AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Space Charge meeting – CERN – 09/10/2014
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
1 Muon acceleration - amplitude effects in non-scaling FFAG - Shinji Machida CCLRC/RAL/ASTeC 26 April, ffag/machida_ ppt.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
4 th Order Resonance at the PS R. WASEF, S. Gilardoni, S. Machida Acknowledgements: A. Huschauer, G. Sterbini SC meeting, 05/03/15.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Beam-beam effects in eRHIC and MeRHIC
Summary of Working Group 1
Presentation transcript:

AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang

2 Status lSource polarization has been up lately, the average of past one week is about 82%. The vertical emittance at AGS flattop has been reduced with several optical changes (two tunes closer to each other around 200ms, reduce vertical chromaticity after 350ms). The reported vertical normalized rms emittance is about 3.2pi (was 5pi) at flattop with 2*10 11 intensity. lA new set of JQ timing has been put into use and an overall timing scan has been done. This new set of timing coincides with the -0.5ms shift in the later part of ramp, so it seems the mysterious shift of -0.5ms is gone. With smaller emittance, higher source polarization and new timing, we get above 70% polarization with 2*10 11 intensity. lWe have set up a faster ramp on user2. The ramp is shortened by about 50ms (out of 430ms). It is faster in the early part. The motivation is to preserve emittance(such as space charge near injection), and secondary effect is to cross the early depolarizing resonances faster. The polarization with JQ off is in the middle of 60% with 2*10 11.

Haixin Huang 3 Booster Setup lBooster injection tune setup study: compare the near half integer setting vs. 4.9 setting. It showed that the near half integer setting is better but the vertical tune needs to be pushed further away from half integer, due to higher intensity. lThe benefit of higher input intensity from linac: the stop band tuning is easier, as the effect is visible with higher input. We set up stop band correction with much higher input and then lower intensity for operation. lWe have set up a faster Booster user on Booster user8. The motivation is to reduce emittance, but we still need machine time to judge if it works.

Overall JQ Timing Scan (2/14-16) 4 Not a good Gaussian shape, but good polarization at expect timing. (fitted by Yann)

Haixin Huang 5 AGS Polarization Profile at Flattop Date P V max R H P H max R V P 0_mea P 200MeV -> P 0 1/ / / / / The measured and expected P 0 agreement is reasonable. 2.The recent gain of polarization is seen in the reduction of polarization profiles. P 0 is the polarization with zero emittance or source polarization. P v max equivalent to fixed target measurement done with vertical target.

Haixin Huang 6 How Sensitive Are the Parameters? Date P V max R H P H max R V P 0_mea P 200MeV -> P 0 2/ The measured and expected P 0 agreement is more sensitive to P max than to R value. Unless we assume we significantly overestimate the R value and P max (the last row), we could not get good agreement. 2.From RHIC measurements in the past, the R value is around at injection, which set a constraint on how far we can change the R value.

Haixin Huang 7 RHIC Polarization and R values Store Injection Ring P R P R Y Y B B These are offline measurements for all measurements. Horizontal and vertical targets are mixed. 2.If we used same R value for both planes, the P 0 is below 70% for all of them. If we assume all polarization loss is emittance related, then the polarization loss should be reflected in R values. P 0 should be near the value from AGS, just a few percent lower due to spin mismatch at injection (0.96 for blue and 0.99 for yellow).

Haixin Huang 8 Near Term Job List l Reduce the emittance in the AGS (faster Booster and AGS ramps). l Evaluate the jump quad timing derivation with averaged frequency meter data. l Beta function measurement at IPM (vertical E15 has been studied so far) and eIPM. l eIPM setup. Gas leak of horizontal eIPM is fixed. l Setup various flattops for emittance and polarization measurements. Start from 40.5, then 31.5, 22.5, 13.5 and 7.5 if time allowed.

Haixin Huang 9 Backup Slides

Haixin Huang 10 AGS Polarization Rate Correction The correction effect is small: relatively 5%.