FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training Part 6: ERR; Energy Vendors; Public Utilities Commission Presentation; EAP.

Slides:



Advertisements
Similar presentations
Coordinating Equitable Services for Private Schools Christine T. Miller Red Clay Consolidated School District December 7, 2010 DSU – Martin Luther King.
Advertisements

Massachusetts Department of Elementary & Secondary Education
Universal Services Offered for Poverty Level Residential Consumers by Exelon Corporation’s Distribution Utilities A. Karen Hill Vice President Federal.
DHS Family and Community Support Center Prevention Assistance Fund Patricia Erwin-Blue Michelle Wylie-Williams John Bowen Rich Kirschner February 2013.
The State of Ohio is an Equal Opportunity Employer and Provider of ADA Services. Office of Community Assistance, Home Weatherization Assistance Program.
LIHEAP & WAP A PARTNERSHIP. Reasons to Work Together Martin Niemoller Quote Similar target population Similar, if not the same, service delivery network.
Do Your Weatherization Standards Measure Up? WARM CHOICE Program Standards and Procedures Energy Essentials Core Contractor Training December 10 and 11,
Reference Guide Module 5: Billing November 2014 Reference Guide Module 5: Billing November 2014.
Why Implement a Program? Indiana, unlike other states, is without a safety net program Indiana relies solely on Federal LIHEAP funding which has not responded.
1 FFY2015 EAP Annual Training August 12 & 13, 2014 St. Cloud ERR, EAP WAP & WAP.
1 FFY2010 August 12 & 13, 2009 St. Cloud Minnesota Holiday Inn EAP Annual Training Section 5.0 Monitoring Includes Monitoring process & Focus and Quality.
1 FFY2015 EAP Annual Training August 12 & 13, 2014 St. Cloud PUC.
IACAA is an umbrella organization that represents non-governmental and local governmental organizations that were established for the purpose of fighting.
1 FFY2015 EAP Annual Training August 12 & 13, 2014 St. Cloud Propane Legislation & EAP.
0 External Billing Procedures: Information Session.
California LifeLine Telephone Program. 2 Program Goals Promote LifeLine Statewide to: Increase Awareness Increase Awareness Increase Enrollment in LifeLine.
CONSUMER PROTECTIONS AND SERVICE QUALITY March 14, 2011.
1 Improving the lives of 10 million older adults by 2020 © 2015 National Council on Aging The Low Income Home Energy Assistance Program (LIHEAP) 101 March.
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
NEW YORK Market Profile July NEW YORK Market Service Map Market Size: $21.7 Billion Market Potential 20.9 Million Potential Customers.
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
Openings, Closings, and Mergers Tutorial I 2013 Schools and Libraries Fall Applicant Trainings 1 Openings, Closings, and Mergers Tutorial Fall 2013 Applicant.
Elizabeth Katz Office of Consumer Policy New York State Department of Public Service
August 15 & 16, 2012 FFY2013 EAP Annual Training FFY2013 EAP Annual Training Part 5: Primary Heat; ERR; WAP Presentation; ROFW.
August 15 & 16, 2012 FFY2013 EAP Annual Training FFY2013 EAP Annual Training Part 3: Xcel Energy; Energy Vendors; Public Utilities Commission; Internal.
PURPOSE OF PAYROLL CERTIFICATION 1 The Payroll Certification is an important tool for Fiscal Officers and/or Delegates. It’s purpose is to allow Fiscal.
1 Utility Discount Program Update Energy Committee Briefing April 23, 2014.
Dealing with Customers’ Inability to Pay in Tough Economic Times The Memphis Light, Gas and Water Perspective Jerry R. Collins Jr., P.E. President & CEO.
FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training Part 7: Fiscal Management; Incidents & Appeals; Data Practices; National Program.
Updates and Opportunities for Collaboration Office of Economic Opportunity EAP Fall Training 2015 Jessica Rochester, MPH August 13, 2015.
1 FFY2015 EAP Annual Training August 12 & 13, 2014 St. Cloud Energy Vendor Chapter 3.
August 15 & 16, 2012 FFY2013 EAP Annual Training FFY2013 EAP Annual Training Part 4: Applications & Application Processing; Local Plan.
Weatherization 201: Weatherization Works! Updated September 23, 2008.
Wisconsin Home Energy Assistance Program (WHEAP) - Kenna Arvold, Lead Administrative Review Monitor - Jeff Heino, Administrative Review Monitor.
Urban League Low Income Home Energy Assistance Program LIHEAP.
FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training Part 8: Quality & Performance Controls; State Monitoring & Auditing; Grant.
Low Income Programs and Consumer Protections Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
Ratepayer and Customer Rights Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
PG&E Winter Bill Programs and Plans Low Income Oversight Board Meeting September 17, 2008 Sacramento, CA.
August 15 & 16, 2012 FFY2013 EAP Annual Training FFY2013 EAP Annual Training Part 8: EAP/WAP Internal Controls Assessment; Local Plan; Grant Contract;
Developing Plans and Procedures
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
E-Rate Training for TASBO Members October 8, 2008 Presented by Susan Sullivan Director of Technology/Media.
1 FFY2015 EAP Annual Training August 12 & 13, 2014 St. Cloud Crisis.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Universal Service Fund Program & Home Energy Assistance Program Overview NJ Dept. of Community Affairs PSE&G LIHEAP Agency Conferences 2015.
How do I know if I need to switch supplier?. What information do I need to know before I can compare energy prices? My usage (kWh) and costs (£) for energy.
Energy Assistance Program FFY2016 EAP Annual Training Crisis.
WELCOME - As you enter the room… Walk around, Read the posted questions, and Use the colored dots provided to select the four questions that are most important.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
Enhanced Wireless Funding through HB 361 Shawn S. Smith Interim Ohio Coordinator.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
The Art of Developing Policies A Look At Requirements, Trends & Challenges.
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
Low-Income Energy Assistance Program (LEAP) Lenore Dougan, Policy Advisor Regulatory Policy Ontario Energy Board Presentation to the Rental Housing Advisory.
Discussion of the Differences Public Works Law and Bid Law
Offering Hope & Delivering Help
Eric Hartsfield Director-Customer Assistance
NJ Dept. of Community Affairs PSE&G Energy Assistance Conferences 2017
CACFP Day Care Home Forms
Recommended Practices in Housing Credit Compliance
After the FCC Form 471 E-rate Program Applicant Training
FFY2013 EAP Annual Training
What We’ll Cover What is the Low-Income Home Energy Assistance Program (LIHEAP)? Who does LIHEAP help? Overview of LIHEAP How LIHEAP Works Eligibility.
National Consumer Law Center
Performance Measurement Report Pilot
Julie Ford-Williams Bureau Chief-Customer Assistance
NJ Dept. of Community Affairs PSE&G Energy Assistance Conferences 2018
Energy Crisis Intervention Program Community Action Agency Training
Presentation transcript:

