1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.

Slides:



Advertisements
Similar presentations
Solar-B EIS Preliminary Design Review 6-7 July 2000 CCD Camera Design Chris McFee Mullard Space Science Laboratory.
Advertisements

Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
1 M. Auvergne. Natal October 2004 Instrument performances. Signal perturbations: Radiations. Scattered light. ACS. Temperature. Readout electronic. Calibrations.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
VLBI: Visible Light Broadband Imager Instrument Conceptual Design Presentation Tom Berger Lockheed Martin Solar and Astrophysics Lab.
LXO/MagEX Meeting Greenbelt, 24/10/07 Telescope Baseline Configuration: Imaging Capability (Micropore Optic) Telescope Field of View ~ 30° x 30° Angular.
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
Barry E. Burke Title Slide.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
1 Large Synoptic Survey Telescope Review Kirk Gilmore - SLAC DOE Review June 15, 2005.
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
SDW2005, juin, Taormina The Corot Space instrument.
Instituto de Astrofísica de Andalucía – C.S.I.C Research Institute of the Consejo Superior de Investigaciones Cientificas Main activities devoted to Astrophysics.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
Copyright : Marconi Applied Technologies Limited. All Rights Reserved. CCDs for Adaptive Optics CfAO Workshop: Nov 1999 By P.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
SIAMOIS, kickoff meeting, Paris, may, SIAMOIS: optical test bench BOSS (Banc Optique SiamoiS) Pernelle Bernardi Observatoire de Paris-Meudon,
AST3 detector properties
ISUAL Sprite Imager Electronic Design Stewart Harris.
Advanced Concepts & Science Payloads Office Eddicam/EST MeetingPage 1 CCD Procurement Schedule driven Review off-the shelf availability Specific mode of.
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
1 K. Gilmore - SDW The Large Synoptic Survey Telescope (LSST) Status Summary Kirk Gilmore SLAC/KIPAC.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
1 COROT WEAEK Meudon May The CCD performances by Miss Pernelle Bernardi Mr Tristan Buey and the CCD team on stage Régis Schmidt, Bertrand le.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
The Eddington Photometric Camera Working Group Eddington System Studies WG meeting ESA - HQ November 20 th, 2002 revised on Nov. 28th CAB W G.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
Edimburg June 2006 Fast detectors 1 Fast detectors (for E-ELT AO) Philippe Feautrier INSU/CNRS-LAOG.
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
Performances of the COROT CCDs for high accuracy photometry Pernelle Bernardi and the CCD team From Meudon : Tristan Buey, Vincent Lapeyrere, Régis Schmidt,
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Andreas Quirrenbach and the CARMENES Consortium Searching for Blue Planets Orbiting Red Dwarfs.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
1 Leonardo Pinheiro da Silva Corot-Brazil Workshop – October 31, 2004 Corot Instrument Characterization based on in-flight collected data Leonardo Pinheiro.
Opto-Mechanics for SNAP at UM
The experience of BEST Heike Rauer and the BEST Team Institut für Planetenforschung Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR) and Zentrum für.
Astronomical Institute University of Bern 31th IADC Meeting, April , 2013, ESOC, Darmstadt, Germany Improved Space Object Observation Techniques.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
1 Tom Dixon 1, Steven Goodman 2, Earl Aamodt 3, Hugh Christian 4 1 NASA /GSFC, 2 NOAA/NESDIS, 3 LMATC, 4 Ryco
CorotWeek 3, Liège 4-7/12/20021 (working on Saturday!!!) The CCD flight models Miss Pernelle Bernardi Mr Vincent Lapeyrere Mr Tristan Buey and the CCD.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Astronomical Observational Techniques and Instrumentation
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
1 WFC3 – Critical Science Review Science Driven CEIs Requirements.
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
Plato Consortium Kickoff Meeting, Paris 1 09-Nov-2010 Plato CCD and Front-End Electronics Dave Walton UCL/MSSL
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Incorporating Hubble Servicing with NASA’s Long-Term Vision
Announcements After a short lecture we will adjourn to the Farm. Tonight is a Dark Sky make-up night. Class will meet Thursday night. If clear: meet at.
NIRSpec Time Series Observations
ISUAL Imager Stewart Harris.
Single Object & Time Series Spectroscopy with JWST NIRCam
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
SLAC Program Review June 7, 2006 Kirk Gilmore Stanford/SLAC/KIPAC
LSST Camera Detector Status
Astronomical Observational Techniques and Instrumentation
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 2 Eddicam EddiCam design drivers –Integration times: 0.5 to 30 s –Number of stars to be monitored simultaneously: up to few times 10 5 –White light (TBC!!) –Duty cycle: > 90% –High photometric accuracy. Noise induced by random perturbations (readout noise, jitter, thermoelastic stability, CCD thermal stability,....): < photon noise.

