Timing calibration using WR P.Kooijman. Fibre network Had a PRR of the network Comments reasonably positive Complicated system Build a full testbench.

Slides:



Advertisements
Similar presentations
Richard Young Optronic Laboratories Kathleen Muray INPHORA
Advertisements

Vladimír Smotlacha, CESNET Accurate Time Transfer over Optical Network 6 th CEF Networks Workshop Prague 13 September 2010.
Time Calibration Tests Results using a waveform template Cross-talk measurements Stub asymmetry results Kalle Sulanke David Hardtke Bob Stokstad.
Memory Aid Help.  b 2 = c 2 - a 2  a 2 = c 2 - b 2  “c” must be the hypotenuse.  In a right triangle that has 30 o and 60 o angles, the longest.
Learning Objectives Static and Dynamic Characteristics of Signals
Doc.:IEEE / ac Submission Richard van Nee, Qualcomm September 2009 Uplink MU-MIMO Sensitivity to Power Differences and Synchronization.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
JTAG over the internet!. The problem Until now device testing was physically (geographically) limited as the DUT (device under test) and the TAP controller.
1 Seventh Lecture Error Analysis Instrumentation and Product Testing.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Computer Science Detecting Malicious Beacon Nodes for Secure Location Discovery in Wireless Sensor Networks Presented by Akshay Lal.
Operational Amplifiers
Scientific Measurement Investigation: Det’n of Thickness of Al foil Counted versus Measured Quantities Significant Digits and Measurement - Rules for Significant.
CEMTREX, INC. MODCON SYSTEMS LTD NIR Systems July 2010.
Errors during the measurement process
Success depends upon the ability to measure performance. Rule #1:A process is only as good as the ability to reliably measure.
Reconfigurable Computing - Verifying Circuits Performance! John Morris Chung-Ang University The University of Auckland ‘Iolanthe’ at 13 knots on Cockburn.
Exact and Inexact Numbers. In scientific work, numbers are groups in two categories: exact numbers and inexact numbers. An exact number is a number that.
LECTURER PROF.Dr. DEMIR BAYKA AUTOMOTIVE ENGINEERING LABORATORY I.
Toby Shoobridge David Benham NERC Space Geodesy Facility Herstmonceux, UK
Time series Model assessment. Tourist arrivals to NZ Period is quarterly.
Chapter 2 Basic Principle of PLC PLC Configuration &Function   Basic Configuration  CPU  Memory  Programming Interface  Communication.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Statistical Process Control04/03/961 What is Variation? Less Variation = Higher Quality.
Hwk Ans Key. Experimental Errors & Uncertainty.
Control Theory Control System Objectives  Establish a final condition  Provide safe operation  Eliminate the human element  Assure economical operation.
Warm-up: Are these “errors”? 1. Misreading the scale on a triple-beam balance 2. Incorrectly transferring data from your rough data table to the final,
Errors and Uncertainties In Measurements and in Calculations.
FIBER OPTIC TRANSMISSION
Physical clock synchronization Question 1. Why is physical clock synchronization important? Question 2. With the price of atomic clocks or GPS coming down,
Norhayati Soin 06 KEEE 4426 WEEK 3/2 20/01/2006 KEEE 4426 VLSI WEEK 4 CHAPTER 1 MOS Capacitors (PART 3) CHAPTER MOS Capacitance.
Level 3 Practical Investigation Where to start?. Aim This is the purpose of your practical i.e. what it is that you want to find out This is the purpose.
CfE Advanced Higher Physics
Issues of the Synchronous Digital Hierarchy
Errors and Uncertainties
Unit 3 Physical Layer.
EQUILIBRIUM CONSTANTS. As its name suggests, “equilibrium” is a balance – a balance between the forward and reverse rates of a chemical reaction. But.
Measurements Measurements and errors : - Here, the goal is to have some understanding of the operation and behavior of electrical test instruments. Also,
Chapter 3 – Transistor Amplifiers – Part 1 Bipolar Transistor Amplifiers.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
Precise measurement of physical link delay 802.1as, IEEE 802 plenary Lu Huang
Standard & Canonical Forms COE 202 Digital Logic Design Dr. Aiman El-Maleh College of Computer Sciences and Engineering King Fahd University of Petroleum.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
Hypothesis Tests. An Hypothesis is a guess about a situation that can be tested, and the test outcome can be either true or false. –The Null Hypothesis.
The accuracy of averages We learned how to make inference from the sample to the population: Counting the percentages. Here we begin to learn how to make.
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
M. Circella, INFN Bari Time-calibration in NEMO VLVnT08 Time calibration in NEMO M. Circella, INFN Bari Time calibration The NEMO Phase 1&2 towers Time.
Global overview of the Optical Network for KM3Net Phase 1 Sander Mos KM3NeT Collaboration Meeting 30 January 2013 Marseille.
SUR-2250 Error Theory.
DOM acceptance and calibration
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
1) By using hamming code (even – parity), Show the correct binary number that transmitted by the sender if the receiver received binary number.
Preparatory Measurement
Report PRR on time calibration
TDR of PMT: Timing issues
ANTARES time calibration
Instrumentation for Colliding Beam Physics 2017
Characterizing FOX Demonstrator Test Setups for LArDPS to FEX Modules at CERN RuthAnn Gregory.
Logical time (Lamport)
Errors and Uncertainties
on behalf of the NEMO Collaboration
String-21 Flasher Analysis
NanoBPM Status and Multibunch Mark Slater, Cambridge University
CDK: Sections 11.1 – 11.4 TVS: Sections 6.1 – 6.2
Logical time (Lamport)
Logical time (Lamport)
Nanobeacon: A low cost calibration instrument for KM3NeT
Logical time (Lamport)
Presentation transcript:

