A Game Changing Approach to Venus In‐Situ Science Missions Using Adaptive Deployable Entry and Placement Technology (ADEPT) Ethiraj Venkatapathy 1, Lori.

Slides:



Advertisements
Similar presentations
International Planetary Probe Workshop 10
Advertisements

DOC-TAS-EN-002 ExoMars-2018 DM Entry Decent Landing LSSWS# December 2014 Turin.
Numerical Optimal Control Methods Applied to Mars EDL Max Fagin Rapid Design of Systems Lab Purdue University 17 th Annual Mars Society Convention League.
Advances in Thermal Protection System Instrumentation for Atmospheric Entry Missions Johnny Fu Sierra Lobo, Inc. NASA Ames Research Center Presentation.
C ONCEPTUAL M ODELING AND A NALYSIS OF D RAG -A UGMENTED S UPERSONIC R ETROPROPULSION FOR A PPLICATION IN M ARS E NTRY, D ESCENT, AND L ANDING V EHICLES.
VI. Descent and Terminal Guidance for Pinpoint Landing and Hazard Avoidance Session Chair: Dr. Sam W. Thurman.
CURIOSITY: Big Mars Rover for Big Mars Science! Artist’s Concept. NASA/JPL-Caltech.
Copyright 2011 | Company Proprietary Parachute Development for Venus Missions Christopher Kelley – Airborne Systems Robert Sinclair – Airborne Systems.
Mission Mars ENTRY, DESCENTAND LANDING. What are we going to Talk about? ?
Surface and Atmosphere Geochemical Explorer (SAGE) Anita Sengupta, Jet Propulsion Laboratory, California Institute of Technology Rob Maddock, Juan Cruz,
Entry Systems and Technology Division Dinesh Prabhu, # Gary Allen, # Helen Hwang, $ Mina NASA Ames Research Center, Moffett Field, CA Thomas.
Mars EDL CubeSat Mission Jekan Thanga 1, Jim Bell 1 Space and Terrestrial Robotic Exploration Laboratory School of Earth and Space Exploration (SESE) Arizona.
Temperature ( C) Pressure ( bars) Jupiter Probes Venus Surface Exploration CNSR Europa Surface and Subsurface Titan.
June 28, Background: TPS / Entry Technology  Should we worry about TPS/Entry Technology?  NASA entry probes have successfully survived entry environments.
AAE450 Senior Spacecraft Design Atul Kumar Presentation Week 3: February 1 st, 2007 Aerodynamics Team Re-Entry vehicle analysis - Lifting body 1.
Miniaturization of Planetary Atmospheric Probes Tony Colaprete NASA Ames.
Flexible Thermal Protection System Design and Margin Policy
International Planetary Probe Workshop 10
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Testing of Advanced Conformal Ablative TPS
Why Venus? The 2013 Planetary Science Decadal Survey recommends the Venus In Situ Explorer mission as highest-priority within New Frontiers class. Venus.
IPPW- 9 Royal Observatory of Belgium 20 June Von Karman Institute for Fluid Dynamics Obtaining atmospheric profiles during Mars entry Bart Van Hove.
Pioneer Venus & Galileo Probe Development: Comparison/Assessment John Givens.
Jet Propulsion Laboratory California Institute of Technology National Aeronautics and Space Administration National Aeronautics and Space Administration.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
MER PDS PDR - Document No. EA Mars Exploration Rover 3 April 2001ACW - 1 Welcome MER Parachute DeceleratorSystem Preliminary Design Review.
A Simple Entry, Descent, and Floating System for Planetary Ballooning Daisuke Akita Tokyo Institute of Technology.
Titan Mariner Spacecraft Study Titan Team! IPPW-5 June 24, 2007.
K. Mease 10/11/06 1 Mechanical & Aerospace Engineering Henry Samueli School of Engineering University of California, Irvine K. D. Mease Professor SAE Aerospace.
High Altitude Scientific Ballooning (Near Space Engineering)
The Solar System. Overview of the Solar System Basics Source: Nine Planets - A Multimedia Tour of the Solar System * By Bill Arnett.
EXTROVERTSpace Propulsion 02 1 Thrust, Rocket Equation, Specific Impulse, Mass Ratio.
Ryan Mayes Duarte Ho Jason Laing Bryan Giglio. Requirements  Overall: Launch 10,000 mt of cargo (including crew vehicle) per year Work with a $5M fixed.
