EMDM3001081 Monolithic suspension development Activity plan Piero Rapagnani Detector meeting 30-01-2008.

Slides:



Advertisements
Similar presentations
R. Kumar 1, K. Tokmakov 2, A. V. Cumming 1, G. D. Hammond 1, J. Hough 1, S. Rowan 1 1 SUPA, University of Glasgow, Glasgow, G12 8QQ, UK, 2 SUPA, University.
Advertisements

2 mm diameter region 300 micron thermoelastic noise cancellation section Neck region, for transition from 2 mm stock to 300  m fibre 150  m section for.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Installation of the new end mirror 1Frans Mul - July 2008.
Aspects of Fused Silica Suspensions in Advanced Detectors Geppo Cagnoli University of Texas at Brownsville and TSC LIGO, Hanford.
Low Mechanical Dissipation in Fused Silica S. D. Penn, G. M. Harry, A. M. Gretarsson, S. E. Kittleberger, P. R. Saulson, J. J. Schiller, J. R. Smith, S.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
Payload design methods versus modeling E. Majorana.
Silica Research in Glasgow Gianpietro Cagnoli – IGR - University of Glasgow GEO Collaboration Ginzton Lab, Stanford Caltech.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Review of HAM Suspension Designs for Advanced LIGO Norna A Robertson HAM Isolation Requirements Review Caltech, July 11th 2005.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Development of a CO 2 laser machine for pulling and welding of silica fibres and ribbons D. Crooks for the GEO 600 collaboration Aspen January 2005 LIGO-G Z.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
Low noise Fused Silica suspensions: from the GEO600 experience to the 2 nd generation requirements Geppo Cagnoli INFN Sez. Firenze University of Glasgow.
Cryo-payload Kazuhiro Yamamoto Institute for Cosmic Ray Research
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford.
18 th - 22 nd May 2015 LIGO-G GWADW Alaska Suspension Upgrades: Discussion Points + Questions Giles Hammond (Institute for Gravitational Research,
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Monolithic suspension assembly procedure (DRAFT) Status 27 th May 2009 LIGO-T v2.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
Thermal Noise performance of advanced gravitational wave detector suspensions Alan Cumming, on behalf of the University of Glasgow Suspension Team 5 th.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
“Detector activities” after the IB upgrade Michele Punturo.
Suspension Thermal Noise Giles Hammond (University of Glasgow) on behalf of the Strawman Red Team GWADW 2012, 18 th May 2012 LIGO-G
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
1 PAY & OSD Piero Rapagnani 26/02/ Fatal interference with current geometry: deep redesign of the payload needed Positioning another payload close.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
C1) K. Tokmakov on behalf of the Advanced LIGO Suspensions Team Monolithic suspensions of the mirrors of the Advanced LIGO gravitational-wave detector.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Monolithic suspensions in Virgo Helios Vocca Dipartimento di Fisica & INFN di Perugia LIGO-G Z.
Proposal for baseline change from ribbons to fibres in monolithic stage Mark Barton for the IGR Monolithic Team Systems Meeting 16 April 2008 G
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
My personal Resumé Very interesting work-shop, stimulating atmosphere and very good discussions. Accommodation is excellent. For the Straw Project we have.
Modelling and Testing of Cryogenic Suspensions Giles Hammond Institute for Gravitational Research SUPA University of Glasgow on behalf of the KAGRA suspensions.
Thermal Noise Workshop February 23rd, 2012 Paola Puppo – INFN Roma.
E. Majorana (INFN – Rome) ELiTES 3 rd General Meeting Hongo Campus – Tokyo – 9-10 Feb., 2015 Cryogenic platform with vertical suspension: a practical approach.
Overview of monolithic suspension work for Advanced LIGO Mariëlle van Veggel, Mark Barton, Tim Bodiya, Alan Cumming, Liam Cunningham, Giles Hammond, Gregg.
1 Advanced Virgo Monolithic Payloads P.Rapagnani Thermal Noise Workshop 2012_02_24-25.
1 Paola Puppo Last Stage Suspension Mechanics in Virgo+MS Piacciavi, generosa Erculea prole, ornamento e splendor del secol nostro, Ippolito, aggradir.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Update on the Fused Silica Suspension for Advanced LIGO Giles Hammond, on behalf of the Suspension Team L-V Meeting, Amsterdam, 22 nd -25 th September.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
BM&N STS ladders assembly in VLHEP
Stator Plan & Schedule Chris Booth 2nd March 2009
Assembly of the KAGRA 4-fiber sapphire prototype suspension
Michele Punturo WP3 meeting, Cascina 9-July-2004
Update on Pavia MM mechanical prototype
11 T Dipole Integration & Plans M. Karppinen
Ti/SS transitions A.Basti INFN-PISA*
Evolution of the Virgo detector: The Virgo+ plans
Gingin Advisory Committee Meeting 08 Dec 2009
Module/Ladder Assembly
R&D in Glasgow MATERIALS ACTIVITY AIM Silica
Presentation transcript:

EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting

EMDM Three Parallel Tasks 1) Steel wire suspension 2) Fibre wire suspension (new C assembly procedure) 3) Complete monolithic suspension 1)Set-up preparation 2)Delivery of fused silica parts 3)Bonding tests 4)Loss tests 5)Complete monolithic suspension 1)Resistance to shocks 2)Resistance to dust pollution 3)Resistance to humidity 4)Silica Dust Containment 5)Storage 6)Transport

EMDM ) Steel_proto_assembly / /02 New RM prototype (Aluminum,ready) New MAR prototype (PVC arms, ~ready) Dummy MI (Al, black, existing, side flats to be machined,~ready) Wires 200  m (ready) Spacers (Al, to be machined) RM coils (~ready) Mounting (non standard) Assembly check and integration of new marionette and new reaction mass.