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training Part 6: ERR; Energy Vendors; Public Utilities Commission Presentation; EAP WAP Coordination; WAP Presentation

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Ch 8. Energy Related Repair 2

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY14 Energy Related Repair Intention  Implement ERR changes and improvements  Clarify misunderstood policies and procedures By  Explaining changes  Responding to questions 3

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY14 Energy Related Repair Importance of ERR  ERR is response to life-threatening situations  Health & safety risks  Single largest benefit to a household, therefore at most risk and under most scrutiny  Stays with dwelling, not the individual  So, we need to be extra diligent – eligibility, benefit levels 4

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Training Topics  ERR Eligibility  Determining Benefit Delivery  Completing Services  ERR Payments  eHEAT Improvements  Questions 5 FFY14 Energy Related Repair

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY14 Energy Related Repair Proof of Ownership section addition (Pg 4)  “Service Providers should require contractors to notify them if the repair will cost over $1,000 before the contractor begins the repair work. Service Providers must then obtain ownership verification before the repair work occurs.” 6

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY14 Energy Related Repair ERR Eligibility - Improvements  “Medically Necessary Fuel Type Changes” – permanent (Pg 7)  “ERR funds may be used to change fuel types in medically necessary situations provided the household supplies a written doctor’s letter stating the need or disability. Medically necessary excludes short-term disabilities.” 7

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Determining Benefit - Changes Manual J is required (Pg 12)  It is not required to submit a bid or proposal  But it must be performed by the selected contractor before installing the heating unit  If costs increase after selected contractor calculates Manual J, all proposals/bids must be reevaluated 8

