BY RAYMOND GREENLAW ARMSTRONG ATLANTIC STATE UNIVERSITY ABET-Accreditation Timeline.

Slides:



Advertisements
Similar presentations
Evaluation Team Chair Training
Advertisements

August July 2010 Annual Academic Calendar Colegio Los Robles.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Leading a Self-Study Preparation Raymond Greenlaw March 2004 Slide 1 q Leading a Self-Study Preparation by Dr. Raymond Greenlaw Dean, School of Computing.
Accurate and Efficient Accreditation Documentation Preparation Raymond Greenlaw April 2003 Slide 1 Main Menu q Accurate and Efficient Accreditation Documentation.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
Joint ATS-WASC Accreditation Reviews Jerry McCarthy, ATS Teri Cannon, WASC.
NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
National Thousands Block Number Pooling Services NANC Meeting January 13, 2004.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Library 1 Electronic Resources in the EUI Library Veerle Deckmyn, Library Director Aimee Glassel, Electronic Resources Librarian September 2, 2009.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
1 Lisa Alexander and Helen Dennis April 16, 2008 Data Updates/Data Review Form District Test Coordinator Meeting.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
GME Internal Review Basics Heather A. Nichols Accreditation Manager Office of Graduate Medical Education.
Richmond House, Liverpool (1) 26 th January 2004.
ABC Technology Project
2010 SACS-COC Annual Meeting December 6, 2010 CS-69 Administrative Program Review Assuring Quality in Administrative and Academic Support Units.
Accreditation in Applied Science Computing, Engineering, and Technology Dr. Raymond Greenlaw Department of Computer Science Armstrong Atlantic State University.
© S Haughton more than 3?
VOORBLAD.
An Overview of Some Issues Relating To the Accreditation Process Dr. Raymond Greenlaw Department of Computer Science Armstrong Atlantic State University.
School District U-46 Elementary Language Arts Literacy Framework Survey Results Created and distributed by the District Teacher Leader Curriculum Liaisons.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
Weekly Attendance by Class w/e 6 th September 2013.
How Cells Obtain Energy from Food
FISCAL YEAR END CLOSE AND ACCRUALS Presented by Laura Putz & Doug Nelson April 12 & 13,
Overview of the FEPAC Accreditation Process
Presentation transcript:

BY RAYMOND GREENLAW ARMSTRONG ATLANTIC STATE UNIVERSITY ABET-Accreditation Timeline

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

RIGOROUS PROCESS CHALLENGING REQUIRES ONGOING SUPPORT VALUABLE FOR CQI PROCESS POSSIBLE OUTCOMES ABET Timeline by Raymond Greenlaw April Introduction

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

JANUARY 31 DEADLINE REQUEST FOR EVALUATION FORM (RFE) GENERAL COMPREHENSIVE REVIEW (GR) INTERIM FOCUSED VISIT (IV) INTERIM REPORT (IR) SHOW CAUSE (SC) NEW PROGRAM (NEW) TERMINATION REQUEST NON-US REQUEST FOR APPROVAL FORM (RFA) Requesting a Site Visit April ABET Timeline by Raymond Greenlaw

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

COMMISSION DEPENDENT TYPES OF VISITS ASSIGNMENT OF TEAM CHAIR, ABET, MAY APPROVAL OF TEAM CHAIR, INSTITUTION, JUNE ASSIGNMENT OF PEVS, ABET PROF. SOC., JUNE/JULY APPROVAL OF PEVS, INSTITUTION, AUGUST Establishment of the Visiting Team April ABET Timeline by Raymond Greenlaw

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

INSTRUCTIONS BACKGROUND INFORMATION STUDENTS PROGRAM EDUCATION OBJECTIVES OBJECTIVES, OUTCOMES, AND ASSESSMENT CONTINUOUS IMPROVEMENT CURRICULUM FACULTY FACILITIES SUPPORT INSTITUTIONAL SUMMARY ABET Timeline by Raymond Greenlaw April Self-Study Report

GROUP A = BACKGROUND INFORMATION, FACILITIES, SUPPORT, INSTITUTIONAL SUMMARY GROUP B = STUDENTS, FACULTY, CURRICULUM GROUP C = PROGRAM EDUCATIONAL OBJECTIVES; OBJECTIVES, OUTCOMES, AND ASSESSMENT; CONTINUOUS IMPROVEMENT ABET Timeline by Raymond Greenlaw April Self-Study Report

ABET Timeline by Raymond Greenlaw April Self-Study Report GroupFirst Draft Second Draft Third Draft AFebruary 1March 15May 1 BMarch 1April 15May 10 CMarch 15April 30May 15

DUE TO ABET JULY 1 KEEP IN MIND THAT ADMINISTRATORS MAY NEED TIME TO REVIEW THE REPORT FACULTY MAY LEAVE FOR THE SUMMER ABET Timeline by Raymond Greenlaw April Self-Study Report

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

GRADED STUDENT WORK REQUIRED TEXTBOOKS PROGRAM MATERIALS MATERIALS FROM SUPPORTING UNITS FACULTY VITAE FINANCIAL DATA LIBRARY MATERIALS ASSESSMENT MATERIALS *FACULTY DEPARTURES* ABET Timeline by Raymond Greenlaw April Preparing Materials

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

PROGRAM HEADS OF SUPPORTING UNITS CHIEF FINANCIAL OFFICER HEAD OF TECHNICAL SUPPORT LAB MANAGER HEAD LIBRARIAN ASSESSMENT OFFICER RESEARCH AND DEVELOPMENT REP REGISTRAR OTHERS ABET Timeline by Raymond Greenlaw April Coordinating with Others on Campus

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

PREPARING THE VISIT SCHEDULE ADMINISTRATION FACULTY STUDENTS SUPPORTING UNITS MEETING TIMES LOCATIONS PERSONNEL INVOLVED ABET Timeline by Raymond Greenlaw April Site-Visit Schedule

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

SUNDAY-TUESDAY DISPLAY ROOM MEETINGS MONDAY LUNCHEON LOGISTICS EXIT INTERVIEW ABET Timeline by Raymond Greenlaw April Site Visit Itself

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

April Due Process ActivityTime Frame 7-day response7 days after visit Receive Draft Statement2-3 months after visit Respond to Draft StatementDue 30 days after receipt Correspond with ABET as needed Until July Commission Meeting Receive final actionAugust-September

Outline Introduction Requesting a Site Visit Establishment of the Visiting Team Self-Study Report Preparing Materials Coordinating with Others on Campus Site-Visit Schedule Site Visit Itself Due Process Important Events Summary April ABET Timeline by Raymond Greenlaw

April Important Events Summary ActivityTime Frame Collect student work1-2 years prior to visit Submit RFEJanuary 31 Prepare Self-StudyJanuary-June Develop visit scheduleAugust-October Host ABET visit3 days September/December