1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.

Slides:



Advertisements
Similar presentations
Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
Advertisements

Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Just-in-Time and Lean Systems
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-In-Time and Lean Systems
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
Just-in-Time and Lean Systems
CSUN - Prof. David Shternberg
Beni Asllani University of Tennessee at Chattanooga
MSE507 Lean Manufacturing
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
CHAPTER 14 Just-In-Time Systems.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Value Stream Mapping.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Principles and Practices of Lean Manufacturing
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
How to Effectively Implement Set-up Reduction in Any Organization.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Basics Dewey Warden.
LEAN system.
JIT and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems
Visual Management – an Overview. What is Visual Management? Visual Management is a set of techniques for creating a workplace embracing visual communication.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 11 Just-In-Time and Lean Production.
Business Improvement Techniques. What’s it all about then?
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Review of Lean Topics Dewey Warden.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Operations Management JIT & Lean Systems
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
Lean Manufacturing Basic Overview XYZ Company.
Introduction to Lean Emily Varnado.
Introduction to Materials Management
Just-In-Time and Lean Production
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively have good time-management skills are committed to continuous learning and improvement. Slide 1: MCMT220A Apply quick changeover procedures

2 Employability skills (b) Employability skills can: help you gain employment make you a productive and valuable worker increase your chances of promotion. Slide 2: MCMT220A Apply quick changeover procedures

3 Employability skills (c) Employability skills developed in MSACMT220A Apply quick changeover procedures: Communication Teamwork Problem-solving Self-management Planning & organising Technology Lifelong learning Initiative & enterprise Slide 3: MCMT220A Apply quick changeover procedures

4 Competitive (lean) manufacturing To be competitive companies must: keep customers satisfied increase efficiency reduce costs reduce waste respond quickly continuously improve have enthusiastic and skilled staff. Slide 4: MCMT220A Apply quick changeover procedures

5 Seven types of waste in manufacturing 1.Overproduction 2.Defects 3.Inventory 4.Motion 5.Processing 6.Transportation 7.Waiting Slide 5: MCMT220A Apply quick changeover procedures

6 Lean manufacturing tools (Kaizens) 5S Pull systems (kanban) Value stream mapping Just-in-time production Total productive maintenance Slide 6: MCMT220A Apply quick changeover procedures

7 Lean manufacturing tools (Kaizens) cont … Takt time Heijunka Jidoka Visual process control Error-proofing (poka-yoke) Waste (muda) elimination Cellular/flow production Set-up/changeover reduction Slide 7: MCMT220A Apply quick changeover procedures

8 Quick changeover The time required to change over a machine or process from one item or operation to the next item or operation. Slide 8: MCMT220A Apply quick changeover procedures

9 Understand quick changeover Understand the benefits of using quick changeover as a competitive manufacturing tool. Identify how quick changeover can reduce waste in your work area. Slide 9: MCMT220A Apply quick changeover procedures

10 Chapter 1 Understand the principles of quick changeover This chapter explains how to: 1.1 Reduce waste with quick changeover 1.2 Determine the benefits of quick changeover Slide 10: MCMT220A Apply quick changeover procedures

11 The seven wastes 1.Overproduction 2.Defects 3.Inventory 4.Motion 5.Processing 6.Transportation 7.Waiting Slide 11: MCMT220A Apply quick changeover procedures

12 Benefits of quick changeover Reduce batch sizes Increase available space Reduce inventory costs Allow product to flow from one process to the next Slide 12: MCMT220A Apply quick changeover procedures

13 Benefits of quick changeover cont … Permit uninterrupted (smoothed) production with no bottlenecks or delays Increase production flexibility Improve on-time delivery – quick changeover supports the ability to meet customer demands Increase changeover accuracy Slide 13: MCMT220A Apply quick changeover procedures

14 Benefits of quick changeover cont … Reduce defect rates Reduce start-up scrap/waste Improve equipment utilisation/yield Increase profitability without new capital equipment purchase Slide 14: MCMT220A Apply quick changeover procedures