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 ERR Procurement (Pg. 8)  In FFY13 ERR expenditures were $6 million  Must follow Title 2 CFR Part 215  Must have written procedures in place for either option - part of Local Plan attachments  Cost-price analysis, quality-price analysis, special considerations  Master list of contractors, case-by-case contracting  Local Plan: Service Provider ERR procurement policy & procedures 9 Determining ERR Benefit Changes

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY14 Energy Related Repair Determining Benefit Delivery - Changes New section: Referring ERR Emergencies to WAP (Pg 6)  No-heat situations: The average temperature is expected to be below 45 degrees for 48 hours or more, or the temperature is at or below 32 degrees.  Life-threatening situations: A malfunctioning heating system is creating a life-threatening situation, e.g. a high level of CO in the flue of the heating system. 10

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Completing services - Improvements On Site Inspections section (Pg 10)  It is a best practice to get inspections done within 30 days of invoice receipt FFY14 Energy Related Repair 11

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 ERR Payments - New Payment improvements Payments section (Pg 10)  Payments for services must be made to contractors or energy vendors in a timely manner (within 60 days of completion of event)  Timely ERR payments – 30 days from inspection/receipt of invoice  Should have internal process to encourage contractors FFY14 Energy Related Repair 12

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 ERR Payments - New Payment improvements Recovery of Overpaid or Disallowed ERR Expenditures (Pg. 11)  Subject to repayment with non-federal funds  Contractors subject to repayment and unable to receive future EAP payments  Service Providers report suspected fraud to local authorities FFY14 Energy Related Repair 13

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Completing services - Improvements  Trigger change: When the last payment for an event is entered, it prompts letter ERR Notification letter 14

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 ERR eHEAT Screen Enhancements  ERR Tracking worksheet is optional  Still needed for referrals to WAP  Other changes were made to record more details for transactional information, self-monitoring and auditing for integrity FFY14 Energy Related Repair 15

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 In eHEAT there are two screens affected:  ERR Event Screen  ERR Task Screen  There is no change to the ‘Maintain Inspection’ screen FFY14 Energy Related Repair 16

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 ERR Event Screen  Does the household have Temporary Heat?  Does the household have redundant heat that heats essentially the same area?  Assessment fields  Ownership Verification FFY14 Energy Related Repair 17

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 ERR Task Screen  The “Describe Task” field specifies the details  Work Order Authorized Date  Authorized By  Work Complete Date  No changes to the ‘Inspection’ Screen FFY14 Energy Related Repair 18

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Paying a Single Task  For a single contractor with multiple tasks in an event you can now pay for a completed task even if there are other tasks in progress ERR Payment 19

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Ch 3. Energy Vendors 20

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY13 Overview  SPs sent payments to 839 energy vendors  Xcel, CenterPoint, MERC and MN Power serve approximately 75% of all EAP households  Training and Communication  Monitoring 21

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY13 Energy Vendor Payments VendorTotal Paid (PH & Crisis) 1.Xcel$22,630,342 2.CenterPoint$10,228,495 3.MERC$4,565,283 4.Minnesota Power$2,081,423 5.Federated Coops$1,877,777 6.Beltrami Electric Coop$1,738,565 7.Ferrellgas$1,573,585 22

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY13 Energy Vendor Payments FFY13 Energy Vendor Payments (continued) VendorTotal Paid (PH & Crisis) 8.Otter Tail Power$1,519,329 9.Northern Star Coop$1,106, East Central Energy$1,012, Lake Country Power$927, Bemidji Coop$879, Alliant Energy$875, Como Oil & LP Duluth$866, City of Duluth$655,763 23

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY13 Fuel Source Used by EAP HHs 24

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Chapter 3 – Energy Vendors Context: FFY14 Improvement Process  Joint Approach to Development w/SPs  Meeting with top energy vendors  Energy vendor SMEs  DOC state staff 25

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Chapter 3 – Consumption Voluntary Shutoffs  Reminder: Addition to Consumption Data Specifications  Added to both Chapter 3 and Chapter 6  Instructions on reporting consumption when it is known that a household voluntarily has their energy service disconnected  Service Providers need to ensure applicable energy vendors are aware of this change 26