Filling Mars Human Exploration Strategic Knowledge Gaps with Next Generation Meteorological Instrumentation. S. Rafkin, Southwest Research Institute
Team effort across multiple centers Not a finished product
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
Opportunity Taken: The Value of Diverse Career Experience Dr. Robert D. Braun Alvin Seiff Memorial Lecture June 18, th International Planetary Probe.
Back to TITAN 24/06/2008 All rights reserved, 2007, Thales Alenia Space Template reference : K-EN TITAN probes following CASSINI - HUYGENS Denis.
→ PHOEBUS a hypervelocity entry demonstrator 9 th International Planeraty Probe Workshop June 2012 Toulouse, France L. Ferracina AOES/ESA-ESTEC L.
FP7/SPACE: Activity Strengthening of Space foundations / Research to support space science and exploration - SPA The research leading.
MAVEN MARS ATMOSPHERE AND VOLATILE EVOLUTION.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
Minimalist Mars Mission Establishing a Human Toehold on the Red Planet Executive Summary DevelopSpace MinMars Team.
HIAD Mission Infusion: Technology Development & Potential Utilization
TRS-1 Payload Options Thomas R. Spilker, Jet Propulsion Laboratory / CIT 2011 June 8 8th International Planetary Probes Workshop Portsmouth, Virginia,
1 Aerothermal Ground Testing of Flexible Thermal Protection Systems for Hypersonic Inflatable Aerodynamic Decelerators Walter E. Bruce III, Nathaniel J.
Multi-Mission Earth Entry Vehicle: Aerodynamic and Aerothermal Analysis of Trajectory Environments Kerry Trumble, NASA Ames Research Center Artem Dyakonov,
Partners for 21st Century Learning Focusing Federal Investments in Science, Technology, Engineering and Math.
Human Exploration of Mars Design Reference Architecture 5
P07108: METEOR Instrumentation Recovery System. Team Bash Nanayakkara – Project Manager (ISE) Scott Defisher – Fuselage Design (ME) Mike Kochanski – Software.
Team Member Travis Noffke Decelerator System
A&AE 450 – Senior Design Jeremy Davis Group A – Aerodynamics Preliminary Design Analysis January 23, 2001.
Miniature Probes for Planetary Atmospheric Exploration: Where Less is More Anthony Colaprete ASA ARC.
Review of Past and Proposed Mars EDL Systems. Past and Proposed Mars EDL Systems MinMars Mars entry body design is derived from JPL Austere Mars entry.
Spacecraft Dimensions 1.06 meters (3.5 feet) tall by 3.6 meters (12 feet) wide. Spacecraft Weight Total: 576 kg (1,270 pounds) Lander: 290 kg (639 pounds)
Enabling Capabilities A Robotic Field Geologist Access to a site mapped from orbit Long life, mobility, capability to explore a local region Remote sensing.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Atmospheric Entry Vehicles: A Review
Pawel Swica1 Entry/Integration Hours Worked: Team Member Pawel Swica.
Short Course: Destination Venus: Science, Technology and Mission Architectures James Cutts, JPL International Planetary Probe Workshop 2016 June 11-12,
Pre-decisional – for Planning and Discussion Purposes Only 1 Technology Planning for Future Mars Missions Samad Hayati Manager, Mars Technology Program.
CubeSat Re-Entry Experimental System Testbed C.R.E.S.T. STK 11 This software is an orbital simulator that allows the user to examine the flight path of.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
Cable-Controlled Aeroshell Deceleration System Sashank Gummella, Sophomore, Aerospace Engineering Steven Kosvick, Sophomore, Aerospace Engineering Austin.
DAVINCI: Deep Atmosphere Venus Investigation of Noble Gas, Chemistry, and Imaging One out five NASA’s Discovery-class missions for Phase A studies. A 63.
Session Chair: Dr. Sam W. Thurman
Advance Exploration Programs, Thales Alenia Space in Italy
Atmospheric Re-Entry Goal: To re-enter the CubeSat into the atmosphere and survive re-entry and hit the ground without any deceleration from parachute,
Parachutes Changed Supersonic portion of descent
Presentation transcript:

