4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.

Slides:



Advertisements
Similar presentations
Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Advertisements

WEB AND WIRELESS AUTOMATION connecting people and processes InduSoft Web Solution Welcome.
GIS/AM/FM Solution for The Complex and Comprehensive
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Modeling Electrical Systems With EMTP-RV
A new Network Concept for transporting and storing digital video…………
Distributed Intelligence Provides Self-Healing for the Grid
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Network Design and Implementation
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
AVG Internet Security 7.5 Product presentation.
Substation Automation Systems
Chapter 19: Network Management Business Data Communications, 4e.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Distribution Management System Implementation at Florida Power & Light
Maintaining and Updating Windows Server 2008
Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.
Overview SAP Basis Functions. SAP Technical Overview Learning Objectives What the Basis system is How does SAP handle a transaction request Differentiating.
Supervisory Systems.
Structure Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 STRUCTURE COMMANDER Introduction Product Overview.
Module 16: Software Maintenance Using Windows Server Update Services.
Systems Analysis and Design: The Big Picture
April 3, 2001 Washington, DC 2001 EMS Users Group.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
MicroSCADA Pro Ordering Tool and Process
©Kwan Sai Kit, All Rights Reserved Windows Small Business Server 2003 Features.
Electrical Distribution Training
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Making Managed Services Easier Presenter: Greg Henderson Director, International.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
IT 456 Seminar 5 Dr Jeffrey A Robinson. Overview of Course Week 1 – Introduction Week 2 – Installation of SQL and management Tools Week 3 - Creating and.
Computer Emergency Notification System (CENS)
MicroSCADA Pro Ortviken upgrade & Crimea Wind Power Plant
Ordering Tool Guideline
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
© ABB MRS MicroSCADA Pro LEC-LEC co-operation Asan-Baebang Integrated SA/SCADA/DMS delivery Jung-Wook Koh-KRABB/SAS Anssi Salonen-FIABB/SAS.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Automated Capacitor Control Program at TXU Electric Delivery SWEDE May 1, 2006.
Module 4 Planning for Group Policy. Module Overview Planning Group Policy Application Planning Group Policy Processing Planning the Management of Group.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
Model-Centric Smart Grid for Big Data
Utility Engineers, PC.  Generation  Transmission  Distribution.
NERC Lessons Learned Summary LLs Published in September 2015.
Chapter 12 The Network Development Life Cycle
4/26/2017 MicroSCADA Pro SYS Mikael Molander FISUB/Österbacka.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Maintaining and Updating Windows Server 2008 Lesson 8.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Graphical Data Engineering
Advanced Distribution System Management and Enterprise Engineering & Operations Wayne Carr -- Milsoft.
MicroSCADA Pro Complete Scalability
Peter van Oirsouw (Phase to Phase)
NetworkManager CIM Users Group Prague
Paper 5.57 INFORMATION SYSTEM SOLUTION FOR RELIABILITY BASED ANALYSIS AND DEVELOPMENT OF DISTRIBUTION NETWORKS P. Verho, P. Järventausta, A. Mäkinen, K.
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
AIMS Equipment & Automation monitoring solution
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Customized gis applications for Electric DISTRIBUTION Utilities
Presentation transcript:

4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka

DMS 600 Topics Release of DMS 600 4.2 SP1 4/21/2017 DMS 600 Topics Release of DMS 600 4.2 SP1 DMS 600 for Industrial Networks Extended SA systems / Small FA systems Offline Network Information & planning systems FISUB/Österbacka

DMS 600 4.2 SP1 Overview Some new features 4/21/2017 DMS 600 4.2 SP1 Overview Some new features Corrections and enhancements in all areas Details are available in the Release Notes Database upgrades are needed Access based DB updated during Server installation Scripts exist to update SQL Server and Oracle Windows Vista is supported This presentation gives a brief overview and does not cover all improvements FISUB/Österbacka

Documentation All (5) manuals updated Also on-line helps 4/21/2017 Documentation All (5) manuals updated Installation Manual 1MRS755275 Operation Manual 1MRS755274 System Overview 1MRS755272 Integration with SYS 600 1MRS755273 System Administration 1MRS755276 Also on-line helps FISUB/Österbacka

New Features New DMS 600 message service (TCP socket based) 4/21/2017 New Features New DMS 600 message service (TCP socket based) Additional symbol definition (decluttering) levels (to 10) Additional symbols for MV/LV transformer and disconnector subtypes FISUB/Österbacka

New features cont. Optionally coloring of MV/LV transformer and MV/LV substation symbols with feeder color Feeding network can be seen if open point inside substation Temporary earthings and opened line sections Exact location and several items for each line section Operational zooming Workstation status bar enhancements Traffic light and tooltip

New features cont. Line types (Solid Line, Dashed Line, Dash-Dot, etc.) for conductor/cable types

Software Delivery The SP1 is available on www.abb.com/microscada 4/21/2017 Software Delivery The SP1 is available on www.abb.com/microscada Includes also Release Notes Note! Installation package is not incremental i.e. it can be installed alone (difference to SYS 600) No changes in Ordering Procedures or tools FISUB/Österbacka

DMS 600 Topics Release of DMS 600 4.2 SP1 4/21/2017 DMS 600 Topics Release of DMS 600 4.2 SP1 DMS 600 for Industrial Networks Extended SA systems / Small FA systems Offline Network Information & planning systems FISUB/Österbacka

Introduction for industrial networks 4/21/2017 Introduction for industrial networks Network overview with tracing, zooming, panning and de-cluttering Network asset database Load flow calculations with motor start-up Short circuit current calculations Protection planning with selectivity analysis Operational switching planning Network reinforcement planning with load flow and short circuit capacity checks All this and more with DMS 600 From ABB FISUB/Österbacka