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Chapter 3 - Crisis Many improvements made in the Crisis Chapter also reflected in the Energy Vendor Chapter  Page 7, Crisis Eligibility section: Notice of being put on a load limiter  Page 7, Amount of Crisis Benefit section: Rounding up Crisis payments to the nearest dollar & allowable credits  allowable credit of less than $1.00  allowable delivered fuel account credits of $10 27

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Chapter 3 – Crisis Chapter 3 – Crisis (continued)  Page 8, Crisis Information Requirements section: minor changes to information energy vendors may need to provide both pre-delivery and post-delivery  Page 9, Process to Reduce Ineligible Crisis Delivery section: changes clarify energy vendor’s actions needed  Page 10, Early Notification of Payment and Emergencies section: when possible, energy vendors should accept eHEAT “Payable” status for addressing household energy emergencies  Reminder: Obtaining post delivery information 28

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Chapter 3 - Additional Improvements  Page 11, Energy Vendor Internal Controls Responsibility section: Energy vendors are to ensure that crisis payments don’t create a credit…  over $1.00 on a connected fuel account  over $10.00 on a delivered fuel account  Page 13, Access to Records section: SP audit instructions moved to Appendix 3C, Monitoring Report 29

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EV/SP Agreement – Appendix 3A  In part II, #4 was deleted, “The Service Provider will ensure payments are made to the vendor within 5 business days of early notification of a payment”  In part III, #15 was edited to specify that “Payable” status should be accepted, when possible for addressing household emergencies  Chapter 3, Page 10 The Agreement Between Energy Vendor & Service Provider section: No payments without signed agreements 30

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Monitoring of Energy Vendors FFY14 Minor Improvements  Monitoring Report & Cover Letter (3C & 3B)  Sample size  Reviewing Crisis events  Better guidance on how to analyze  Coming post October 1  Vendor SME  Coordinated monitoring is still an aspiration 31

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 FFY14 Reminders  Payment exports – Name on account  Portals  Control Measures  Communication & Relationship Building  Maintaining current vendor lists in eHEAT  Pay-As-You-Go Programs 32

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Public Utilities Commission 33

Energy Assistance Program Fall Training August 20-21, 2013 Public Utilities Commission Brian Swanson 34

 Public Utilities Commission  Complaints & Communications  Key trends  Smart Meters  Pay as you go  Residential Consumer Protections 35

 Regulate  Local and in-state long distance telephone companies  Investor-owned electric and natural gas utilities  Permitting for power plants, pipelines, transmission lines  5 Commissioners  Appointed by the Governor  Serve staggered terms  FT employment  50 staff 36

 Services provided by the Consumer Affairs Office  Mediation between utility companies and their customers  Consumer Education  Telephone Discount Programs  Cold Weather Rule  Utility Resource  Public Comments 37

 Interagency Relationships  Attorney General  Department of Commerce  Federal Communications Commission  Governor  Legislators (State and Federal)  Public Utilities Commissions in other states  Social Service Organizations 38

 Complaints handled by the PUC  Billing Disputes/errors  Cold Weather Rule (October 15- April 15)  Deposits  Disconnection of Service  Extended Area Service (EAS)  Meter reading issues  Pipeline routing  Power plant siting  Rates  Service areas  Transmission line routing 39

 Complaints NOT handled by the PUC  Cellular or mobile phone service or VOIP  Cable TV  Internet  Water  Billing disputes between roommates or tenants and landlords  Damage to customer’s property by utility  Damage to utility’s equipment by customers  Easements and easement rights  Customer-owned telephone equipment  Disputes with municipal utilities or electric cooperatives 40

41

 What happens after we receive the complaint form?  Complaint is recorded into our tracking system  Complaint is assigned to a mediator for review  Mediator contacts customer if there are additional questions or missing information  Mediator s a copy of the complaint form and any additional questions that need to be answered to the utility  The utility must respond within 10 business day  Depending on the response, either contact the customer or ask utility additional questions 42

 By the numbers  About 5,500 calls handled last year ▪ 35% Electric ▪ 33% Telecom ▪ 16% Natural Gas ▪ 16% Miscellaneous (often non-regulated – water, cable, internet and sewer) 43

 Lifeline wireless providers approved in MN  Assurance Wireless  Budget Mobile  EnTouch Wireless  Life Wireless  Qlink Wireless  ReachOut Wireless  T-Mobile  TerraCom Wireless 44