A Game Changing Approach to Venus In‐Situ Science Missions Using Adaptive Deployable Entry and Placement Technology (ADEPT) Ethiraj Venkatapathy 1, Lori Glaze 2 Dinesh Prabhu 3, Brandon Smith 1, Bryan Yount 1, Alberto Makino 1, Ken Hamm 1, Paul Wercinski 1, Peter Gage 4 James Garvin 2, Charles Baker 2 and Gregg Marr 2 International Planetary Probe Workshop, June 19, 2012 Toulouse, France 1 NASA Ames Research Center, 2 NASA Goddard Space Flight Center, 3 ERC inc., 4 Neerim Corp.

ADEPT What is this talk about? Venus, one of the important planetary destination for scientific exploration has presented many challenges – The combination of extreme entry environment coupled with extreme surface conditions have made proposal efforts in the last two decades to be non- competitive. We present an approach where entry environment is made benign and this allows for greater flexibility and lower risk in mission design – greater mass, greater planetary reach, – lower cost as a result of much reduced requirements for both instrumentation as well as EDL system development and certification Outline: Background Venus Mission – Conventional Design and Science Instrumentation Selection to meet NRC Decadal Survey Science Recommendations ADEPT – Mechanically Deployable Aeroshell Integrated Approach and comparison with classical design Concluding Remarks

ADEPT History: Venus Probes, Landers and Balloon Missions Past missions: β > 100 kg/m 2 ; |γ entry | > 18 deg. N max > 130 g’s and q max > 3 kW/cm 2 Mission β ( kg/m 2 ) γ ( deg.) V entry i (km/s) Dia. (m) n max ii (g's) q max ii,iii (kW/cm 2 ) Venera 4 (1967) Venera 5 (1969) to Venera 6 (1969) to Venera 7 (1970) to Venera 8 (1972) Venera 9 (1975) Venera 10 (1975) Pioneer-Venus-North (1978) Pioneer-Venus-Night (1978) Pioneer-Venus-Day (1978) Pioneer-Venus-Large (1978) Venera 11 (1978) to Venera 12 (1978) to Venera 13 (1981) to Venera 14 (1981) to Vega 1 (1984) Vega 2 (1984) Ballistic Coefficient: β = m/C D A reference γ = entry flight path angle n = sensed acceleration q = heat rate A ref i Entry velocities have been defined for a 200 km altitude ii Simulations themselves were based on engineering estimates iii Total of engineering estimates for cold-wall convective and radiative heat fluxes Ref: Dutta, S., Smith, B., Prabhu, D., and Venkatapathy, E., "Mission Sizing and Trade Studies for Low Ballistic Coefficient Entry Systems to Venus," IEEEAC 1343, 2012 IEEE Aerospace Conference, Big Sky, MT, March 2012.

ADEPT Venus Science Objectives for NASA New Frontiers Program (<$1B, PI-led missions) 2011 Planetary Decadal Objectives for Venus: – Understand the physics and chemistry of Venus’ atmosphere, especially the abundances of its trace gases, sulfur, light stable isotopes, and noble gas isotopes; – Constrain the coupling of thermochemical, photochemical, and dynamical processes in Venus’ atmosphere and between the surface and atmosphere to understand radiative balance, climate, dynamics, and chemical cycles; – Understand the physics and chemistry of Venus’ crust; – Understand the properties of Venus’ atmosphere down to the surface and improve our understanding of Venus’ zonal cloud-level winds; – Understand the weathering environment of the crust of Venus in the context of the dynamics of the atmosphere and the composition and texture of its surface materials; and – Look for planetary scale evidence of past hydrological cycles, oceans, and life and for constraints on the evolution of the atmosphere of Venus 4

ADEPT Example VISE-like Surface Mission: Venus Intrepid Tessera Lander (VITaL) 1 hour descent science – Evolution of the atmosphere – Interaction of surface and atmosphere – Atmospheric dynamics 2 hours of surface and near-surface science – Physics and chemistry of the crust 5

ADEPT VITaL Strawman Science Instrument Complement 6 Entry flight System Camera/Raman/LIBS Fields of ViewStable Landing Optimistic with conventional aeroshell: steep entry angle = high g-loads

ADEPT Venus Surface Mission Challenges Landers can be high mass, – Example: VITaL concept is designed to safely land in rough terrain Coupled with high mass entry system: Limits mass available for science payload and surface survival – VITaL science payload mass is only 2% of probe mass! In order to get 2% mass to surface location to perform Science of interest requires 98% of the mass between EDL systems and pressure vessel that allows for science instrumentation survival.