Network overview Asset database with several views 4/21/2017 Network overview Asset database with several views Geographic view with cable and component locations Operational diagrams etc. Fast overview of all lines, switches, transformers, substations etc. Zooming Panning De-cluttering FISUB/Österbacka

4/21/2017 Topology Management Analyses the connectivity of the network and shows results in any view Looped network De-energized parts Dynamic line coloring Upstream and downstream tracing FISUB/Österbacka

4/21/2017 Load flow calculation P, Q, I, U for every line in the network in real time or simulated situations Capacitors and generators included for reactive power analysis Load data using Given power/annual energy or load curves Motors including starting motors Real time load flow using feeder, motor and generator measurements Result representation using coloring FISUB/Österbacka

Fault currents and protection analysis 4/21/2017 Fault currents and protection analysis 3-, 2- and 1-phase short circuit currents Over current protection analysis Detection ability Short circuit capacity Protection selectivity Result representation using coloring and detailed numerical results for all line sections FISUB/Österbacka

Operations Planning Create and simulate switching sequences in advance 4/21/2017 Operations Planning Create and simulate switching sequences in advance Two way to create a sequence: Automatic sequence creation Checking of technical constraints Learn mode (macro recording) Contingency Analysis for predefined outage situations Plan Management Saving Scheduling Execution Support FISUB/Österbacka

Operations Planning The tasks in switch orders can be customized 4/21/2017 Operations Planning The tasks in switch orders can be customized Checking, approval, work permit… Tight Integration with MS Word to create documents MS word templates with modified content, layout and customer logos The end user can define and print customized switch order documents FISUB/Österbacka

Operations Planning The tasks in switch orders can be customized 4/21/2017 Operations Planning The tasks in switch orders can be customized Checking, approval, work permit… Tight Integration with MS Word to create documents MS word templates with modified content, layout and customer logos The end user can define and print customized switch order documents FISUB/Österbacka

DMS 600 Topics Release of DMS 600 4.2 SP1 4/21/2017 DMS 600 Topics Release of DMS 600 4.2 SP1 DMS 600 for Industrial Networks Extended SA systems / FA systems Offline Network Information & planning systems FISUB/Österbacka

Decentralized Distribution Automation 4/21/2017 Decentralized Distribution Automation Distribution automation with fault location, isolation and restoration at HV/MV substations Why decentralized would be an option? Advanced data from IEDs is available at substation without communication delays -> event analysis and advanced algorithms are possible Communication to Feeder RTUs easier to implement (radio) Number of stations and FRTUs may grow too big in control center for advanced applications Control center may have existing SCADA (DMS) system not capable for advanced DA FISUB/Österbacka

Example of large feeder automation 4/21/2017 Example of large feeder automation 1 HV/MV substation 16 feeders ~100 FRTUs With DNP3 FISUB/Österbacka

DA System compared to SCADA/DMS DA System is decentralized Separate feeder automation (FA) system without SA functionality (CB trips from station normally needed) Extended SA system including feeder automation devices with communication and applications DA system requires network model for advanced network applications like restoration and load estimation Load estimation and forecasting needed to check capacity in down-stream network restoration

Things to consider Does control center need states also from FTUs SYS 600 acting as gateway also for these How to control a tie switch* that is between two feeding substations Can both systems control? Should the DA systems discuss with each other * Tie switch = open switch before fault providing back-up feed

Existing products can be utilized MicroSCADA Pro SYS 600 and DMS 600 can be used directly for extended SA Remote desktop from control center often needed Engineering is fast compared to full DMS Station diagram import from SYS 600 Feeders do not need to have all objects and exact locations No maps

DMS 600 Topics Release of DMS 600 4.2 SP1 4/21/2017 DMS 600 Topics Release of DMS 600 4.2 SP1 DMS 600 for Industrial Networks Extended SA systems / FA systems Offline Network Information & planning systems FISUB/Österbacka

Functionality of DMS600 - NIP 4/21/2017 Functionality of DMS600 - NIP Using Network Information and Planning Module Asset database Geographic documentation Data analysis and reports Network calculations (load flow and short circuits in peak power situation) Map printing Network planning Maintenance planning The network information and planning module uses same database and network presentation as other DMS600 modules FISUB/Österbacka

Network Information and Planning Module 4/21/2017 Network Information and Planning Module Documentation Network calculation Data analysis Planning Database update Asset database External systems DMS600 FISUB/Österbacka

4/21/2017 Network Planning In network planning alternative network structures can easily be compared regarding Technical acceptability Cost of losses Building costs Main results for each plan include Costs of investment and losses from entire study period in NPV* Interest rate and load growth needed Material report and network reliability indices SAIDI and SAIFI (or T-SAIFI T-SAIDI) also reliability cost is estimated * NPV = net present value FISUB/Österbacka

Customers for Network Information & Planning Extension of SCADA/DMS System to allow network planning and fluent network database updates when network is built Separate off-line tool without DMS on-line features Consultants and contractors building networks for network planning and documentation Planning phase only or full NIS for end customers Protection planning and setting calculations

Changes to licensing Information and planning (NIP) as parallel to DMS 600 Base System User can select DMS 600 base or NIP base or both If DMS 600 base is also selected, 50 % reduction in NIP base price Price per workstation calculated only once DMS 600 additional options are available only when DMS 600 base is selected and NIP options are available when NIP base is selected If “Low Voltage Networks” is selected as a DMS 600 option, no additional price for corresponding option in NIP

4/21/2017 FISUB/Österbacka