 Lifeline eligibility based on program participation  Public assistance programs eligible for telephone discount participation  Medicaid/Medical Assistance  Supplemental Nutrition Assistance Program (SNAP)/ Food Stamps )  Minnesota Family Investment Program (MFIP)/ Temporary Assistance for Needy Families (TANF)  Supplemental Security Income (SSI)  Federal Housing Assistance or Section 8 Assistance  Low Income Home Energy Assistance Program (LIHEAP)  National School Lunch Program's free lunch program 45

 Lifeline additional qualifications for persons living on a reservation  Bureau of Indian Affairs General Assistance  Tribally administered Temporary Assistance for Needy Families  Head Start (only those meeting its income qualifying standard)  National School Lunch Program's free lunch program 46

 Lifeline income guidelines Federal Poverty Guidelines Household Size 135% ▪ 1 $15,512 ▪ 2 $20,939 ▪ 3 $26,366 ▪ 4 $31,793 ▪ 5 $37,220 ▪ 6 $42,647 47

 Rate Cases  Xcel Energy electric rate case ▪ Docket  CenterPoint Energy gas rate case ▪ Docket  MN Energy Resources ▪ Filing in September 2013  Customer charge increase 48

 More utilities are starting to use smart meters  Reliability ▪ Quicker resolution to outages ▪ Proactively resolves blink outages ▪ Easier access to meter reading  Information ▪ Able to review usage monthly, daily and hourly ▪ Review data by paper, website and smart phone app 49

 Pre-pay for electric service  Only a couple Cooperatives are currently using this  Like putting gas in your car to drive  Minimum deposit to start –($25 or $50), NO large deposit  Some have in home displays that show where you are at for the month  Same rate structure  Alert level set to notify customer when $15 is left on account 50

 Pre-pay for electric service  Can add money to account by IVR, on-line or speaking to a Rep.  If they fall behind, 50%, 30% or even down to 1% of payment to past due amount and the rest for current service.  Can go off of the program if the can’t afford to pre-pay 51

 MN Statute 216B.098  Budget Billing ( Municipal under 3000 customers are exempt)  Payment Agreements  Undercharges  Medically Necessary Equipment 52

 Medical equipment in use.  Requires electricity.  Necessary to sustain life.  Written certification from a medical doctor.  The customer must enter into a payment agreement.  Applies to all electric utilities.  Statute is silent on re-certification. 53

MN Statute 216B.0975 Disconnection during Extreme Heat Conditions  No disconnection if National Weather Service issues… Excessive heat watch Heat advisory Excessive heat warning  Applies to all electric utilities 54

 When something doesn’t seem right  Best scenario is to have the household call PUC directly so we can get all of the information  The Service Provider can also call if household is unable to  Provide as much specific information as possible  There may be others with the same issue 55

 Department of Commerce  Division of Energy Resources  Office of the Attorney General  Stay Warm Minnesota

Brian Swanson Consumer Mediator Minnesota Public Utilities Commission 121 Seventh Place East Suite 350 St Paul MN , option , option 1 Fax

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP - WAP 58

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP Terminology  EAP - Energy Assistance Program - (HHS)  ERR - EAP Energy Related Repair Component  EAPWX – EAP funds transferred to WAP and the services offered by WAP  WAP - Weatherization Assistance Program - (DOE)  EAP WAP – Referring to both EAP and WAP  Coordination – Common application, determination of income, related policy, etc. 59

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP  EAP and WAP in Relation to EAPWX Funds

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP EAP Funds Are Transferred to WAP (EAPWX) The Weatherization Assistance Program completes an EAPWX State Annual Plan  High level coordination  Includes use of funds  Signed by Marilou Cheple and John Harvanko 61

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP When & What EAP Funds Are Transferred to WAP?  After EAP receives all regular LIHEAP grant awards  EAPWX State Annual Plan is signed  Percentage of Regular LIHEAP funds 62

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP EAPWX Funds Transfer 5% of EAP funds transferred to EAPWX  FFY2013: $10,933,452*  FFY2012: $11,684,014*  FFY 2011: $ 7,262,047  FFY 2010: $ 7,226,376  FFY 2009: $ 7,226,376  FFY 2008: $ 3,874,401  FFY 2007: $ 3,873,447 Exceptions: *10% transferred in FFY2012 and FFY

