Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring 2009-2010 Aggregate Production Planning (APP) Slide Set #8.

Slides:



Advertisements
Similar presentations
Aggregate Planning. Dealing with the Problem Complexity through Decomposition Aggregate Planning Master Production Scheduling Materials Requirement Planning.
Advertisements

BU Decision Models Integer_LP1 Integer Optimization Summer 2013.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
IES 371 Engineering Management Chapter 14: Aggregate Planning
IE 3265 Production & Operations Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Aggregate Planning in a Supply Chain
Aggregate Planning.
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
ISEN 315 Spring 2011 Dr. Gary Gaukler. Introduction to Aggregate Planning Goal: To plan gross work force levels and set firm-wide production plans, based.
Supply Chain Management (SCM) Aggregate Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
LESSON 8: AGGREGATE PLANNING
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
1 Chapter 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
Ardavan Asef-Vaziri Systems and Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
3-1 Chapter 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
©2005 McGraw-Hill/Irwin 3-1 Chapter 3. Aggregate Planning (Steven Nahmias)
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
Production and Operation Managements Professor JIANG Zhibin Department of Industrial Engineering & Management Department of Industrial Engineering & Management.
8-1 Aggregate Planning in the Supply Chain Supply Chain Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
CHAPTER 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
Sales and Operations Planning
Chapter 14 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Aggregate Planning FAISAL FARIS BIN RAHIM
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Sales and Operations Planning
Dr Sh Salleh bin Sh Ahmad
Aggregate Production Planning (APP)
Presentation transcript:

Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8

Murat Kaya, Sabancı Üniversitesi 2 APP Overview APP: A plan devised to determine companywide workforce and production levels –how many employees the firm should retain: hire/fire workers –quantity and mix of the products to be produced to meet demand for products, considering company strategy and the capacity constraints Considers “macro” production decisions

Murat Kaya, Sabancı Üniversitesi 3 Why APP? “APP is the top management’s handle on the business” –where critical trade-offs are resolved based on company strategy APP provides links from manufacturing to other functions –once APP is agreed on, the manufacturing’s duty is to “hit the schedule” Cost of not having an aggregate plan include –extra inventories –poor customer service –excess capacity –long lead times –panic operations –poor response to new opportunities

Murat Kaya, Sabancı Üniversitesi 4 Aggregation Managing groups of items rather than individual items –provides a big picture view –forecasts for aggregate units are more accurate Define the “aggregate unit of production” –should be commonly understood by the other functions APP is later disaggregated to individual items –results in the master production schedule (MPS) for each item

Murat Kaya, Sabancı Üniversitesi 5 Aggregate Units of Production: Example Model Number Worker-hours Price Percentage A %32 K %21 L %17 L %14 M %10 M %6 How do we define the aggregate unit to determine the workforce and production levels in the plant in this example? Aggregate unit: 1$ of output? NOT CONSISTENT Aggregate unit: A fictitious washing machine that requires.32* * * * * *5.8 = hours of labour time

Murat Kaya, Sabancı Üniversitesi 6 A Sample Aggregation Scheme (Hax-Meal) 1.Items final products to be delivered to the customer SKU (stock-keeping unit) ex: an individual washing machine model 2.Families group of items that share a common manufacturing setup cost ex: all washing machines 3.Types group of families with production quantities that are determined by a single aggregate production plan ex: large home appliances (washing machines, dishwashers etc.)

Murat Kaya, Sabancı Üniversitesi 7 Hierarchy of Production Planning Decisions Copyright © 2001 by The McGraw-Hill Companies, Inc

Murat Kaya, Sabancı Üniversitesi 8 Primary Issues in APP Trade-off between –reacting quickly to anticipated changes in demand –retaining a stable workforce and/or production level Bottlenecks –where capacity restrictions occur Planning horizon –end-of horizon effect –rolling schedule –periods in which decisions are frozen Treatment of demand –assume deterministic demand to focus on the big picture D 1, D 2, …, D T

Murat Kaya, Sabancı Üniversitesi 9 Relevant Costs Smoothing costs –cost of changing the workforce –some components may be difficult to measure Holding costs –due to capital tied up in inventory Shortage costs Regular time costs –cost of producing one unit during regular working hours Overtime costs –cost of production beyond regular working hours Subcontracting costs –cost of production at a supplier or by some other firm Idle time costs

