Shore Station UPS Requirements for the NEPTUNE Power System

Slides:



Advertisements
Similar presentations
Solarwind solutions The Hybrid Home Customer presentation.
Advertisements

Battery Backup/ Uninterruptible Power Systems Reliable Power-----Is important to effectively maintain signal controls and communications for life and safety.
VE.Net Matthijs Vader VE.Net Product Manager. VE.Net Panel (VPN) Same size as Phoenix Multi Control Compatible with all VE.Net devices.
Copyright © 2010 The Alpha Group. All Rights Reserved. 2) Headends and Hubs.
Uninterruptible Power Supply (UPS)
Lineage Power - Total Efficiency TM Smart Grid A Telecom / Commercial consumer’s perspective Paul Smith – Technical Marketing Manager, Lineage Power
BPS12 Battery Power Supply. December 2003 Page 2 Better Than Standard UPS systems Longer battery life –unique charging scheme DC power output –instead.
LP33 Series UPS kVA 400Vac/CE
Reliability of present dc system is high, but could increase if a redundant battery or a redundant battery system were put in parallel with present system.
Jon Sunde – Master Electrician, Trystar
EET 450 – Advanced Digital Chapter 24 Power. Power Supplies Power conversion Performs a voltage conversion from either 120vAC to desired or 12vDC to desired.
1 Team BUSS Backup Storage Source. 2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members.
AC Power Supplies Applications –Standby source for “critical” loads (computer) –Primary source when normal ac not available Uninterrupted Power Supply.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Electricity Infrastructure: Overview and Issues (1) H. Scott Matthews February 13, 2003.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
Nameplate Test Results for 30 Watt Solar Panel Shown in Class, Nov.
Shipboard Electrical Distribution …“Shifting the Electric Plant to a Normal Full Power Lineup.”
Chapter 1 Aircraft Electrical System. Chapter 1 Aircraft Electrical system Electrical component Storage Battery DC & AC Generator Control and Protection.
MidNite Solar’s Pre wired solutions for Off Grid, Battery based Grid tie and AC coupled. MidNite Solar
Ph Fax
MidNite Solar’s Pre wired solutions for Off Grid, Battery based Grid tie and AC coupled. MidNite Solar
No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means – electronic, mechanical, photocopying,
Solar Power EDSGN 100 Sec. 13 Design Team 1 Kyle Feaster Alex Shivetts Kait Levin.
The First Central Emergency & Standby Lighting System Combining Storage Batteries & Generator Input 1 1.
Off-Grid Power Using Enphase Micro-Inverters Off-grid inverter systems, using batteries, can be used to provide AC power when the grid is down. It is possible.
GE Critical Power © 2010 General Electric Company. All Rights Reserved. This material may not be copied or distributed in whole or in part, without prior.
Shipboard Electrical Distribution References Required Introduction to Naval Engineering – Ch 17.
Wind and Hydro Power Technologies Spring 2011.
DC Superconductor Cables for Long Distance Transmission 2009 Mid-America Regulatory Conference Traverse City, MI June 14-17, 2009.
AC Active Load Group Members: Alex Nestico Mark Fraysier Richard Jennings.
Michael Ikerionwu 4 th year Electronic Engineering.
Hinchinbrook Island Researcher: Gordon Dalton PhD student Supervisor: Dr David Lockington.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
NEPTUNE Power System Shore Station Power Supply Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
Solar Powered Charging Station: Mid-Term Presentation Design Team: Ben Hemp Jahmai Turner Rob Wolf, PE Sponsors: Conn Center for Renewable Energy Dr. James.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
PowerSouth Lowman AC/DC Essential Voltage System.
Elements of a Small Off-Grid 24 Volt Solar System (Installed by Mack Grady at Gary Grady’s cabin, 15 miles north of Silverthorne, CO, in the Gore Range.
Red Rocks Community College ENY 130 Grid-Tied PV Fall 2009 Module 2.
50th HPC User Forum Emerging Trends in HPC September 9-11, 2013
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Steady State Analysis Of A Microgrid Connected To A Power System
Electrical Systems Efficiency Bill Tschudi, LBNL
Distribution Systems-General
Power Quality Product Overview
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
FRCC System Restoration 2016 FRCC System Operator Seminar.
PRESENTATION. Parts of the PCOS (3) Operator LCD Screen with Counter (4) Printer Compartment (5) Transmission Port (9) “RETURN” Button (8) “CAST” Button.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
الاسبوع الحادي والعشرون تطبيقات المبدلات Inverter Application تطبيقات المبدلات Inverter Application.
1\ Backup system for solar on-grid installation 1 1pcs XTM inverter charger, nominal power 3.5KVA, 30min. Power 4KVA AC DC Load2 (secured power)
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Technical Panel Session. Sunday January 11, DC System Failure Modes IEEE PES SBC Winter Meeting. January 11 – 15, New Orleans, LA Part 3.
Energy Conference and Exhibition 2007 Best Practices for Energy-Efficiency in Critical Power Applications Kit Killingsworth.
(345) (345)
Uninterruptible Power Supply (UPS)
Electricity is produced at the power station.
Electrical Systems Efficiency
7. Power in electric circuits
Vita 83 Working Group proposal for Rugged packaging,
Inverters Converting dc to ac
Pietro Manni, P.Eng. PQ Logic Corporation
Electrical Energy Sources
—Two power conditioning units (PCU)’s needed only if batteries are added for grid failure —AC output is consistent with the requirements of most loads.
Components inverters Except where otherwise noted these materials are licensed Creative Commons Attribution 4.0 (CC BY)
Inverters Converting dc to ac
Presentation transcript:

Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL

Background 2 Shore Stations – each able to individually power to the network, although with possible reduced capability West Coast of Vancouver Island Planned visitor center at Victoria Existing cable stations at Port Alberni, Bamfield Oregon Coast Existing cable stations at Nedonna Beach, Rockaway, Pacific City, Bandon

Local Utility Power Reliability 2 Substations, each located about 8 miles away Station currently served by 1, possibility of connecting to both substations with a switch Several outages of 30-60 minutes per year can be expected – mostly from trees/branches

UPS Alternatives DC System Typical for Telecom Systems Most equipment requires 48 VDC AC-DC rectifiers supply power to batteries and equipment If utility power fails, batteries are always on-line 3-8 hour battery life typical, generator optional DC-AC inverter for critical AC loads (minimal)

Traditional Telecom Power Feed Equipment (PFE)

UPS Alternatives AC System Typical for Information Technology, Network, Hospital, Commercial and similar facilities Most equipment requires 120VAC If utility fails, run on battery until generator starts 10 minute battery life, typical One or more generators for AC backup

Typical IT UPS System with a backup generator

Selection Criteria Reliability Load Voltage and Power Requirements Cost

Reliability - DC

Reliability - AC

Load Power Requirements Expected NEPTUNE Shore Station Load is mostly AC equipment Power Estimate – 120 kW total 100 kW seafloor cable load 20 kW terrestrial load Current Estimates 48 VDC → 2500 A 480 VAC, 3Ф → 144 A

Cost For Loads < 25 kW For Loads > 25 kW Batteries cost less Batteries have smaller footprint For Loads > 25 kW Generator costs less Generator has smaller footprint

Criteria for selecting a UPS System Item AC DC Simplicity X Reliability Majority of Load Voltage - 120AC Load Power Requirement – 200 kW Foot Print Size Cost Criteria for selecting a UPS System

Conclusions Need to learn more about Shore Station power requirements Need to confirm reliability/availability data Need to learn more about similar installations