ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass.

Slides:



Advertisements
Similar presentations
MCDW 2008, JLAB, Dec 8-12, Multi-pass Droplet Arc Design Guimei WANG (Muons Inc./ODU) Dejan Trbojevic (BNL) Alex Bogacz (JLAB)
Advertisements

Bunch compressor design for eRHIC Yichao Jing and Vladimir Litvinenko FLS2012, Newport News, VA 3/8/2012.
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
1 M. Popovic NFMC Collaboration Meeting IIT Muon (Pre)Acceleration for 8 GeV Proton Driver Linac Milorad Popovic FNAL 14-March.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
LHeC Test Facility Meeting
FFAG Concepts and Studies David Neuffer Fermilab.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Ajit Kurup, C. Bontoiu, M. Aslaninejad, J. Pozimski, Imperial College London. A.Bogacz, V. S. Morozov, Y.R. Roblin Jefferson Laboratory K. B. Beard, Muons,
J. Rodnizki SARAF, Soreq NRC HB2008, August, 2008 Nashville TN Lattice Beam dynamics study and loss estimation for SARAF/ EURISOL driver 40/60 MeV 4mA.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
Operated by JSA for the U.S. Department of Energy Muons, Inc. Winter MAP Mtg, Mar. 2 nd, 2011 Pre-Linac simulations in G4beamline Kevin B. Beard Muons,Inc.
Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory S. J. Brooks, RAL, Chilton, Oxfordshire, U.K. Tracking Code Non-linearised.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer, Andreas Van Ginneken, Daniel Elvira Fermilab.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Acceleration System Comparisons S. Machida ASTeC/RAL September, 2005, ISS meeting at CERN.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
1 Muon acceleration - amplitude effects in non-scaling FFAG - Shinji Machida CCLRC/RAL/ASTeC 26 April, ffag/machida_ ppt.
Operated by the Jefferson Science Associates for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz, Dogbone RLA – Design.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
1 International Design Study Front End & Variations David Neuffer January 2009.
Recent Progress Toward a Muon Recirculating Linear Accelerator S.A.Bogacz, V.S.Morozov, Y.R.Roblin 1, K.B.Beard 2, A. Kurup, M. Aslaninejad, C. Bonţoiu,
First Thoughts on IDS G H Rees, RAL. Topics 1.Two-way, μ ± injection chicane for the dog-bone RLA. 2.Injection energy & efficiency for a first dog-bone.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz EIC14 Workshop, Jefferson Lab, March 20,
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Acceleration Overview J. Scott Berg Brookhaven National Laboratory January 8, 2014.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Muon Collider Design Workshop, BNL, December 1-3, 2009.
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
How to use it? Basically, given a fieldmap for an RF structure, the time-dependent fields are E(x,y,z,t) = maxGradient * Eo(x,y,z) * sin(ω(t – timeOffset))
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
1 Muon Capture for a Muon Collider David Neuffer July 2009.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz Status and Plans for Linac and RLAs.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Status of Baseline Linac and RLAs Design.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Muon Acceleration – RLA, FFAG and Fast Ramping.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Recirculating Linac Acceleration  End-to-end.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Alex.
Muons, Inc. Modeling the Upper, Middle, & Lower NF linac in G4beamline Kevin B. Beard, Muons,Inc. & Alex Bogacz, Jefferson Lab LEMC2009 workshop 8-12 Jun.
WG2: Beam Dynamics, Optics and Instrumentation – Summary
Progress on the Linac and RLAs
The Accelerator Complex from the International Design Study
Modeling the Upper, Middle, & Lower
Progress on the Linac and RLAs
‘Multi-pass-Droplet’ Experiment
Modeling the Upper, Middle, & Lower
Status of Linac and RLAs – Simulations
Muon RLA - Design Status and Simulations
12 GeV CEBAF.
Muon RLA - Design Status and New Options
Linac and RLAs – Overview of NF-IDS
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
K.B. Beard1#, S.A. Bogacz2, V.S. Morozov2, Y.R. Roblin2
Progress on the Linac and RLAs
Morteza Aslaninejad Cristian Bontoiu Juergen Pozimski
RLA WITH NON-SCALING FFAG ARCS
Pre-Linac simulations in G4beamline Alex Bogacz & Yves Roblin
Muon RLA - Design Status and New Options
Muon RLA - Design Status and Simulations
Presentation transcript:

ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass linac, two recirculating linacs (RLA) and a fixed field alternating gradient accelerator (FFAG). As part of the study, our group simulated the muon acceleration from 0.2 to 12.6 GeV. The first linac follows the capture and bunching section and accelerates the muon of both signs from about 244 to 900 MeV 2,3. It must accept a high emittance beam about 30 cm wide with a 10% energy spread. 4 This linac uses counterwound, shielded superconducting solenoids and 201 MHz superconducting cavities Next is a 2½ pass 0.6 GeV/pass RLA which takes the beam from 0.9 to 3.6 GeV. It is injected at the middle of the linac and has 2 teardrop-shaped arcs at each end, and is extracted at the end of the linac. Muons of opposite sign travel in the same direction through the linac and in opposite directions around the arcs. The beta-beating technique is used to match the linac to all the arcs; no pulsed nor ramped magnets are needed. It is followed by very similar, but larger 2½ pass 2 GeV/pass RLA that takes the beam from 3.6 to 12.6 GeV. Simulations have been carried out on various sections using several codes including Zgoubi, OptiM 5, GPT 6, Elegant 7 and G4beamline 8, first to determine the optics and will later be used to estimate the radiation loads on the elements due to beam loss and muon decay. CONCLUSIONS AND FUTURE PLANS Generally, the GPT, OptiM, elegant, and G4beamline (with some RF phase adjustments) simulations are in good agreement. G4beamline 2.10 includes improvements (“ rfdevice ”) to better phase the linac. Longitudinal dynamics are still a challenge in the linac, but are ameliorated by running far off-crest. The RLAs have been simulated in OptiM and Elegant, but not yet in G4beamlin e. Much work remains to be done, especially on G4beamline simulations of the RLAs and chicanes. References Muons, Inc. Acknowledgements *Supported in part by US DOE STTR Grant DE-FG02- 08ER m [ [1]Interim Design Report, IDS-NF 020, [2]C. Bontoiu et al., IPAC'10, Kyoto, Japan, May 2010, pp [3]J. S. Berg et al., Phys. Rev. ST Accel. Beams, 9:011001,2006. [4]S.A. Bogacz. Nucl. Phys. B Proc. Suppl., 149:309–312, 2005 [5]V. Lebedev, OptiM - [6]B. van der Geer and M. J. de Loos. General Particle Tracer - [7]M. Borland, Elegant - [8]T.J.Roberts, G4beamline - [9] J. Pozimski et al., IPAC'10, Kyoto, Japan, May 2010, pp SIMULATIONS OF A MUON LINAC IN THE INTERNATIONAL DESIGN STUDY FOR THE NEUTRINO FACTORY * * K.B. Beard 1#, S.A. Bogacz 2, V.S. Morozov 2, Y.R. Rob lin 2 1 Muons Inc, 2 Jefferson Lab RLA I RLA II Pre-linac 244 MeV900 MeV 3.6 GeV 0.9 GeV 3.6 GeV 12.6 GeV 86 m 0.6 GeV/pass 202 m 255 m 2 GeV/pass 1m1m 1.75 m Longitudinal dynamics remains a challenge for this very large energy spread beam. G4beamline and OptiM models of linac-to-1 st RLA achromatic chicane BETA_X&Y[m] DISP_X&Y[m] BETA_XBETA_YDISP_XDISP_Y H -H V H -V 2 cells 4 cells Double achromat Optics -V V Beta-beating technique in 1 st RLA (linac only – arcs not shown) BETA_X&Y[m] DISP_X&Y[m] BETA_XBETA_YDISP_XDISP_Y 1.2 GeV 0.9 GeV 3.0 GeV 2.4 GeV 1.8 GeV 3.6 GeV Arc 4 Arc 3 Arc 2 Arc 1  x = 3.2 m  y = 6.0 m  x =-1.1  y =1.5  x,y →  x,y  xy →  xy  x,y →  x,y  xy →  xy  x,y →  x,y  xy →  xy  x,y →  x,y  xy →  xy  x = 7.9 m  y = 8.7 m  x =-0.8  y =1.3  x = 13.0 m  y = 14.4 m  x =-1.2  y =1.5 quad grad. Linac position Quad strength as a function of position withiin the RLA linac. ~ oncrest ~ 1 synch period t [nS] Pz [MeV/c] A bunch at the end of the linac with and without induced synchrotron motion.