BPA Debt Optimization Presentation to the Energy Northwest Board Audit, Legal, and Finance Committee June 21, 2000.

Slides:



Advertisements
Similar presentations
Metropolitan Transportation Authority July Financial Plan Board Presentation July 24, 2013.
Advertisements

County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Debt Optimization & Debt Restructuring Update Presented to the Energy Northwest Executive Board.
March 9, 2011 Greater Wenatchee Public Facilities District.
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 16 Investing in Bonds.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
State Budget Update Scott Cummings Virginia Department of Planning and Budget 1.
March,  All three major sources of revenue are down and under continued downward pressure  Investment market decline means we won’t have the.
Learning Objectives 1. Describe the recording and reporting of various current liabilities. 2. Describe the reporting of long-term liabilities and the.
NHA | ADVISORS Strategy. Innovation. Solutions. Pajaro Valley Water Management Agency Financial Review and Initial Assessment October 22, 2014.
Noncurrent Liabilities Chapter 9. Noncurrent Liabilities Noncurrent liabilities represent obligations of the firm that generally are due more than one.
Financial Audit Presentation Year Ended June 30, 2013 The School District of Newberry County Greene, Finney & Horton, CPAs.
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Demystifying a “Risk-focused Surveillance Approach” to Establishing and Monitoring Standards for Sound Systems of Financial Management 10 th Annual Public.
Objectives Understand the basic concept and sources of capital associated with the cost of capital. Explain what is meant by the marginal cost of capital.
Learning Objectives After studying this chapter, you should be able to: Recognize revenue items at the proper time on the income statement. Account for.
1 Chapter 5 Adjustable Rate Mortgages. 2 Overview Adjustable Rate Mortgages and Lender Considerations Interest Rate Risk of Constant Payment Mortgages.
FOOD ENGINEERING DESIGN AND ECONOMICS
BOARD OF EDUCATION Finance Presentation Thursday, February 9, 2012.
Macalester College Summary: Proposed Operating Budget April 2009.
BPA FY 2003 Financial Condition Update: Liquidity Tools to Bridge the Gap Confidential – Sensitive Information BPA has a number of liquidity tools to bridge.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 10 Additional Consolidation Reporting Issues.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
© 2009 South-Western, a division of Cengage Learning 1 Chapter 9: FINANCE Using Funds To Maximize Value.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Bonneville Power Administration BPA Debt Restructuring Presentation to the Energy Northwest Board Audit, Legal, and Finance Committee March 28, 2002.
The Arbitrage Rebate & Yield Restriction Requirements: What Every Treasurer Must Know Glenn R. Casterline Managing Director.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
Bonneville Power Administration This information is being released externally by BPA on February 9, 2009 as an ad hoc report or analysis generated for.
1 Management of Energy Northwest Debt Presentation to the Energy Northwest Audit, Legal and Finance Committee May 27, 2010 Don Carbonari Manager, Debt.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
1 BPA Financial Choices Closeout Presentation for Fitch Ratings November 26, 2002.
Energy Northwest Executive Board Meeting February 27, 2003.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
February 2, 2011 Joe Yew City of Oakland California Debt and Investment Advisory Commission Debt 2: Accessing the Market Debt Policy and Plan of Finance.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
IMO BUSINESS PLAN Financial Overview September 30, 2003 Regulatory Affairs Standing Committee.
Bonneville Power Administration This information is being released externally by BPA on February 16, 2010 as an ad hoc report or analysis generated for.
West Contra Costa USD Tax Rate Setting Process, November 2012 Bond Election, and Current Topics Presentation to the Facilities Subcommittee August.
Mott Community College Board of Trustees Committee of the Whole Meeting June 27, 2011 BUDGET RESOLUTIONS.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
APPA Business & Financial Conference Savannah, Georgia September 15, 2009 Kevin Crawford, CPA Financial Analysis & Compliance Manager Gainesville Regional.
Bonneville Power Administration Significance of Rating Agency Ratings May 2002 Predicisional.
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
West Contra Costa USD Presentation to the Facilities Subcommittee November 13, 2012.
Credit risk in banks - importance of appraisal and monitoring PRESENTED BY : KRATI VERMA (09bshyd0390)
West Contra Costa USD Proposed Refunding Plan Presentation to the Facilities Subcommittee January 11, 2012.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
1 2015/16 – 2016/17 Budget Process BCC Workshop April 27, 2015.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
Personal Finance Chapter 13
FY08 PARKING PERMIT FEE PROPOSAL November 20, 2006.
Annual General Meeting Chris Tambini, Director of Finance Colin Pratt, Investments Manager.
Chapter 11 Cost of Capital Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Regional Cooperation Debt: A case study on debt management Javier Fernandez Treasury Manager, Bonneville Power Administration.
Needles Powers Crosson Financial and Managerial Accounting 10e Capital Investment Analysis 24 C H A P T E R © human/iStockphoto ©2014 Cengage Learning.
CFW Caldwell Flores Winters, Inc. Facilities Planning, Public Finance, Program Administration Bond Issuance Considerations February 14, 2014 St. Helena.
Welcome to Class 15 Research: Financial Domain & Case Studies – Part 1 Chapter 8.
Franklin Public Schools Audit Presentation For the Year Ended August 31, 2012 DANA F. COLE & COMPANY, LLP CERTIFIED PUBLIC ACCOUNTANTS.
Northwest Power Planning Council Review of Bonneville’s fish and wildlife funding and cost management strategies Briefing to the Northwest Power Planning.
CONNECTIONAL MINISTRIES REACHING FURTHER WITH THE GOSPEL BY SHARING THE LOAD.
Review of 2018–2023 Strategic Budget Plan Development Process and
Fair Go Rates System Dr Ron Ben-David Chairperson
WATER REVENUE REFUNDING BONDS SERIES 2017A
2018 Adopted Budget February Financial Plan
ELECTRIC REVENUE REFUNDING BONDS SERIES 2016A
Fair Go Rates System Dr Ron Ben-David Chairperson
Agenda FYE June 30, 2020 Operating Budget
Presentation transcript:

