FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.

Slides:



Advertisements
Similar presentations
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Advertisements

N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
Sample servo diagrams and Bode plots. Acousto optic performance plots Unlock servo Measure gain and phase vs drive input K.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
5A BOARD TESTS TALITHA BROMWICH Friday, 20 March Talitha Bromwich, FONT Group Meeting DIG IN THRESHOLDS ADC LEVELS FROM STARTUP GENERAL INPUT/OUTPUT.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Analogue BPM data analysis Calibration & resolution results.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
NanoBPM Signals Second Mini-Workshop on Nano Project at ATF December 11-12, 2004 Toyoko Orimoto Yury Kolomensky Lawrence Berkeley Laboratory & University.
GEM MINIDRIFT DETECTOR WITH CHEVRON READOUT EIC Tracking Meeting 10/6/14 B.Azmoun, BNL.
Cavity BPM processing and hardware upgrade plans A. Lyapin, S. Boogert, E. Yamakawa.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
‘BBA’ Goals Understand BPM performance –validate use for precision optics tests –justify & specify hardware/software upgrades Beam – Based ‘Alignment’
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
2. Plant vs Animal Cells Describe the differences between plant and animal cells Identify organelles under the electron microscope.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Gustavo Cancelo Analysis of the phase shift error between A and B signals in BPMs BPM project.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
Triumf BPM test in CALIFES, week 25 Shengli Liu, Wilfrid Farabolini, Victor Verzilov, Steffen Doebert.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Re-entrant BPM R&D for ILC Main Linac
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
Monitoring glitches in the frequency divider
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
ATF2 Instrumentation Stewart T. Boogert
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Status of Phase Feedforward Tests
SLAC - End Station A ILC testrun – April '06 ...
FONT stripline BPM resolution
FONT5 sampling jitter investigations
Fitting to the Linear Region of I’/q
C.2.10 Sample Questions.
Linac Diagnostics Commissioning Experience
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Presentation transcript:

FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July BPM res – jitRun26_0dB_030 End of the final shift High-beta optics Charge 0.3 x C-band filters 2

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 Resolution vs sample number - jitRun26_0dB_030 Best geometric: / um at sample number 63 (Outside central region, resolution explodes and waveform shape at minimum is not visible) 3

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 Resolution vs sample number - jitRun26_0dB_030 Best geometric: / um at sample number 63 (Plotted region around minimum resolution) 4

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July BPM res – resol_0dB_8_FB_off December 2014 High-beta optics Charge 0.4 x MHz BPF on second stage electronics 5

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 Resolution vs sample number - resol_0dB_8_FB_off Best geometric: / um at sample number 61 (Outside central region, resolution explodes and waveform shape at minimum is not visible) 6

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 Resolution vs sample number - resol_0dB_8_FB_off Best geometric: / um at sample number 61 (Plotted region around minimum resolution) 7

FONT GROUP MEETING APPENDIX Waveforms and calibrations for two data sets Talitha Bromwich - Monday, 20 July

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 AY Mover Scan - jitRun26_0dB_030 9

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 BY Mover Scan - jitRun26_0dB_030 10

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 CY Mover Scan - jitRun26_0dB_030 11

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 AY Mover Scan - IPB_0dB_recheck_cal 12

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 BY Mover Scan - IPB_0dB_recheck_cal 13

FONT GROUP MEETING Talitha Bromwich - Monday, 20 July 2015 CY Mover Scan - IPC_0dB_recheck_cal 14