EMDM ) Steel_proto_LC / /04 LC setup (Control chain calibration, basic control tests). Remarks: - control-DAQ crate ~ready (ADC config, CCD to be tested !!!) - CD crate to be installed. Test of new marionette and new reaction meas.

EMDM ) Fiber_NewEarOld_preparation (Old design revised, delivered in Feb-08) / /04 Improved mounting tools (optimizing C-tool design). Background activities: - fibre production - fibre tests and systematics - training for EGO support Remarks: - CO 2 laser performance checked and realigned. - bending point measurement machine ready. Assembly feasibility technique preparation.

EMDM ) Fiber_NewEarOld_integration / /05 Unmount Proto_steel suspension. Assembly Dummy Mirror, new_RM, new_MAR, fibres (using specific C-tool developed). Leave 1 week in the assembly frame. Integration and transport in the LC facility. Suspension prototype integration.

EMDM ) Fiber_NewEarOld_LC / /07 TF measurements Control tests Roboustness tests. Suspension prototype Local Control test. 1 st Milestone

EMDM ) Fiber_NewEarNew_preparation (New design, meant to separate welding from bonding, delivered in May-08) / /8 Improvement of the mounting tools. Pieces delivery. Bonding (silicate/water-glass) & losses tests. Suspension parts assembly. Background activities: - fibre production - fibre tests and systematics Assembly feasibility and technique preparation.

EMDM ) Fiber_NewEarNew_assembly_integration / /10 Suspension and roboustness using the assembly frame 1Week (min) stand. assembling using the payload prototype RM, MAR Suspension in the frame 2 nd Milestone

EMDM ) Safety and Transport studies Mar/08 - Feb/09 Infrastructure design Orders Construction Implementation… Completion of the monolithic suspension facility, an open task: hard to delineate methods beyond “conservative and reasonable”. Call for other EGO/Virgo collaborators ????

EMDM ) Best_Fiber_XX_LC / /12 Integration of the best solution found in the LC facility 3 rd Milestone Decision about the destiny of prototype with OldEarNew suspension (if still there). Integration of the NewEarNew suspension (if 2 nd Milestone OK) in the LC facility. TF measurements. Control tests. Roboustness tests.

EMDM Draft of the planning

EMDM ITEMMOTIVATIONPERIOD 1) Steel_proto_assemblyAssembly/check/integration of new marionette and new reaction mass. 2008: 28/01-28/02 2) Steel_proto_LCTest of new MAR and new RM.2008: 01/03-30/04 3) Fiber_NewEarOld_preparation (Old design revised, delivered 02-07) Assembly feasibility and technique preparation. 2008: 11/02-30/04 4) Fiber_NewEarOld_integrationSuspension prototype integration (1 week preliminary suspension on the frame, transportation in LC facilty) 2008: 01/05-31/05 5) Fiber_NewEarOld_LCSuspension prototype dynamical and roboustness tests 2008: 01/06-31/07 6) Fiber_NewEarNew_preparation (New design, meant to separate welding from bonding, deliv. 04/07) Assembly feasibility and technique preparation. Specific bonding tests. 2008: 01/02-31/08 7) Fiber_NewEarNew_assembly/ integration Suspension prototype test in the assembly frame (1 week) 2008: 01/09-31/10 8) Safety and Transport (TBD)Completion of the MS facilityMar/08 - Feb/09 9) Best_Fiber_XX_LCAssembly and test (in vacuum?) of the best solution found 2008: 01/11-31/12

EMDM people Further support ? (from EGO) - more technical support from local workshop and trained for skilled works (e.g. welding) + - infrastructure and safety (already involved, but could be officially appointed) + -operator for routinary production works once (fibres/quality/systematics)

EMDM Present suspension critical parts Fiber handling may induce damages on their surfaces Silicate bonding is strongly stressed by the weldling Welding the fiber on the lower clamp may induce cleaning problems

EMDM New monolithic design FS bar Upper clamp Lower clamp

EMDM New monolithic design - 2 CO 2

EMDM New monolithic design - 3

EMDM Stress distribution

EMDM Reaction mass

EMDM MACHINE Measurement of FS fibres bending length

EMDM MACHINE MEASUREMENT OF THE BEDING POINT: Referred to the tip of the fibre at both the ends Problems during the welding operation OTHER MEASUREMENTS POSSIBLE WITH THE MACHINE First violin mode Vertical bouncing mode Measurement of FS fibres bending length Full characterization on a set of fibres pulled with the CO 2 laser NEXT: valueaccuracy Bending length36.64 mm0.04 mm Violin mode445 Hz1 Hz Bouncing mode6.1 Hz0.1 Hz with respect to the tip

EMDM MACHINE Measurement of FS fibres bending length