Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.

Slides:



Advertisements
Similar presentations
Transwestern Pipeline
Advertisements

Bob Mishler Director Business Development January 15, 2008 LLC.
Available Capacity to Serve AZ
Natural Gas Market Conditions and Unisource Natural Gas Bills Bob Gray, Arizona Corporation Commission Staff February 24, 2004.
Arizona Corporation Commission Summer Peak 2000 Preparedness Workshop May 17,
Texas Natural Gas Workshop
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
1 AEC October 31, To Chicago Western U.S. Gas Grid Northern Border Kern PGT Northwest El Paso CIG & WIC Trailblazer CIG KN Potential Connect to.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
RB:UMT Arizona Corporation Commission Workshop on Natural Gas Infrastructure NOI February 13, 2004 Phoenix, Arizona.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Bryan Hassler, Executive Director Western Energy Institute Domestic Supply Perspectives October 23, 2003 Las Vegas, NV.
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
Southern Star Central Gas Pipeline, Inc August 31, 2005.
Red Lake Gas Storage Project Update ACC Workshop Arizona Natural Gas Infrastructure February 2004.
Wyoming Pipeline Authority August 30, 2005 Gaylen Haag Business Development Questar Pipeline Company.
Wyoming Natural Gas Pipeline Authority “Moving Wyoming Gas to California” December 9, 2003 John R. Smith Director Regulatory and Governmental Affairs Mark.
NOI on Arizona Natural Gas Infrastructure Strawman Proposal and Workshop Comments of Sempra Energy Global Enterprises September 25, 2003.
Natural Gas A World of Volatility Patrick J. Strange Senior Vice President Energy Marketing & Trading Conference University of Houston January 26, 2006.
1 Questar Pipeline Current Capacity and Development Shelley A. Wright Director, Business Development May 15, 2007 Wyoming Pipeline Authority Meeting.
Rockies Alliance Pipeline Wyoming Pipeline Authority Meeting Casper, Wyoming October 21, 2008 Gaylen Haag.
Gas supply and infrastructure – New South Wales APA Group presentation – Energy Forum Armidale 17 th Aug 2012.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Wyoming Pipeline Authority August 24, 2004 Mark C. MoenchJohn R. Smith Vice President and General Counsel Director, Regulatory and Governmental Affairs.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
Energy Action Plan Natural Gas Update California Public Utilities Commission California Energy Commission Randy Roesser December 8,
Jeff Rawls Vice President, Business Development West Region Gas Pipelines August 30, 2005 Wyoming Pipeline Authority.
® July 30 th, 2014 Utah PSC Technical Conference.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
El Paso Natural Gas Company Docket Nos. RP , RP , RP , and RP Robert Petrocelli, Ingrid Olson, Elizabeth Zerby.
Cherry Point Cogeneration Project Overview Presented to NWPPC Cogeneration Round Table June 24, 2003.
Arizona Corporation Commission Energy Workshop February 16, 2001.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
CALIFORNIA ENERGY COMMISSION NATURAL GAS ASSESSMENT: SHORT AND LONG TERM Briefing to the Legislature Assembly Utilities and Commerce Committee January.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Benefical Use of Digester Gas Point Loma Wastewater Treatment Plant Industrial Energy Association April 8, 2015.
Pivotal Energy Development Central Valley Gas Storage (CVGS) Request for Interest – January, 2014.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure February 13, 2004.
California Energy Commission Natural Gas Outlook IEPR Commissioner Workshop on 2015 Natural Gas Outlook Report Monday, September 21, 2015 Anthony Dixon.
Fuel Prices TEPPC 2026 CC Data Work Group January 26, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
n Water in a high reservoir has potential energy n The water is allowed to fall under gravity n The water gains kinetic energy n The kinetic energy drives.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
Enron Transportation Services. AC_01_ETS -1 Enron Transportation Services Innovative…Creative…Safe…Reliable Strong Returns with Consistent Earnings and.
Operations Directors Conference October 9, 2001
Northern Border Partners (11.8%)
Privileged and Confidential
California Energy Solutions Group
Privileged and Confidential
ALBUQUERQUE TEAM MEETING November 7, 2001
Is New England Over-Reliant On Natural Gas?
Wyoming Business Alliance/Wyoming Heritage
2019 NATURAL GAS OUTLOOK WORKSHOP Presentation to the OPUC
Presentation transcript:

Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004

2 Overview Map Markets Supply Basins Timeline

3 Silver Canyon Pipeline Needles Topock Blythe/ Ehrenberg Phoenix San Diego Las Vegas Tucson El Paso Albuquerque Blanco Blythe Energy Power Plant Harqualhala Panda Gila River Plant Palo Verde Arlington Valley Mesquite Redhawk West Phoenix Proposed Copper Eagle Storage Silver Canyon Pipeline Market Hub Power Plant 3 rd Party Pipeline

4 Markets Arizona Phoenix area Utility LDC (2 proposed interconnects with SWG) Power Plants: Hoping to serve the 6300 MW of new generation near Palo Verde California (Ehrenberg) SoCalGas Baja Norte

5 Supply Basins Rocky Mountains (TransColorado) Significant increase in Piceance/Paradox production over next 5 years TransColorado 125,000/d expansion to San Juan Hub 4 th Qtr San Juan Slight production decline over the next 10 years, but increased south flow from Rockies will fill the gap

6 LNG Access from Baja Firm transportation is offered from supply sources at Ehrenberg (LNG) to markets East of California (Phoenix) Pipeline segment from Phoenix to Ehrenberg will be bi-directional 300,000 MMBtu/d

7 Timeline Open Season Closed April 30, 2003 Mid-2006 In-Service date (depends on customer needs)

8 Here’s what you get with Kinder Morgan Flexibility Contractual flexibility Seasonal contract volumes, sculpted contract volumes Receipt to delivery point pathing Alternate receipt and delivery points (including out of the path) Primary firm transportation from Ehrenberg to Phoenix area Fully segmented, Order 637 compliant Operational flexibility 16/24 hour gas day

9 How we are different from other expansion projects Kinder Morgan has strong balance sheet which allows flexibility when raising capital for expansions/acquisitions Access to the Rocky Mountain, San Juan Basins (vs. Permian) and LNG Lower fuel Pipeline industry experience Commercial Construction and Operations

10 Contact Information Business Development Team Steven M. Harris, Vice President Lorraine M. Lindberg, Manager Kimberly S. Watson, Director