Critical Chain IOM580 Hiroshi Ochiumi 1. High Probability of Budget Overruns Time Overruns Compromising the Content 2.

Slides:



Advertisements
Similar presentations
TIME MANAGEMENT. Being successful in a healthcare environment requires professionalism. One aspect of professionalism is time management. For some people,
Advertisements

Operational Risk Management (ORM)
Chapter 7 Schedule Control
6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
Critical Chain Analysis. Project Planning - Does it work? Generally Yes, but things don’t generally go as we planned, unexpected things happen: What is.
Interactive Storytelling for Video Games Chapter 13: The Argument Against the Supremacy of Player-Driven Storytelling Josiah Lebowitz Chris Klug.
Critical Chain Project Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
11-1 ELC 347 project management Week Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Critical Chain Project Scheduling
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.
Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
Applied Software Project Management INTRODUCTION Applied Software Project Management 1 5/20/2015.
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
ECE 480 Gantt Charts Revisited. Keys to Successful Gantt Charts USE the default, finish-to-start, constraints obtained by specifying predecessors, unless.
Project Management Part 7 Project Risk Management
OPMA 5364 Project Management Part 7 Project Risk Management.
Methods and Tools of Success Driven Project Management
© Avraham Y. Goldratt Institute An Introduction to the Theory of Constraints - breakthrough solution for Project Management Presenter Robert Bolton.
Year 11 Info Tech Project Management Overview. Project management overview identifying tasks, resources, people and time scheduling tasks, resources,
REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,
Egypt and USA - Notions of Time Polychronic Circular Past/Present Monochronic Linear Future.
Midterm Review SE503 Advanced Project Management.
Critical Chain A Novel by Eliyahu Goldratt Product lifetimes are diminishing fast u Projects to create new products must be shortened drastically u Consider.
Stage Gate - Lecture 31 Stage Gate – Lecture 3 Cultural Issues © 2009 ~ Mark Polczynski.
Prof. Aiken CS 169 Lecture 61 Project Planning CS169 Lecture 6.
When Things Go Right Cornell’s PeopleSoft 8.9 Upgrade Lisa Stensland Manager, CIT Project Management Office May 15, 2008.
Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Quick Recap.
CCT 355: E-Business Technologies Class 5: Next Assignments/Core questions in planning IS systems.
File:CCPGS05 CC present Page: 1 ETXPGS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
1 Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
A-9 18 D-9 6 F-9 10 D-7 9 A-7 20 A-5 15 C-5 6 E-5 28 E-3 10 F-7 7 F-5 14 F-3 20 B-3 8 A-1 4 C-1 5 A-6 15 The Problem…
 Development is organized in a series of short, fixed-length mini-projects called iterations  Iterations are also incremental  Successive enlargement.
© 2000 The TOC Center of Australia Pty Ltd 1 Critical Chain Overview – AIPM 2003 MktgCCSEAV01grh The TOC Centre of Australia Pty Ltd The.
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
CS3100 Software Project Management: Monitoring & Control 1 Software Project Management Week 10: Project Monitoring & control Ian Blackman.
Team 7 David D. Cho Minyoung Kim Bin (Raymond) Xiao Hua Zhang.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
UNHCR/e-Centre/InterWorks - Emergency Management Training Session Project Management: PERT / CPM.
To Scan or Not To Scan: That is the Question! Where are you on the Scale of 0 to 10? 010 I see the value, but I’ll just do it in-house OK, I’ll outsource,
Critical Chain Method These sides and note were prepared using 1. The book Streamlined: Building Lean Supply Chain Using the Theory of Constraints. Srinivasan.
Critical Chain Project Management. Outline Overview of Theory of Constraints Revisit conventional project management (Critical Path Management) Overview.
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
So you want to be a… Construction Manager. Construction Manager Plan, direct, coordinate, or budget activities concerned with the construction and maintenance.
Team 7 David D. Cho Minyoung Kim Bin (Raymond) Xiao Hua Zhang.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain – Ch Key Takeaways Group 5 Regina Anderson Ken Fong Brent Hawkins Jianhua Zhang.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
Cost Estimating and Budgeting. Cost Estimating Initial Cost Estimate Initial Cost Estimate Underestimates are Initially a Big Problem Underestimates are.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
9-1 ELC 347 project management Day 22. Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Copyright © The Conestoga Group PY 674 – Session 2 Review of week 1 material... Chapter 1: PM Overview – Main Text Book / H. Kerzner Ph. D. Focus.
Critical Chain Project Scheduling
ELC 347 project management
Critical Chain Project Scheduling
How to increase your market share : routes to success
Managing Service Projects
Reducing Project Duration
Setting up a project file
A Novel by Eliyahu Goldratt
Presentation transcript:

Critical Chain IOM580 Hiroshi Ochiumi 1

High Probability of Budget Overruns Time Overruns Compromising the Content 2

Reason for Project Delays Official –Weather –Government –Vendors –..always someone else’s fault Unofficial –Unrealistic Schedule –Forced to choose cheap (and unreliable) vendor –Vendor progress report unreliable –Wasteful meeting –Too many emergencies 3

Reason for Project Delays Uncertainty 4

Three Project Scenarios 5

6

Which is more significant? Budget Overrun Overdue P62: “They try to cut the budget by a few percent and cause the payback period to double.” 7

Cost World vs. Throughput World “The only way to achieve good cost performance is through good local performance everywhere.” “There is no way to achieve good throughput performance through good local performance everywhere.” 8

Tons/hour story The way you measure = The way you manage 9

Safety is Wasted. If a task is finished earlier, –They may not report. –Resource is not yet available for next job. A delay in one step is passed in full to the next step. An advance made in one step is usually wasted. The Student Syndrome 10

Multi Tasking 11

Multi Tasking 12

Option to Trade Lead Time with Money Impact of Delay Subcontractors make money on changes 3month delay can bankrupt real estate developer Capable subcontractor can include in the contract –guaranteed lead time –penalty 13

Critical Chain Dependencies between steps can be a result of a path or a result of a common resource. 14

How to Approach Don’t waste the time allotted for the CP. Project Buffer Feeding Buffer Progress is measured only on CP. Eliminate the Student Syndrome –Trim Safety –Now people are not sure if they can finish on time –It also eliminates multi tasking 15