Timing calibration using WR P.Kooijman

Fibre network Had a PRR of the network Comments reasonably positive Complicated system Build a full testbench Will work as a fibre network  This is what the network will look like

Two systems DU control  bidirectional DOM control/DATA  different returnpath

DU control path goes form ABRDC To BDU From CDU To DDU

Several contributions to the path ABRDC  Circulator Circulator  cable termination Cable termination  cable termination (MEOC) Cable termination  Junction Box in (IL cable) JB in  JB out (Amplification, splitting) Jbout  DUBASEin (IL cable) DUBASEin  BDU Circulator  DDU cable termination  Circulator Cable termination  cable termination (MEOC) Junction Box in (IL cable)  Cable termination JB out  JB in(Amplification, splitting) DUBASEin  Jbout (IL cable) BDU  DUBASEin Different paths up and down  need to be calibrated MEOC and Interlink cables have different fibre type

CPToulon L 100 km45 km B C (8  2) (-2.13 ns) (2  4) (-1.48 ns) (8  2) (-5.16 ns) (2  3) (-4.82 ns) Effect of dispersion in MEOC (have been measured)

SMF-28Bend-BriteNZDSF (It)NZDSF (Fr) Different characteristics for different fibres

Dispersion relatively small effect. Corrections maximally of the order of 5 ns We know the correction to 2-4% Systematic shifts of ps are possible Amplifiers are doped lengths of fiber (30-100m long) Lengths are not very critical for the amplification But Very high amplification is also longer length Can expect differences of a few metres up versus down  ~10 ns This has to be measured.

Device for measuring time delay  TCD (time calibration device) Was used to measure the MEOCs

Asymmetry on shore Measure somewhere beyond the circulator A BRDC  CT1 And CT1  D DU Is not critical where. Can use the TCD

Effect of not knowing exactly how long the interlinks are Dispersion is quite large in interlink cables Signal l (nm) t for 2x500 m interlink (ns) Dt (ns) t for 100 km (ns) Dt (ns) T total Asym. (ns) Asymmetry SC Downlink Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU Uplink DU

Ignoring dispersion difference of Interlinks gives a maximum error of 500 ps. Giving an approximate ratio of 1% (1 km of interlink  100 km MEOC) Which is about what we have corrects timing. If we now vary the MEOC length from 80 to 120 km the variation in timing is -60 ps to 60 ps. (ie we don’t know the real length to 20 %) If we vary the Interlink length by 10% the variation is 30 ps. Roughly knowing the lengths of the cables is sufficient

