –MicroBall: charged particles –Neutron wall –Rotating target wheel: High intensity –Plungers: Lifetime studies –X-ray counters  ~ 40% of beamtime at ATLAS Digital upgrade  Goal: Increase rates x 4-12  Digitize energy signals  Done … no loss in resolution, X4 gain in countrate capability  Use Gretina digitizers  Digitize BGO shields  Status: Ongoing  Completion: 2013 Digital 40K/s and 1  s shaping is as good as “Old” and 10  s shaping