Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.

Slides:



Advertisements
Similar presentations
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Advertisements

ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
ERCOT Billing, Settlement Disputes & Data Extracts
11/08/2005 Ken Donohoo Report on Lessons Learned – Hurricane Rita November 10, 2005 ROS Meeting Austin Control Center (MET Center)
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
April 15, 2003 UFE 2002 ANALYSIS. April 15, 2003 LOAD AND UFE – ERCOT PEAK 2002 This is a graphic depiction of load and UFE on the ERCOT Peak Day for.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
ISO Comparison – CAISO Alex Lee (ERCOT)
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
ERS Update – DSWG Presentation September 21, 2012.
1 CenterPoint Energy Response to ‘Hurricane Rita’ CenterPoint Energy Response to Hurricane Rita RMS Update October 12, 2005.
1 TAC Report to the ERCOT Board February 16, 2005.
Distributed Generation Registration June 30, 2008.
Lessons Learned from Block Load Transfers following Hurricane Rita Reliability and Operations Subcommittee Meeting January 13, 2006.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Emergency and Other Event Communications ERCOT Board of Directors Richard Gruber, Director of Market Services Paul Wattles, Manager, Governmental Relations.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Scheduling and Operating Transmission Devices in the Nodal Environment.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Operations Update ERCOT Board Meeting March 18, 2003.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
H.B. “Trip” Doggett President and Chief Executive Officer Review of February 2, 2011 Energy Emergency Alert (EEA) Event Emergency Event Coordination Workshop.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Credit Working Group Background Information Credit Aspects of Mass Transition Update – February 3, 2006.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
ERCOT MARKET EDUCATION
Impact of Hurricane Ike on
TAC Report to the ERCOT Board
Hurricane Rita.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

Hurricane Rita

2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice communications between ERCOT and TOs in impact area Cancelled planned transmission outages as of Friday, 9/23 Delayed scheduled implementation of Release 4 on 9/28 Requested QSEs to: – Staff all plants unless safety dictated otherwise – Notify ERCOT of all evacuated plants –Keep Resource Plans, Schedules, Bids up to date –Bid in all available capacity into BES market, particularly DBES –Be prepared to take plants off line quickly if requested by ERCOT

3 ERCOT Preparation (cont.) Distributed frequency control guidelines to all QSEs and Generators in case of loss of communication ERCOT QSE Generator Created link for hurricane updates on ercot.com Scheduled MP conference calls for September 23, 24, 25 Set up separate 24-hour phone hot lines for media and market participants for issues not concerning real time operations beginning 9/23 Arranged for extra ERCOT System Operators and Supervisors to come in if needed Stated intent to keep market operating as long as possible

4 Rita Track 120 MPH 50 MPH

5 ERCOT Customer Outages Customer outages started 17:00 on 9/23 in Galveston/Houston (CenterPoint)– hit a peak of 715,000 at 07:00 9/24 Customer outages started 06:00 on 9/24 in Lufkin/Nacogdoches/Tyler (TXUED) – up to 70,000 customers ultimately affected Vast majority of customer outages due to distribution system damage Service to almost all customers in ERCOT restored by 9/30

6 ERCOT Transmission and Generation Outages Transmission  KV lines  1 – 138/69KV autotransformer  9 – 69 KV lines  1 – 69 KV substation  All back in service by 06:00 9/28  No 345 KV outages Generation  One plant (76 MW) forced out by storm  Twelve of 30 plants in Houston area were shut down before the storm

7 ERCOT Summary The ERCOT system remained stable throughout the storm No significant communications problems with Market Participants ERCOT market systems functioned normally Experienced record September peak temperatures and demands in the four days following the storm without operational problems However …………

8 Entergy Hit Very Hard Transmission Outages – 82% of system  4 – 500 KV lines  28 – 230 KV lines  87 – 138 KV lines  161 – 69 KV lines  293 substations Affected 300,000 Entergy Texas customers East Texas was isolated from rest of Entergy system Generation deficient in East Texas

9 Block Load Transfers (BLTs) On 9/25 discussions started about possibility of BLTs from Entergy to ERCOT Decision to close normally open 138 KV tie between CenterPoint and Entergy at Crosby Critical Houston water supply pumps on Trinity river Line energized the evening of 9/26 Entergy started putting load on line on 9/27 Limit ~ 175 MW 138 KV tie established between TXUED and Deep East Texas Electric Coop at Huntington Energized on 10/1 Limit ~ 40 MW

10 State and Federal Action On 9/26 the State Emergency Operations Center created a Tiger Team to determine how service can be restored in East Texas ASAP Actions: –Governor issued order suspending eminent domain requirements for temporary facilities –On 9/27 PUCT issued order suspending CCN requirements and allowing ERCOT TDSPs to extend service in area –DOE agreed to issue order maintaining ERCOT’s FERC exemption for these emergency connections

11 Commercial Impact of Hurricane Rita

12 BLT Settlements Section 5.7 of Protocols define requirements for BLT events Two BLT points were implemented Each BLT is: –Initiated with a specific Dispatch Instruction –A wholesale delivery point(s) defined by an ESIID –Metered with an interval data recorder installed –Associated with a Load Serving Entity (LSE) –Represented by a Qualified Scheduling Entity (QSE)

13 BLT Settlements Estimated aggregate load is 100 to 150 MW For Settlement purposes, the BLTs are: –Treated as non-competitive wholesale load Transmission losses are applied No UFE is applied –Settled as load in the Congestion Zone in which their ESIID is located BLTs are excluded from 4CP calculations

14 Other Commercial Impacts due to Rita Initial settlement has only about 40% of meter reads available –Profiled ESIIDs use most recent usage for profile scaling factor –IDR ESIIDs may be estimated with prior period Final & True-Up settlement have over 99% of meter reads available –Profiled ESIIDs will use meter reads covering period. However, application of usage to profile will result in load being assigned during outages –IDR ESIIDs will use actual data available covering the period and will reflect what actually occurred for the ESIID

15 Other Commercial Impacts due to Rita Mass evacuation impacted UFE even before hurricane struck UFE = Generation – (Load + Losses) –Negative UFE means load is overestimated –Positive UFE means load is underestimated UFE may be created in a region but is allocated ERCOT-wide according to Protocols Pre-Initial (PRR 568 Analysis)Initial Settlement DateDaily Avg UFEApprox. Range UFEDaily Avg UFEApprox. Range UFE Sep-190%-3% - +2%0%-3% - +2% Sep-200%-4% - +2%0%-4% - +2% Sep-21-2%-5% - +1%-1%-5% - +1% Sep-22-11%-15% - -4%-8%-12% - -1% Sep-23-13%-22% - -8%-9%-17% - -5% Sep-24-16%-24% - -11%-12%-19% - -9% Sep-25-9%-20% - -2%-6%-14% - 0%

16 UFE on September 24, 2005