ADEPT Venus Surface Mission Challenges Determination of surface chemistry requires either: – Direct sample collection/ingestion – “Remote” observation using state of the art sensitive laser system (similar to the ChemCam on MSL) MSL instruments qualified for 25 – 30 g entry loads VITaL has predicted entry loads of 200 g (required by steep atmospheric entry). Reduction of entry g-load enables – Less development for state-of- the-art instruments – Less mass for the EDL system

9 ADEPT Carbon phenolic TPS places limits on Venus in-situ science due to high entry g-loads 9  = 208 kg/m 2 (45º sphere-cone, 2100 kg entry mass) V entry = km/s Trajectories Terminated at Mach 0.8 Traditional Venus Entry: Rigid 45º sphere-cone, Steep entry (-23.4º) Peak g-load ~200 g’s Peak Heat Rate (Total) ~4000 W/cm 2 Peak Stagnation Pessure ~10 atm Total Heat Load ~16,000 J/cm 2 Payload Mass Fraction ~0.5 Traditional Venus Entry: Rigid 45º sphere-cone, Steep entry (-23.4º) Peak g-load ~200 g’s Peak Heat Rate (Total) ~4000 W/cm 2 Peak Stagnation Pessure ~10 atm Total Heat Load ~16,000 J/cm 2 Payload Mass Fraction ~0.5 What happens if we enter at a shallow flight path angle near skip-out (-8.5º) with the same architecture? Peak g-load ~20-30 g’s Peak Heat Rate (Total) ~800 W/cm2 Peak Stagnation Pressure ~1 atm Total Heat Load ~28,000 J/cm2 Payload Mass Fraction ~0.2 What happens if we enter at a shallow flight path angle near skip-out (-8.5º) with the same architecture? Peak g-load ~20-30 g’s Peak Heat Rate (Total) ~800 W/cm2 Peak Stagnation Pressure ~1 atm Total Heat Load ~28,000 J/cm2 Payload Mass Fraction ~0.2 Decreasing G-load Improved science capability Reduced heat shield carrier structure mass Decreasing G-load Improved science capability Reduced heat shield carrier structure mass Increasing Heat Load Increased carbon phenolic thickness Increasing Heat Load Increased carbon phenolic thickness Increasing TPS Mass Fraction! Decreasing Payload Mass Fraction! Increasing TPS Mass Fraction! Decreasing Payload Mass Fraction! Net Effect:

10 ADEPT An Alternate EDL Architecture Mechanically Deployable Aeroshell

ADEPT Deployable (Low-  ), Shallow-  Sweet Spot May 15, Low-  entry, results in high altitude deceleration where the resulting entry aerothermal environment is benign –Well within the capability of carbon cloth Furthermore, the low-  architecture allows entry with a very shallow flight path angle, dramatically reducing entry G- load ADEPT key benefits: 1.No need for carbon phenolic 2.Benign entry G-load Simplifies qualification of scientific instruments Reduced structural mass of payload Opens doors for improved science return using more delicate instruments Peak deceleration (n) Peak heat flux (q) Total heat load (Q) Direction of increasing pressure

ADEPT ADEPT Approach to VISE Mission: Unwrap Rigid Aeroshell and Adapt the VITaL Payload to ADEPT ADEPT-VITaL Approach – What are the benefits, beyond the reduced G’load? Use of rigid aeroshell requires highly coupled design! Can we adapt the payload, without any modification, to the ADEPT concept? – Are there challenges? ConOps? VITaL Lander and Science PayloadADEPT-VITaL Integrated EDL System

ADEPT 4/4/ ADEPT-VITaL Mission Feasibility: Analysis, Trades and Design Decisions Mission design and analysis coupled with trades to establish viability of ADEPT Concept Goal is to understand the benefits and penalties in order to compare and contrast ADEPT- VITaL (Deployable) with VITaL (Rigid Aeroshell) Mission Feasibility Entry System Design Entry Design Environment Payload Deployment Mission Design Launch Vehicle Fairing Configuration Launch Window Cruise Stage Interface Requirements ADEPT Deployment and Release CONOPS Geometry Payload Integ. Packaging Structures Mechanisms Materials CG MEL EDL Trajectory Flight Mechanics Aero-stability Loads: Aero Aerothermal Aeroelastic Thermostructural Subsonic Separation Parachute Pyrotechnics Near-Field Re-contact Far-Field Re-contact Landing Site Targeting and Uncertainty

ADEPT Key System-Level Trades (1 of 2) ADEPT-Venus Geometry (Cone Angle and Diameter) for  = 44 kg/m 2 –System analysis showed this case as an approximate point of diminishing returns for the low-  ADEPT architecture: structural mass begins to grow faster –Stays within the constraints of expected carbon cloth capability for shallow entry flight path angle –70º cone angle / 6-m diameter ADEPT-VITaL baseline is result of trade between ADEPT mass, aerothermal loading, and stability considerations May 15, m diameter 70° cone-angle Sharper cone angle Larger diameter 8 m diameter 45° cone-angle Decreased pressure load on flank Increased turbulent heating on flank Decreased radiative heating on flank Increasing structural mass Increasing static margin  ~44 kg/m 2