BPA Debt Optimization Presentation to the Energy Northwest Board Audit, Legal, and Finance Committee June 21, 2000

ENW6_15_00IF ppt 2 Objectives Background Program Proposal Maintenance of Capital Programs Summary Next Steps

ENW6_15_00IF ppt 3 Objectives

ENW6_15_00IF ppt 4 Program Objectives BPA is proposing to undertake a program of prudent debt management that: 1) reduces total debt service costs of BPA and lowers rates to ratepayers, 2) sustains delivery capability of capital programs, and 3) allows more variable rate debt as recommended by Energy Northwest

ENW6_15_00IF ppt 5 Today’s Objectives  To provide information supporting your fiduciary responsibility to conduct due diligence of refinancing proposals  To provide the information you requested about BPA’s debt optimization strategy  To respond to your further questions and concerns

ENW6_15_00IF ppt 6 Background

ENW6_15_00IF ppt 7 BPA Faces an Enormous Amount of Uncertainty: Planned Net Revenues for Risk are Designed to Address that Uncertainty Maximum value $500 $400 $300 $200 $12.2 Million $100 (Mean) $Millions $0 ($100) - $26.5 Million (Mean) - $10.1 Million - $1.5 Million - $4.9 Million - $0.2 Million -$22.8 Million ($200)(Mean) ($300) ($400) 90% Confidence Interval ($ 5 0 0) ($600) Minimum value TotalHydroDSIEconomySW MarketWeather Nuclear Rate Case anticipates market prices that average $34 / MWh flat undelivered (maximum $126 / MWh and minimum $6 / MWh) Rates

ENW6_15_00IF ppt 8 Relative to Rate Case Expectations, Net Revenues Were Significantly Higher in FY’s 90 & 91, and Lower in FY’s 92 & 93 (400) (300) (200) (100) $ millions Rate Case Planned Net Revenues Actual Net Revenue BPA sets rates to recover costs. Rates are designed around the revenue requirement which is the best cost forecast at the time. Sometimes either the cost or revenue forecast, or both, significantly deviate from plans. The results of the early 90’s are extreme examples of the magnitude of possible deviations.

ENW6_15_00IF ppt 9 Historical Perspective on Risk and Reserves  Between 1975 and 1983, BPA often failed to pay Treasury all it owed in a timely manner.  In the late 1980’s, with rising rates and increasing costs, BPA realized that it needed additional financial flexibility in order to ensure that Treasury payments were made, thus the Accelerated Front End Savings (AFES) was established as part of the refinancing program.  In the early 1990’s, through the 10-year financial plan, the focus shifted to the ongoing need to covering risks and ensure a high probability of Treasury payments (TPP).