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 3 Eddicam Preliminary baseline design –Ø 3° field of view (1.5° x 3° effective FOV in asteroseismology mode) – 20 CCD mosaic –broad band ( Å) coverage (white light)

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 4 Eddicam

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 5 Eddicam EddiCam location

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 6 Eddicam EddiCam components –Focal Plane Assembly: CCDs array FEE Frame store buffer covers Calibration LEDs Shutter/cover Thermal control subsystem

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 7 Eddicam CCD baseline characteristics –Format: 740 x 2900 pixels –Pixel size: 27 x 27 µm 2 –Chip size: 20 x 80 mm 2 –Full well capacity: 1.6 Me - –Minimum line readout time: 13 µs –Frame transfer time: 20 ms –Readout noise: e - at 0.5 MHz –Operational temperature:-80 / -100 C

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 8 Eddicam CCD read out noise as a function of readout frequency

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 9 Eddicam CCD array preliminary design – CCDs covering the full FOV –CCDs working in frame transfer mode for asteroseismology (short integrations on bright stars) –CCDs working in full frame mode for planet finding (long integrations on weaker stars)

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 10 Eddicam Planet finding CCD layout Asteroseismology layout Filters Frame transfer covers

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 11 Eddicam CCD mosaic proposed by Marconi: –20 CCDs on individual INVAR packages –Each CCD individually mounted on a large INVAR baseplate –All CCDs within ±10 µm from the baseplate: no individual focussing required –Flatness variation < 3 µm from +20 to -100 C –Butting gap around 500 µm

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 12 Eddicam Prototype of CCD array proposed by Marconi

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 13 Eddicam Detail of individual CCD chip package

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 14 Eddicam Detail of XMM-EPIC 7 CCD mosaic

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 15 Eddicam

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 16 Eddicam

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 17 Eddicam

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 18 Eddicam Wheel with 3 positions: closed open dispersive element Proably feasible, but expensive......

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 19 Eddicam –CCD Control Unit Integration time control Full frame/transfer frame operation CCDs windowing CCDs binning Selection of readout ports and speeds Generation of CCDs clocks, bias and power supply –Read Out Electronics CCD readout Digitization Data transmission to Data Processing Unit Simultaneously for 20 CCDs with 40 Mpixels

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 20 Eddicam –Data Processing Electronics Telecommand management of EddiCam Scientific onboard data processing (heavy!!) Generation of TM and communications with OBDH –Power conditioning electronics Conditioned power supply to CCU, FEE and ROE (very stable and low noise!) Power supply for shutter, LEDs and covers

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 21 Eddicam

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 22 Eddicam Preliminar budgets

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 23 Eddicam The EddiCam Definition Working Group Centro de Astrobiología — Instituto Nacional de Técnica Aeroespacial Centre Spatial de Liège + Universite de Liège Deutsches Zentrum für Luft und Raumfahrt (DLR-Berlin) Institute of Space Sensor Technology and Planetary Exploration Instituto de Astrofísica de Andalucía + Instituto de Astrofísica de Canarias Leicester University + Mullard Space Sciences Laboratory (London) Observatoire de Paris + DAPNIA / CEA (Saclay) Universität Wien

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 24 Eddicam

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 25 Eddicam EddiCam Definition Phase milestones –Mid July 2001: Official answer from ESA to the LoI. –September 2001: Telescope studies kick-off ==> interaction between Telescope and EddiCam –Summer - fall 2002: end of telescope, CCDs and mission studies. –End of 2002: EddiCam preliminary design and system specifications –Spring 2003: preliminary requirements review (PRR) ==> start of Phase B launch in 2007/08!!

1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 26 Eddicam