ADEPT Aft-Separation Concept Details Pilot Chute Mortar Ø.20m X 0.40m (0.012 m 3 ) as shown Firing Vector through Center of Mass Main Parachute 0.14 m 3 Stowed ~140 kg/m 3 Packed Density Probe Backshell Contains main parachute Protects science instruments from W/cm 2 base heating VITaL-ADEPT Sep Joint 120-deg Separation Guide Rail 120-deg May 15, 2012ADEPT/CA250/NAS A Distribution Only 15

ADEPT Entry Interface 29 September 2024 V = 10.8 km/s  = -8.25º Ballistic trajectory Peak Total Heating Entry sec q total = 203 W/cm 2 P stag = 0.16 atm 19.2 G Targeting maneuver Deploy ADEPT Spin up Release ADEPT for EDL Cruise stage divert +1 day Launch Atlas V May 2023 Peak Deceleration Entry + 110s q total 122 W/cm 2 P stag = 0.24 atm 29.8 G Mach 2 16 Month Trajectory Alpha Region Landing Uncertainty Mach 0.8: Separation Event Begins Mortar-deployed pilot parachute Aft cover release Pilot-deployed main parachute VITaL separation from ADEPT Cut main parachute / VITaL release ADEPT-VITaL Mission Quick-Look

ADEPT Peak g VITaL ≈ 200, ADEPT-VITaL ≈30 Peak Pressure VITaL ≈ 8 bar, ADEPT-VITaL < 0.5 bar Peak Heat Flux VITaL ≈ 3.3 kW/cm 2, ADEPT-VITaL ≈ 0.3 kW/cm 2 Heat Load VITaL ≈ 13 kJ/ ADEPT-VITaL ≈ 7 kJ/cm 2 VITaL and ADEPT-VITaL Entry Environments ADEPT-VITaL Entry Environment is very Benign and well within Ground Test Capabilities. VITaL Entry Environment is extreme and is a challenge for certification

ADEPT ADEPT-VITaL Master Equipment List and Comparison with VITaL May 15,

ADEPT ADEPT-VITaL (Deployable) vs VITaL (Rigid Aeroshell) Launch MEV MEL Comparison May 15, Item ADEPT-VITaL Margined (kg) VITaL Baseline Margined (kg) Probe2,1002,745 Spacecraft970*1100 Satellite Dry Mass (Probe + Spacecraft) 3,0703,845 Propellant Mass Satellite Wet Mass 3,3534,214 Atlas V 551 Throw Mass Available 5,140 kg OPTION 1: Ovda Regio 2021 Landing Site Item ADEPT-VITaL Margined (kg) VITaL Baseline Margined (kg) Probe2,1002,745 Spacecraft970*1100 Satellite Dry Mass (Probe + Spacecraft) 3,0703,845 Propellant Mass 1,117**1,399 Satellite Wet Mass 4,1925,244 Atlas V 551 Throw Mass Available 5,140 kg OPTION 2: Alpha Regio 2023 Landing Site **Higher propellant mass than VITaL baseline because a new landing site was chosen that requires a deep space maneuver ADEPT architecture can lower the Launch Mass by 25%, or New Landing Site feasible only with ADEPT Architecture *Spacecraft Mass has 22% contingency versus VITaL baseline of 30%

ADEPT Concluding Remarks (missing testing decreases and lower mass) ADEPT, a Low Ballistic Coefficient, Mechanically Deployable Entry System Architecture is a Game Changer: – Dramatically decreases the entry environment due to high altitude deceleration (200 gs to 30 gs) Enables use of delicate and sensitive instrumentation Use of flight qualified instrumentation for lower G’load at Mars and elsewhere Entry mass and the launch mass are considerably reduced – Mission Risk and Cost, once the technology is matured and demonstrated, will be reduced considerably New Frontier and Discovery Class Missions to Venus become highly Competitive with Missions to Other Destinations recommended by Decadal Survey OCT’s investment in ADEPT, mechanically deployable aeroshell technology has broad payoff including Venus Continued Technology Maturation and Flight Test of ADEPT concept by 2015/2016 will – Enable Venus Missions to be a top contender for the next round of New Frontier AO.