ENW6_15_00IF ppt 10 FY’s 90 & 91: Net Revenue Increases Were Primarily Due to AFES; FY’s 92 & 93: Net Revenue Shortfalls Were Primarily Due to Low Aluminum Prices and Low Streamflows (600) (500) (400) (300) (200) (100) $ millions Net Revenue DifferenceENW DS SavingsAluminum Revenues Streamflow ImpactsOther Impacts Rates Adjusted

ENW6_15_00IF ppt 11 Benefits of Previous Energy Northwest Refinancings Extraordinary Columbia Capital Improvements $150M Rate Relief $1,150M Additional Federal Amortization $300M  The early Energy Northwest refinancings enabled BPA to make Treasury payments as planned through times of considerable hardship.  Had refinancings not occurred BPA would have had three options: 1) raise rates, 2) miss Treasury payments, and/or 3) reduce costs.  If BPA had missed Treasury payments, Northwest cost-based rates would have been seriously threatened.  Maintain low power rates  Facilitate BPA’s positioning in the emerging deregulated wholesale power market

ENW6_15_00IF ppt 12 Historical Perspective on Risk and Reserves  Between 1975 and 1983, BPA often failed to pay Treasury all it owed in a timely manner.  In the late 1980’s, with rising rates and increasing costs, BPA realized that it needed additional financial flexibility in order to ensure that Treasury payments were made, thus the Accelerated Front End Savings (AFES) was established as part of the refinancing program.  In the early 1990’s, through the 10-year financial plan, the focus shifted to the ongoing need to covering risks and ensure a high probability of Treasury payments (TPP).

ENW6_15_00IF ppt 13 Current Perspective on Risks and Reserves  The 2002 Rate Filing includes the ability to achieve the full 88% TPP for the first time. –$800M SOY cash reserves. –Currently proposed $100M per year planned net revenues for risk (PNRR).  Compared to , BPA is addressing most risk before the fact through rates rather than after the fact by depleting reserves or failing to pay Treasury.  Now BPA can focus on creating additional stability by –Lowering the fundamental cost structure, –Ensuring adequate capital financing, and –Adding more flexible features to Energy Northwest debt (variable rate debt, etc)

ENW6_15_00IF ppt 14 Program Proposal

ENW6_15_00IF ppt 15 Background on Capital Plan  BPA reduced Capital Program levels and accepted targets in the Cost Review for refinancing savings (achieved)  A Capital Strategy was developed that had two major elements a) development and implementation of Capital Budgeting Process, and b) managing access to capital  Capital Plan focused on managing access to capital  As part of Capital Plan process, numerous alternatives were looked at and Capital Plan focused on those tools which reduced overall debt service costs  Capital Plan meets two key criteria: reduction in overall debt service and continuing availability of BPA’s Treasury borrowing authority

ENW6_15_00IF ppt 16 Major Recommendations Included in the Capital Plan  Extend the final maturities on Columbia debt to  Substitution of Surety Bonds for some debt service reserve amounts - already accomplished for $38 million in May 2000  Selective Redemption of ENW debt - an ongoing program designed to maximize cashflow savings  Managing Federal Amortization - manages the terms and amortization of federal Treasury bonds to extend availability of borrowing authority

ENW6_15_00IF ppt 17 Program Proposal  Extend final maturities of Columbia debt to , creating a better asset/liability match  Complete an initial advance refunding sometime between November 2000 and April 2001 (approximately $600M)  Include a significant increase of variable rate debt  As cash flows into the Bonneville fund from lower ENW debt service, utilize it to retire higher interest Federal debt.  Expect the advance refunding proposal to be fine-tuned and improved as ENW’s financial advisor becomes increasingly engaged and an underwriter is selected  Complete additional refundings (up to an additional approximate $ M) as bonds become currently callable (assumed refinancing dates of 2004 and 2008 for analysis purposes only)

ENW6_15_00IF ppt 18 Proposed Debt Optimization Advantages Proposed refinancings:  Are evaluated in the context of BPA’s total debt portfolio  Emphasize prudent debt management by minimizing overall debt service expense  Reinforce asset/liability matching by extending Columbia debt  Have a specific plan for prudent use of cash flows  In addition to minimizing total debt service, supports other ENW/BPA desires to: a) Increase variable rate debt, and b) Assure continued availability of BPA borrowing capacity with Treasury

ENW6_15_00IF ppt 19 Refinancing Columbia Debt Lowers Power’s Annual Debt Service (Reflects Advance Refunding Only) $ in billions Power Debt Service Non-Federal Debt Service Before Refinancing After Refinancing