Conclusion for DU control We need to measure the delays in the Amplifiers  100 ps (up and down) We need to measure the delays on shore  100 ps (100 ps up and down) We need to know the ratio of Interlink length to MEOC to 10%  50 ps The time offset uses difference between up and down The round trip time uses the sum So both have identical errors Error on the timing will be of the order of 200 ps

The DOM control We have a different fibre back from DU than to DU for this system. Fibre lengths through the MEOC are variable although DOMs of 4 DUs have the same return fibre Clock at the bottom of the DU is synchronized so if the delay time from DU clock to DOM clock can be determined then the offset of the DOM clock can be determined Need the delay from here To here

RTT measurement from entrance to DUBASE Delay time from same point to BOB exit RTT measurement from entrance to DOM

When the string goes into the sea the pressure on and the temperature of the fibres will change  timing will change Dispersion variation due to temperature has been measured as  t = 40 ps/km/K Dispersion variation due to pressure  t = 3.8 ps/km/bar Plab = 1 bar Tlab = 20 (C) First DOM: P = 315 bar T=14 (C)  (314*3.8 -6*40)* 0.1 = 95 ps Last DOM: P=285 bar T= 14 (C)  (285*3.8 -6*40)* 0.8 = 675 ps

Putting together the RTT to the DU and the  t to the DOM  Can derive clock offset Putting together the RTT to the DU and the  t to the DOM and RTT to DOM -  derive clock offset within WR  determine asymmetry

Time error to DU Base 200ps Time error in string (100 ps)RTTDU +(100 ps)DelayVEOC +(100 ps)RTTDOMcalib + (10-60 ps) pressure and temperature correction = 180 ps Total error 270 ps This is also true for RTT DOM measurement as asymmetry and return delay Are chosen to reproduce this downward delay. Only errors that can occur are temperature variations on shore. If fibres have same temperature  coherent variation  RTT for DU will change by the same amount as RTT to DOM  The RTT variation will be split between both up and down going  Offset will not change Only if temperatures vary wildly over long distances will an error occur. 25 deg difference between DU control fibre and DOM fibre over 2 km gives 1 ns shift of timing. This would mean Cable is bare in sunlight over 2 km  we should do something about it !!

Systematics: Measuring the DOM RTT gives 18 measurements of the return delay that pass through the same fibre.  After correction for Dispersion and delay in the VEOC these should give consistent delay due to length of fibre.  Gives extra check on all corrections and delays in the system. The signals of 4 DUs go through the same fibre  Gives any differences in the seafloor lengths as the MEOC length is the same Other DUs go through different fibres  Measurement of the day night variation due to possibly different fibre temperatures  Gives an overall measurement of the stability and possible error on the timing measurements

TT measurement at same time as RTT measurement in “Green” Box. No need for full string dark room calibration

Conclusion  WR is useable in the DOM control system by measuring the RTT and down going time  Coherent variations of delays in different fibres leave the Offset of clocks unchanged  RTT measurement allows for a stringent consistency check of the timing system  Typical accuracy of the system is about 270 ps for the DOM synchronisation  TT measurement as part of DOM acceptance test  RTT DOM as part of DOM acceptance test  All calibration based on WR switch or CLB  The system is needed NOW if Line 1 is to be calibrated

All of this requires a process running in DOM that can on request give the RTT back to a shore process, that calculates the relevant asymmetries and can perform the regular systematic checks WR switches can only have one WR slave. WR switches can have more than one Ethernet uplink (already shown by CTA) Configuration 18 to 2 or 15 to 3 seem reasonable (highest rate in PPMDOM  run of 10 mins average = 1.2MHz = 60 Mbit*1.2(overhead) = 75 Mbit. For 18:2 multiplexing  675 Mbit  factor 2 below maximum  reasonable  start with 9:1 if problems can always buy a few more switches to go to 5:1 Conclusions II