Compensation of Transient Beam-Loading in CLIC Main Linac

Slides:



Advertisements
Similar presentations
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Advertisements

Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
Design of Standing-Wave Accelerator Structure
CLIC Drive Beam Injector Design Update Shahin Sanaye Hajari 1.Institute For Research in Fundamental Sciences (IPM), Tehran, Iran 2.CERN, Geneva, Switzerland.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Sub-Harmonic Buncher design for CLIC Drive Beam Injector Hamed Shaker School of Particles and Accelerators Institute for Research in Fundamental Sciences,
Room temperature RF Part 2.1: Strong beam-cavity coupling (beam loading) 30/10/2010 A.Grudiev 5 th IASLC, Villars-sur-Ollon, CH.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
CLIC Drive Beam Beam Position Monitors International Workshop on Linear Colliders 2010 Geneva Steve Smith SLAC / CERN
R&D Programme for RT Phase Feedback Giulio Morpurgo.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
H.H. Braun, Structure WG, Permissible Trip Rates for 12 GHz structures in CLIC  Type of break downs  Permissible rate for type I RF breakdown.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
The CLIC decelerator Instrumentation issues – a first look E. Adli, CERN AB/ABP / UiO October 17, 2007.
RF DEFLECTORS AT CTF3 BNL/US-LARP/CARE-HHH MINI-WORKSHOP ON CRAB CAVITIES FOR THE LHC Brookhaven National Laboratory, Upton NY Feb 25-26, 2008 Fabio Marcellini.
Frequency-domain study of acceleration & beam loading based on a circuit model by raquel fandos.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Beam breakup and emittance growth in CLIC drive beam TW buncher Hamed Shaker School of Particles and Accelerators, IPM.
CLIC Drive Beam Injector Bunching System Sh. Sanaye H. 1,2, S. Doebert 2, S. H. Shaker 1,2 1.Institute For Research in Fundamental Science (IPM), Tehran,
Work-packages CLIC for the Drive Beam BJ, 23 feb 2010 Beam Dyn Meeting 2/23/11Beam Dyn meeting1.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
I. Syratchev, CLIC Breakdown Workshop, CERN, 20 May 2008 Power Circulation in a CLIC Accelerating Structure I. Syratchev.
CLIC Power Extraction and Transfer Structure.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
I. Syratchev, structure team meeting, Re-circulation Re-visited I. Syratchev.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
Beam quality preservation and power considerations Sergei Nagaitsev Fermilab/UChicago 14 October 2015.
X-band Based FEL proposal
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
RF Pulse Compression system for CTF3.
A. Aksoy Beam Dynamics Studies for the CLIC Drive Beam Accelerator A. AKSOY CONTENS ● Basic Lattice Sketches ● Accelerating structure ● Short and long.
Multi-stage pulse compressor
with operating voltage
Optimisation of single bunch linac for FERMI upgrade
RF Power Generation and PETS Design
Have a chance to operate your own beam at CERN
Brief Review of Microwave Dielectric Accelerators
Tolerances: Origins, Requirements, Status and Feasibility
CLIC Drive Beam Klystron Modulators
Update of CLIC accelerating structure design
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
Electric Field Amplitude (MV/m)
RF Pulse Shaping.
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Compensation of Transient Beam-Loading in CLIC Main Linac Oleksiy Kononenko, Alexej Grudiev IWLC, October 20, 2010

Contents Motivation Calculation of unloaded/loaded voltages Optimization of the pulse shape Spread minimization for BNS damping and transient in the subharmonic buncher Effects of the charge jitters in drive and main beams Conclusions

Motivation: CLIC Performance Issue In order to have luminosity loss less than 1%, the RMS bunch-to-bunch relative energy spread must be below 0.03% *CLIC-Note-764, private conversations with Daniel Schulte (CERN)

Beam Loading: Steady State *Beam loading for arbitrary traveling wave accelerating structure. A. Lunin, V. Yakovlev

Energy Spread Minimization Scheme Unloaded Voltage in AS fix phase switch times in buncher generate corresponding drive beam profile take into account PETS (+PETS on/off) bunch response calculate unloaded voltage Klystron (reference) pulse Loaded Voltage in AS calculate AS bunch response calculate total beam loading voltage - add to unloaded voltage Energy Spread Minimization varying buncher delays

Electric Field Distribution for Port and Plane Wave Excitations Considering T24 CLIC main accelerator structure

Accelerating Voltage for the Port excitation and Beam Impedance Eportz (z,f) → [ exp ( ± i *z *ω/c ) ] → [ ∫ dz ] → VU (f) Epwz(z,f) → [ exp ( ± i *z *ω/c ) ] → [ ∫ dz ] → V (f) → [IHFSS = 2*π*r * E0 / Z0] → Z(f)

Envelopes of the Time Response for the Port Excitation and Wake Potential

CLIC Drive Beam Generation Complex *CLIC-Note-764

Drive Beam Combination Steps fbeam = 4 * 3 * 2 * fbuncher 12 GHz 3 GHz 1 GHz 0.5 GHz

PETS: Single Bunch Response *kindly provided by Alessandro Cappelletti, Igor Syratchev (CERN)

PETS: Generated Rectangular Pulse No delays, just nominal (~240ns) switch times in buncher trise ≈ 1.5 ns

Rectangular Pulse in Main Linac Optimizing injection time one can optimize the energy spread down to the level of 6% only

Schematic Pulse Shape for CLIC

Optimization Algorithm Brief Description: 1. Fix injection time 2. Generate delays 3. Find the minimal energy spread and optimal delays 4. Repeat 2. starting from the optimal delays

Energy Spread Calculation Vbeam(t) Vunloaded r(t) pCLIC(t)

Energy Spread Optimization Utility

Corresponding switch delays in buncher Optimized Pulse Shape Corresponding switch delays in buncher

Optimized Energy Spread along the Main Beam RMS bunch-to-bunch relative energy spread is around 0.03%

Model Improvements For BNS damping it is necessary to inject bunches a bit (10 - 30 deg) off-crest Take into account transient in the subharmonic buncher during DB phase switch

Energy Spread Dependence on the Injection Phase CLIC constraint

Optimal Switch Delays for the Different Injection Phases

Transient in the Subharmonic Buncher During DB Phase Switch

Energy Spread Dependence on the Buncher Switch Time Currently in CTF3

Optimal Switch Delays for the Different Buncher Switch Times

Study of the Charge JitterInfluence on the Energy Spread Gaussian drive/main beams charge distribution with relative rms spread of 0.1% “White noise” jitter of the charge along the drive/main beams

Drive Beam Charge Spread Effect CLIC constraint Constraint of 0.1% charge spread in drive beam (D. Schulte, CERN) is ok for the energy spread minimization

Main Beam Charge Spread Effect CLIC constraint Constraint of 0.1% charge spread in main beam (D. Schulte, CERN) is ok for the energy spread minimization

Conclusions Developed pulse shape optimization method allows to reach acceptable level of 0.03% in the main beam energy spread Performing optimization for the different possible buncher switching times and injection phases the same CLIC acceptable level of energy spread is reached 3. Randomly distributed along the bunch train 0.1% rms spread charge jitters in drive and/or main beams don’t increase the final energy spread in the main beam

Thank You for the Attention!