IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Wind Power Forecasting Indian Wind Turbine Manufacturer's Association.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Indian Electricity Grid Code – 2010
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Review of SONI Power System Operations Alex Baird Grid Operations Manager Real Time.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Renewable Regulatory Fund (RRF):- Implementation Mechanism
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Philippine Feed-In Tariff System Implementation 1.
Variable Load on Power Stations
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access Power Purchase
Operationalizing One Nation One Grid
Open Access.
Reactive Power Task Force
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Economic Operation of Power Systems
Congestion regulations
IN INTER-STATE TRANSMISSION
EE5900: Cyber-Physical Systems
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
National Institute of Wind Energy(NIWE)
Presentation transcript:

IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1

Background CERC in September, 2009 constituted a Task Force with representation of Engineering Wing of the Commission Staff, CEA, System Operator, C-WET, WISE and State Commissions/ Utilities/ SLDCs of Tamil Nadu, Rajasthan, Gujarat and Karnataka for integration of renewable sources energy into the Grid Three meetings of Task Force held on , & and its decisions were incorporated in Grid Code issued on

Scheduling Procedure for Wind Generators As per sub-regulation 23 of Regulation 6.6 of IEGC,2010  Scheduling of wind power generation plants shall be done with effect from ( now w.e.f ) for the purpose of UI where i) the sum of generation capacity of such plants connected at the connection point to the transmission or distribution system is 10 MW and above and ii) connection point is 33 KV and above and iii) where PPA has not yet ( by ) been signed. 3

Scheduling Procedure for Wind Generators- Cont.  For capacity and voltage level below this, as well as for old wind farms it could be mutually decided between the Wind Generator and the transmission or distribution utility, as the case may be, if there is no existing contractual agreement to the contrary.  The schedule by wind power generating stations may be revised by giving advance notice to SLDC/RLDC, as the case may be. Such revisions by wind power generating stations shall be effective from 6 th time-block,the first being the time –block in which notice was given.  There may be maximum of 8 revisions for each 3 hour time slot starting from 00:00 hours during the day. 4

Scheduling Procedure for Solar Generators  The schedule of solar generation shall be given by the generator based on availability of the generator, weather forecasting, solar insolation, season and normal solar generation curve and shall be vetted by the RLDC in which the generator is located and incorporated in the inter-state schedule.  If RLDC is of the opinion that the schedule is not realistic, it may ask the solar generator to modify the schedule. 5

Scheduling Procedure for Renewable Generators  Concerned RLDC and SLDC shall maintain the record of schedule from renewable power generating stations based on type of renewable energy sources i.e wind or solar from the point of view of grid security.  While scheduling generating stations in a region, system operator shall aim at utilizing available wind and solar energy fully. 6

Forecasting for Wind Generation As per Para 3 of Annexure-1 ( Complementary Commercial Mechanism) of IEGC  Wind energy being of variable nature, needs to be predicted with reasonable accuracy for proper scheduling and dispatching.  Wind generation forecasting can be done on an individual developer basis or joint basis for an aggregated generation capacity of 10 MW and above connected at a connection point of 33 kV and above.  If done jointly, the wind forecasting facility shall be built and operated by wind developers in the area and sharing of the cost shall be mutually discussed and agreed. 7

Forecasting for Wind Generation As per Para 4 of Annexure-1 ( Complementary Commercial Mechanism) of IEGC  The wind energy forecasting system shall forecast power based on wind flow data on day ahead basis.  Wind/ power forecast with an interval of 15 minutes for the next 24 hours for the aggregate Generation capacity of 10 MW and above. 8

UI Mechanism for wind Generators As per Para 5 of Annexure-1 ( Complementary Commercial Mechanism) of IEGC  The wind generators shall be responsible for forecasting their generation upto an accuracy of 70%. Therefore, if the actual generation is beyond +/- 30% of the schedule, wind generator would have to bear the UI charges.  For actual generation within +/- 30% of the schedule, no UI would be payable/receivable by Generator, The host state, shall bear the UI charges for this variation, i.e within +/- 30%. 9

UI Mechanism for wind Generators- Cont. UI charges borne by the host State due to the wind generation, shall be shared among all the States of the country in the ratio of their peak demands in the previous month based on the data published by CEA, in the form of a regulatory charge known as the Renewable Regulatory Charge operated through the Renewable Regulatory Fund (RRF). This provision shall be applicable with effect from ( now w.e.f ),for new wind farms with collective capacity of 10 MW and above connected at connection point of 33 KV level and above, and who have not signed any PPA with states or others as on the date of coming into force of this IEGC ( i.e ). 10

UI Mechanism for wind Generators- Cont. As per Para 6 of Annexure-1 ( Complementary Commercial Mechanism) of IEGC  A maximum generation of 150% of the schedule only, would be allowed in a time block, for injection by wind, from the grid security point of view.  For any generation above 150% of schedule, if grid security is not affected by the generation above 150%, the only charge payable to the wind energy generator would be the UI charge applicable corresponding to HZ.( At present Rs 1.55/kWh) 11

Type of forecast required-Time Horizon Energy Forecast Over day month and year – Cash Flow of Wind Generator MW Forecast- Day ahead useful for System operation Ramp Forecast- Hours ahead -to reduce forecast gap 12

Operational Requirements As per Regulation 5.2 (u) of IEGC,2010:  System Operator ( SLDC/RLDC) shall make all efforts to evacuate the available solar and wind power and treat tem as a must run station.  However, system operator may instruct the wind or solar generator to back down on consideration of grid security or safety of equipment or personnel and the generators shall comply these directions. 13

Operational Requirements-contd. As per Regulation 5.2 (u) of IEGC,2010:  For this Data Acquisition system facility shall be provided for transfer of information to concerned SLDC/RLDC.  SLDC/RLDC may direct a wind farm to curtail its Var drawal/injection in case the security of grid or safey of any equipment or personnel is endangered. 14

Operational Requirements-contd. As per Regulation 5.2 (u) of IEGC,2010:  During the wind generator start-up, the wind generator shall ensure that the reactive power draw shall not affect the grid performance.  As per Regulation 5.3 (g) the SLDC shall take into account the wind energy forecasting to meet the active and reactive power requirements. 15

Variability of Wind Generation

Though there is much variation, the ramp-up & ramp down happens over several hours

Example New Mexico 204 MW

Forecast in Different Time Horizan

Case Study for implication on Wind Generator 20

Low Wind

Ramp up down change schedule 22

Suggestion 23

9/11/ Thank You