Murat Kaya, Sabancı Üniversitesi 10 Example: DensePack From Nahmias

Murat Kaya, Sabancı Üniversitesi 11 Problem Setup Currently (end of December) 300 workers employed Ending inventory in December: 500 units The firm would like to have 600 units at the end of June No backlogging, no overtime Forecast demand: MonthJanFebMarAprMayJun Demand c H : cost of hiring one worker: $500 c F : cost of firing one worker: $1000 c I : cost of holding one unit of inventory for one month: $80 (incurred at the end of each period) K = : number of aggrg. units produced by one worker per day

Murat Kaya, Sabancı Üniversitesi 12 Cumulative Net Demand MonthJanFebMarAprMayJun Demand Cumulative shortages not permitted

Murat Kaya, Sabancı Üniversitesi 13 Three Approaches 1.Chase strategy (zero inventory plan) 2.Constant workforce plan 3.A mixed strategy

Murat Kaya, Sabancı Üniversitesi 14 1) Chase Strategy (Zero Inventory Plan) Produce what is needed each month Keep zero inventory –inventory level may not be exactly zero due to integer num. of workers Hire and fire workers as needed –assuming sufficient labor pool exists –may not be possible in all countries unions, contracts etc –may lead to low morale and quality –may be suitable when low-skilled labor is required farming

Murat Kaya, Sabancı Üniversitesi 15 1) Chase Strategy

Murat Kaya, Sabancı Üniversitesi 16 1) Chase Strategy Total cost of hiring, firing and holding is (755)(500) + (145)(1000) + (30)(80) + (600)(80) = $572,000

Murat Kaya, Sabancı Üniversitesi 17 2) Constant Workforce Plan In the constant workforce plan, the goal is to eliminate completely the need for hiring and firing Calculate the minimum workforce required for each month to make sure that shortages do not occur –we use cumulative inventory values because inventory can be carried over

Murat Kaya, Sabancı Üniversitesi 18 2) Constant Workforce Plan The total (over periods) of the ending inventory levels is =6562 Total cost of the plan: (6562)(80)+ (111)(500) =$580,460

Murat Kaya, Sabancı Üniversitesi 19 3) A Mixed Strategy Alternative Suppose we allow a single change in the workforce level –can we find a strategy that reduces inventory without permitting shortages? Other constraints can also be studied –for ex: limit on the production capacity of the plant: limit on slope

Murat Kaya, Sabancı Üniversitesi 20 Solution with Linear Programming

Murat Kaya, Sabancı Üniversitesi 21 Linear Programming Determine the values of “n” nonnegative decision variables in order to max/min a linear function of these variables subject to “m” linear constrains of these variables Can be solved efficiently using the Simplex algorithm

Murat Kaya, Sabancı Üniversitesi 22 Model Parameters c H Cost of hiring one worker c F Cost of firing one worker c I Cost of holding one unit of inventory for one period c R Cost of producing one unit on regular time c 0 Incremental cost of producing one unit on overtime c S Cost to subcontract one unit of production n t Number of production days in period t K Aggregate number of aggregate products produced per worker per day I 0 Initial inventory on hand at the start of the planning horizon W 0 Initial workforce at the start of the planning horizon D t Demand in period t (assumed to be known and deterministic) T Number of time periods (planning horizon) t Time period

Murat Kaya, Sabancı Üniversitesi 23 Decision Variables W t Workforce level (number of workers) in period t P t Production level in period t (regular and overtime) I t Inventory level in period t H t Number of workers hired in period t F t Number of workers fired in period t O t Overtime production in units U t Worker idle time in production units S t Number of units produced (procured) via subcontracting Thus, Kn t W t : the number of units produced by the entire workforce in period t O t = P t - Kn t W t or U t = Kn t W t -P t

Murat Kaya, Sabancı Üniversitesi 24 Problem Constraints

Murat Kaya, Sabancı Üniversitesi 25 The LP Formulation

Murat Kaya, Sabancı Üniversitesi 26 The DensePack Example W 0 =300 I 0 =500 I 6 =600 All decision variables >=0

Murat Kaya, Sabancı Üniversitesi 27 Aggregate Plan Obtained from LP The cost of this plan is only $379,500 –considerably less than the cost achieved with the chase strategy or the constant workforce plan