NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.

Slides:



Advertisements
Similar presentations
Background studies Takashi Maruyama SLAC GDE Baseline Assessment Workshop SLAC, January 18-21, 2011.
Advertisements

EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
GUINEA-PIG: A tool for beam-beam effect study C. Rimbault, LAL Orsay Daresbury, April 2006.
NLC - The Next Linear Collider Project Interaction Region Issues Jeff Gronberg / LLNL Santa Cruz Linear Collider Retreat June This work was.
1 Vacuum Requirements in the Detector Region from Beam Gas and other Considerations Takashi Maruyama (SLAC) LCWA 2009, Albuquerque October 2, 2009.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Tom Markiewicz/SLAC Snowmass July 2001.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
NLC - The Next Linear Collider Project Beam Energy Measurement: SLC-style Energy Spectrometer Stan Hertzbach University of Massachusetts LCWS 2000, Fermilab.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project Detector Design Issues:  Interaction Region David Asner/LLNL Linear Collider Retreat, Santa Cruz, June 27-29,
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Background Studies Takashi Maruyama SLAC ALCPG 2004 Winter Workshop January 8, 2004.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Tom Markiewicz/SLAC Snowmass 2001, 05 July 2001 LCD Meeting, 25 September.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Background comparison between 20 mrad and 2 mr crossings Takashi Maruyama SLAC Machine-Detector Interface Workshop SLAC January 6-8, 2005.
Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.
IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly.
The Detector and Interaction Region for a Photon Collider at TESLA
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle HH-Zeuthen-LC-Meeting Zeuthen September.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle LCWS 2004 Paris April 19 th 2004.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
Beam-Beam Background and the Forward Region at a CLIC Detector André Sailer (CERN PH-LCD) LC Physics School, Ambleside 22st August, 2009.
Hongbo Zhu, Qinglei Xiu, Xinchou Lou (IHEP) On behalf of the CEPC study group ICFA Advanced Beam Dynamics Workshop: Higgs Factory (HF2014) 9-12 October.
Interaction Region Issues and Beam Delivery R&D Issues & IR Design Status R&D Plans T. Markiewicz Klaisner Review 4/15/1999.
NLC - The Next Linear Collider Project IR Geometries & Constraints on Forward Detectors Tom Markiewicz SLAC ALCPG SLAC 08 January 2004.
NLC - The Next Linear Collider Project Linear Collider IR Options Tom Markiewicz / SLAC LC Workshop 2002, U. Chicago 07 January 2002.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
NLC - The Next Linear Collider Project Machine-Detector Interface Tom Markiewicz LC R&D Opportunities, SLAC May 21, 2002.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Tom Markiewicz NLC - The Next Linear Collider Project.
16 February 2009CLIC Physics & Detectors Konrad Elsener 1... some issues regarding the forward region... (“picking up” from Lucie Linssen, 29 Sept 2008)
1 Simulation of Neutron Backgrounds in the ILC Extraction Line Beam Dump Siva Darbha Supervisors: Lewis Keller and Takashi Maruyama.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
MDI Simulations at SLAC Takashi Maruyama, Lew Keller, Thomas Markiewicz, Uli Wienands, SLAC MAP Collaboration Meeting, FNAL June 21, 2013.
Photon & e+e- Hits in Muon Higgs Factory T. Markiewicz T. Maruyama SLAC MAP Collaboration Meeting. Fermilab 29 May 2014.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
FCC-ee Interaction Region design
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan International Review Committee November 12-13, 2007
Final Focus Synchrotron Radiation
Neutron and Photon Backscattering from the ILC Beam Dump
Beam Background and the SVT Protection Collimator
The 2mrad horizontal crossing angle IR layout for the ILC
Tony Hill Lawrence Livermore National Laboratory
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
Higgs Factory Backgrounds
Simulation of Neutron Backgrounds in the ILC Extraction Line Beam Dump
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999

Tom Markiewicz NLC - The Next Linear Collider Project Background Calculations Summary Overall status presented by Takashi Maruyama/SLAC at LCWS 4/99 at Sitges, Spain New Developments by Jeff Gronberg/LLNL New Be ring mask effectively eliminates backscattered hits in VXD-L1 Allows 1.2 cm VXD Layer 1 for fields down to 3 Tesla Study potential problem with scattering angle approx. used by FLUKA Synchrotron Radiation: Stan Hertzbach updates analysis from 1996: OK for 8  x x 40  y Takashi Maruyama adds 200m of incoming beamline to GEANT Study SR, off-energy beam striking apertures, beam-gas scattering SR from disrupted beam in extraction line not a problem Muon Background: Lew Keller/SLAC 9m long tunnel filling spoilers are the best insurance against muons. Current plan is to build ONLY ONE cavern downstream of last collimator, but to leave it empty until needed.