15 Design a quick changeover You need to understand: the principles of quick changeover the design of a quick changeover procedure in order to be able to improve it. Slide 15: MCMT220A Apply quick changeover procedures

16 Chapter 2 Design a quick changeover This chapter explains how to: 2.1 Identify internal and external activities 2.2 Convert internal activities to external activities 2.3 Eliminate the need for adjustment 2.4 Remove the need to set up completely 2.5 Improve ergonomics and OHS Slide 16: MCMT220A Apply quick changeover procedures

17 Internal and external activities Internal set-up activities – can only be carried out when the machine or plant has stopped. External set-up activities – can be completed while the machine is operating. Slide 17: MCMT220A Apply quick changeover procedures

18 Design modifications Use dedicated equipment to ensure that the right equipment is always ready and waiting. Ergonomically designed mobile die carts get dies into position rapidly. Well-located and ergonomically designed tool boards improve access to necessary equipment. Press-mounted roller rails move the die into the pre-staging position. Slide 18: MCMT220A Apply quick changeover procedures

19 Design modifications cont … Quick-change die cassettes easily slide in and out of the platen. Quick-release clamps for die cassettes clamp the dies in place rapidly. Locating pins for aligning dies can remove the need to adjust the die. Standardising shut heights using a liner removes the need for press stroke adjustments. Slide 19: MCMT220A Apply quick changeover procedures

20 Ergonomics and OHS Standing is better than sitting Workstations are adjustable Work rhythm Don’t remain in one position for too long Ergonomic 5S is essential Slide 20: MCMT220A Apply quick changeover procedures

21 Implement quick changeover procedures Understand the steps involved. Understand importance of preparation, communication, teamwork. Be aware of any OHS hazards. Regularly update and improve OHS procedures. Slide 21: MCMT220A Apply quick changeover procedures

22 Chapter 3 Implement a quick changeover This chapter explains how to: 3.1 Prepare for quick changeover 3.2 Implement a quick changeover in your work area 3.3 Continuously improve procedures 3.4 Improve OHS Slide 22: MCMT220A Apply quick changeover procedures

23 Preparing for a quick changeover Know when changeover is required. Obtain all required tools, parts and materials. Communicate with everyone involved in the changeover. Slide 23: MCMT220A Apply quick changeover procedures

24 Factors for successful changeover Preparation Training Timing Teamwork communication Standardisation Right tools in the right place Slide 24: MCMT220A Apply quick changeover procedures

25 Convey information about changeovers by: production plans production kanbans (pull systems) noticeboards toolbox talks work authority. Slide 25: MCMT220A Apply quick changeover procedures

26 Materials required Standard operating procedures (SOP) Job safety analyses Work permits Pre-start checklist Authority to change Quality criteria Control charts Data collection tools Slide 26: MCMT220A Apply quick changeover procedures

27 Pre-start checklist for die changeover Before you begin the die changeover, check that you have:  informed all relevant persons  positioned the tool board  positioned the new die in the pre-staging area  prepared die and accessories by performing external set-ups  electrically and mechanically isolated the equipment  removed all hazards in the work area. Slide 27: MCMT220A Apply quick changeover procedures

28 Review changeover How did we perform? Where there any problems? Are we improving? What recommendations can we make? Identify, discuss and document improvements. Slide 28: MCMT220A Apply quick changeover procedures

29 PDCA cycle Plan ahead for changeTake action to improve the process Execute the plan, taking small steps in controlled circumstances Study the results Slide 29: MCMT220A Apply quick changeover procedures

30 Improve OHS in quick changeovers Undertake regular job safety analyses Update procedures Retrain Slide 30: MCMT220A Apply quick changeover procedures

31 Job safety analysis 1.Document the activity 2.Identify the hazards 3.Document the control measures 4.Identify who is responsible 5.Monitor and review Slide 31: MCMT220A Apply quick changeover procedures