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP What are EAPWX funds for? LIHEAP Statute:  “Provide low-cost residential weatherization and other cost-effective energy-related home repair” 64

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP EAPWX in Minnesota LIHEAP State Plan Includes:  % of EAP funds budgeted  Eligibility  Use of funds 65

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP EAP and WAP Coordination ERR Referrals to WAP  Heating system emergencies  Life-threatening  Homeowners & Renters  Crisis timelines -18/48 hour rules 66

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 EAP WAP Local EAP WAP Coordination Agreement  DOC EAP and WAP will jointly require a local EAP WAP Coordination Agreement  The local EAP WAP Coordination Agreement must include, but is not limited to:  Application coordination  Referrals EAP WAP  Communication  Signed by Coordinator(s) 67

FFY2014 EAP Annual Training August 20 & 21, 2013 FFY2014 EAP Annual Training August 20 & 21, 2013 Weatherization Assistance (WAP) 68

State Weatherization Field Monitor at Commerce Bachelors of Science in Residential Building Science and Technology Home Remodeler Construction and Project Manager

EAPWX Funding $10,933,452 DOE $4,015,528 MN Weatherization $2,000,000 Total $16,948,980

This EAPWX State Annual Plan applies to all EAPWX funds that have not been spent. All audits completed after July 26, 2013 must follow the rules in this plan. Audits completed prior to July 26, 2013 may use the previous guidance.

Spending Limits Average of $5,000 per household Additional $1,000 average for Health and Safety Energy Conservation Work At least one cost effective energy conservation measure must be completed with EAPWX Funds when any EAPWX Funds are spent on an audit event

Base loads EAP/WX funds will not be used for the following: CFL lights Refrigerators Gas stoves or ranges Installation of water pipe insulation on boilers or water heaters Water heater tank insulation Shower heads

Only mechanical systems will be addressed Tenants must directly pay for their own heating costs Everyone must be EAP eligible Vacant dwellings may not be Weatherized

If you are out of ERR money it is strongly encouraged that referrals are made to the Weatherization Program. Weatherization Program Managers can help clients by following the Weatherization Standalone Policy with repairs and replacements of heating plants.

It is important to develop a plan or procedure for referring clients to Weatherization in these emergency situations before the heating season starts. Plan for after hour emergencies as well. Feedback loop to ensure clients are serviced

Eligible Standalone work is the repair and replacement of heating plants and domestic water heaters. In emergency, no heat, or life threatening situations, Weatherization Service Providers must have in place a mechanical procurement process that ensures fair contractor competition while allowing for prompt services when a household is in imminent danger or is facing a no-heat or safety situation.

Calling the nearest mechanical contractor is not an acceptable method of procurement Once the EAPWX funds are transferred they must follow the Federal, State, and the Service Provider’s Procurement Policies.

Weatherization Service Providers must follow the same guidelines for response and resolution of emergencies as stated in the EAP Policy Manual. EAPWX funds may not be used to purchase fuel if a client is out of a delivered fuel.

Fuel Switching follows DOE guidelines. Fuel switching is allowed only with prior approval from the Division of Energy Resources Weatherization. This is a long process and it requires a significant amount of documentation.

Fuel Switching must have a minimum of 20% fuel cost savings over the life of the heating plant. Energy savings alone is not a strong enough reason for a fuel switch to be approved. Fuel switches are sometimes denied.

Contractors must supply an ACCA Manual J calculation when replacing a heating plant to ensure proper sizing and code compliance. Contractors must supply a copy of all permits including those for electrical work. Invoices must have a material and labor split or they will not be paid.

All Standalone Measures that cost more than $500 must pass a final inspection. Final inspections are a very thorough process that includes testing the mechanical equipment for proper installation and operation.

The tests are required at a final inspection can be found in the Weatherization Policy Manual. Testing includes Combustion Analysis Worst Case Draft test on the heating plant and DWH Combustion gas spillage test Heat Rise Test

We want to make sure the equipment is operating within the manufacturers specifications. We want to make sure that we don’t leave the home in a worse situation than when we found it.

If you want to learn more about the WAP Policy manual it can be found at the following link: Division of Energy Resources

If you have questions throughout the program year please contact your EAP monitor. EAP and WAP staff will work together at the state level to answer your questions.