ENW6_15_00IF ppt 20 Additional Discussion Concerning Debt Optimization  The present value (discount rate of 9%) of combined federal and non federal debt service savings from the advance refunding alone ranges from $90M to $150M, depending on interest rates at the time of refinancing and other factors.  Average annual savings to preference ratepayers of at least $10-15M per year ( )  Other ideas which could increase the present value savings –Extending existing $120M variable rate debt (issued 3/98) to 2018 –Using alternative debt structure for new bonds –Completing additional refundings after FY 2001 –Engaging the expertise of ENW’s financial advisor and the underwriter (to be selected) once it is decided to move forward

ENW6_15_00IF ppt 21 Communications Strategy  BPA views debt optimization as a normal and prudent course of business  No elaborate public process is planned or expected  Account Executives and others will be thoroughly briefed in order to respond to customers’ and constituents’ questions

ENW6_15_00IF ppt 22 Questions/Answers Relating to the Future  What happens with net-billing and the power generated by Columbia when the debt is fully paid? The relationship between Bonneville and Energy Northwest stays the same. That is, net-billing continues to exist, and all the power generated is still marketed by BPA. BPA would still be financially responsible for all Columbia costs, including capital additions/replacements and funding future decommissioning.  What happens if BPA and/or ENW wants to sell Columbia? As a condition to sale or other transfer of the project (unless the project has been terminated), all of the bonds then outstanding would have to be defeased. In addition, all of the net-billing participants in the project would have to consent to the sale.  What would happen if BPA were sold? As a practical matter, all of the bonds for all three projects would have to be defeased prior to a sale of BPA or bondholder security otherwise assured.

ENW6_15_00IF ppt 23 Maintenance of Capital Programs

ENW6_15_00IF ppt Pre Rate Case: Public review and input process involves customers and constituents prior to rate case 2. Internal BPA Capital Budgeting: Requires use of risk weighted rates of return and critical choices among alternative proposals 3. Administrative: Proposed capital spending levels reviewed by BPA management 4. BPA’s Budget: Review and approval or disapproval by OMB and other Executive Agencies 5. Appropriations Committees: Review by both House & Senate Committees 6. Northwest Power Planning Council Review: Regional F&W and power program reviewed Capital Funding Review Process Bonneville’s capital requirements go through many critical reviews before expenditures proceed.

ENW6_15_00IF ppt 25 Expected Average Annual Capital Expenditures FY2000 to 2011 Transmission $195M Power $ 95M Corporate $11M

ENW6_15_00IF ppt 26 Assurance that BPA Management Will Stay Committed to the Capital Plan  With ENW approval, it would take deliberate and conscious action to NOT follow the Capital Plan.  The current high level of reserves and risk mitigation already built into rates minimizes risk that the cashflow savings will need to be diverted for other uses, and reserves also provide cashflow flexibility for implementation of the plan.  BPA management has thoroughly reviewed the Capital Plan and is committed to its implementation in the best long-term interests of the Region’s ratepayers.  Debt optimization, including extension of Columbia debt, is consistent with prudent debt management and overall sound business principles. It would be imprudent not to seek to optimize.  Our intention is to include this program in our budget submission.  The positive impact on borrowing authority provides additional incentive for following through on debt optimization.

ENW6_15_00IF ppt 27 Summary

ENW6_15_00IF ppt 28 Summary  With Energy Northwest approval, Bonneville executive management is committed to carry out Debt Optimization.  Debt Optimization is in the economic best interests of the Region’s ratepayers over the long term as it lowers BPA’s overall costs and contributes to sustained long term access to low cost capital.  Debt Optimization is a carefully tailored strategy which greatly differentiates it from the previous Accelerated Front-End Savings (AFES) Program, in that proposed refinancings: 1) Have an immediate, committed use for the cashflow savings 2) Reinforce asset/liability matching by extending Columbia debt 3) Exemplify an industry best practice of comprehensive debt portfolio management  Debt Optimization is a phased-in program that ENW will be able to review over time.

ENW6_15_00IF ppt 29 Next Steps

ENW6_15_00IF ppt 30 Next Steps  Continue work between BPA and ENW staffs as well as ENW financial advisor  Present more detailed information to AL&F Committee at July Meeting  Select underwriter by early August  Obtain AL&F Committee decision to move forward at August Meeting  By the end of August notify the Participant Review Board of refinancing plans  Perform necessary analysis and Official Statement work between September and November to be in a position to go to market between November 2000 and April 2001

ENW6_15_00IF ppt 31

ENW6_15_00IF ppt 32 BPA Year End Financial Reserves Financial reserves comprise cash in BPA Fund and cash equivalents in form of a deferred borrowing balance Reserves are BPA’s principal means of mitigating risk

ENW6_15_00IF ppt 33 BPA and Energy Northwest Have Significantly Reduced Staffing FTE BPA EN