Tom Markiewicz NLC - The Next Linear Collider Project Background Simulations Machine Parameters: 1 TeV c.o.m. NLC “B” 1.0E10 e-/bunch; 95 b/train; 120 Hz Generators: “Guinea-Pig” Program Simulators: GEANT3: e+/e- & photons FLUKA98: neutrons Geometry: LCD Small Detector w/ real field Important that layout is as realistic as possible Complete Extraction Line and Dump  200 m of INCOMING beam line

Tom Markiewicz NLC - The Next Linear Collider Project Radiative Bhabhas 125K per =370 GeV IP Backgrounds e+,e- pairs from beams.  interactions 44K per =10.5 GeV (0.85 W)

Tom Markiewicz NLC - The Next Linear Collider Project Maximum Radius of Pair e-,e+ vs. z ( 1 TeV, Constant B z, 20 mrad  c ) Small Detector w/ 6 Tesla Solenoid 1.2 cm

Tom Markiewicz NLC - The Next Linear Collider Project IR Layout Details X (cm) Y(cm) Q1 Extraction Beampipe Maximum Radius of Pair Background x-y Distribution of Pair e-,e+ at z = 2 m 1 TeV, 6 Tesla Field Map Pairs deposit ~ ½ Watt DC  10 9 rad/year Plan View - 6 Tesla Detector Low Z absorber Pair Energy Monitor Collar

Tom Markiewicz NLC - The Next Linear Collider Project Detector Backgrounds (LCD Small Detector) Hit Density a very rapid function of r = 2 cm, goal is met Work in Progress: Addition of low Z absorbers in TESLA & JLC designs have eliminated backscatters

Tom Markiewicz NLC - The Next Linear Collider Project Be Ring Mask placed along field lines that reach VXD-L1 Reduces backscattered component of VXD-L1 hits to 16% of total Direct hits now dominate VXD-L1 whereas before were only 11% of total VXD-L1 Hit Density = 2.0 hits/mm 2 /train Under study: why did # VXD hits/primary e- increase to make density go from expected 1.2 to observed 2.0?

Tom Markiewicz NLC - The Next Linear Collider Project 1.2 cm VXD L1 in BOTH L & S Detectors Black:Layer 1 Turquoise:Layer 2 Green:Layer 3 Blue:Layer 4 Red:Layer 5 B (Tesla) Hits / bunch ~3.5 x more Layer 1hits at 3 Tesla With few backscattered hits, LCD group currently feels aggressive 1.2 cm VXD is also possible for Large Detector (3-4 T) detector 2.0 hits/mm 2 /train 84% from multiple hits by primary pair electrons

Tom Markiewicz NLC - The Next Linear Collider Project Neutron Backgrounds e+/e- pairs and radiative Bhabhas hitting beam-pipe and magnets in the extraction line. Disrupted beam lost in the extraction line % beam loss in recent redesign Disrupted beam and beamstrahlung photons in the dump Neutron hit density in VXD Beam-Beam pairs1.7 x 10 9 hits/cm 2 /yr Radiative Bhabhas0.02 x 10 9 hits/cm 2 /yr Beam loss in extraction line0.01 x 10 9 hits/cm 2 /year Backshine from dump0.25 x 10 9 hits/cm 2 /yr TOTAL2.0 x 10 9 hits/cm 2 /yr

Tom Markiewicz NLC - The Next Linear Collider Project Neutrons from the Beam Dump

Tom Markiewicz NLC - The Next Linear Collider Project Possible Problem with FLUKA may UNDERESTIMATE Beam Dump Contribution to Neutron Background More detailed study of source of VXD neutron hits indicated that NOTHING is coming down the beampipe Leads to study of scattering angles in FLUKA Learn of polar scattering angle approximation: OK for transport through bulk material (shielding) Not so good for small angle scattering down beam pipe Severity of problem unknown at this time Investigation under way with COG (a LLNL neutron transport code) May also try MARS code

Tom Markiewicz NLC - The Next Linear Collider Project Quadrupole Synchrotron Radiation Update (Stan Hertzbach) Apertures: Q1: 5.9 mm and 5.4 mm radius SR “stay-clear” considered (6.4 mm spec. in DIMAD) Extraction line: 10 mm radius beam pipe for z < 6 m, then 9 mm in quad magnets Criteria: No SR hits inner bore of Q1 or Be Ring Mask protecting VXD-L1 This is stricter than used in the past, where hits were allowed and we studied rescattering. It may be too strict, but # photons rises quickly! Assumptions: Flat beam halo assumed to fill collimation aperture Consider 8  x x 40  y and greater collimation depth Geometry: Horizontal beamline with detector rotated 10 mrad

Tom Markiewicz NLC - The Next Linear Collider Project QSR Masking Conclusions SR masks at 11m (y) and 12m (x) satisfy goal of NO Q1 / NO BeRM hits for 8  x x 40  y collimation and current Q1 aperture Increasing y collimation depth not possible Additional masks at 4m (y) and 8m (x) required to maintain goals if want to increase x collimation depth to 12  x Q1 SR stay-clear needs to be smaller (magnet engineering) Current feeling is that this is too close to the detector (50 mW of SR with an average photon energy of 49 GeV) Try to design Q1 so that aperture is increased for last 25% of its length closest to IP Maintain full diameter aperture of extraction beam pipe: Implications for Q1 support structure near L*=2m

Tom Markiewicz NLC - The Next Linear Collider Project Maruyama’s Conclusions on QSR from GEANT Extraction line generates 63.1  /e of = 31.1 MeV 36 kW per beam 160 W per beam strikes extraction line, mostly 90 < z < 130 m Incoming beam analysis in progress Misunderstanding in feeding beam parameters to GEANT. Need to check against Hertzbach’s work and include masks at 11 and 12m. Ignoring this: QSR generates 17.2  /e of = 28.5 MeV 8.9 kW per beam 6 W per beam strikes extraction line, mostly 6 < z < 9 m